Académique Documents
Professionnel Documents
Culture Documents
Date:
Footing
Type
Pile Type
FT1
FT2
1 x 250 dia.
2 x 250 dia.
FT3
FT4
FT5
FT6
FT7
Lift
4 x 300 dia.
5 x 300 dia.
6 x 300 dia.
7 x 300 dia.
9 x 300 dia.
12 x 300 dia.
Pile shoe
Footing
Qty
Qty
point/FT
Total Pile
Point
18
9
27
13
13
2
14
1
1
1
2
18
18
36
52
65
12
98
9
12
4
5
6
7
9
12
44
71
248
284
18
18
36
52
65
12
98
9
12
Total Nos.
3
3
54
54
108
156
195
36
294
27
36
3
3
3
3
3
3
248
284
Unit
Rate/m
55.00
55.00
65.55
65.55
65.55
65.55
65.55
65.55
744
852
Amount (RM)
5,940.00
5,940.00
11,880.00
20,451.60
25,564.50
4,719.60
38,543.40
3,539.70
4,719.60
Unit
Rate/m
45.00
45.00
57.00
57.00
57.00
57.00
57.00
57.00
30.00
97,538.40
109,418.40
RM
ESTIMATED COST
Setting out
Mobilization (2 units piling rig)
Excavator
RM
284 points
3,000.00 (Btu)
2 months
x
+
x
RM
RM
RM
Amount (RM)
29,160.00
29,160.00
58,320.00
106,704.00
133,380.00
24,624.00
201,096.00
18,468.00
24,624.00
7,440.00
516,336.00
574,656.00
684,074.40
Paling Cost
n Length
(m)
(Estimate Total Joint
d
(nos)
Penetratio
n Depth
720
54
720
54
1,440
108
2,080
156
2,600
195
480
36
3,920
294
360
27
480
36
9,920
11,360
744
852
Amount (RM)
8,640.00
8,640.00
17,280.00
30,160.00
37,700.00
6,960.00
56,840.00
5,220.00
6,960.00
20.00
20.00
20.00
20.00
20.00
20.00
RM
RM
30.00 /points
7,000.00 (Miri)
10,000.00 /month
18.00
18.00
143,840.00
161,120.00
Note:
Kintown's
1)
2)
3)
4)
5)
6)
7)
Unit
Rate/joint
Amount (RM)
972.00
972.00
1,944.00
3,120.00
3,900.00
720.00
5,880.00
540.00
720.00
14,880.00
16,824.00
177,944.00
862,018.40
8,520.00
10,000.00
20,000.00
900,538.40
12/12/2012
Amount (RM)
95.00
95.00
95.00
95.00
95.00
95.00
12,060.00
12,060.00
24,120.00
197,600.00
247,000.00
45,600.00
372,400.00
34,200.00
45,600.00
942,400.00
966,520.00
RM
966,520.00
65,981.60
-7%