Proposed One Block of 6-Storey Executive Suites With Commercial Space on Lot 3493, Bintulu Town District, Jalan

Tun Razak, Bintulu.


Piling Works

Date:

Footing
Type

Pile Type

FT1
FT2

1 x 250 dia.
2 x 250 dia.

FT3
FT4
FT5
FT6
FT7
Lift

4 x 300 dia.
5 x 300 dia.
6 x 300 dia.
7 x 300 dia.
9 x 300 dia.
12 x 300 dia.
Pile shoe

Footing
Qty

Qty
point/FT

Total Pile
Point

18
9
27
13
13
2
14
1
1

1
2

18
18
36
52
65
12
98
9
12

4
5
6
7
9
12

44
71

Proposed Pile Type


6M
12M
Qty/ point Total Nos. Qty/ point
1
1
1
1
1
1
1
1

248
284

18
18
36
52
65
12
98
9
12

Pile Supply Cost (Corpex)


6M
12M

Total Nos.

3
3

54
54
108
156
195
36
294
27
36

3
3
3
3
3
3

248
284

Unit
Rate/m
55.00
55.00
65.55
65.55
65.55
65.55
65.55
65.55

744
852

Amount (RM)
5,940.00
5,940.00
11,880.00
20,451.60
25,564.50
4,719.60
38,543.40
3,539.70
4,719.60

Unit
Rate/m
45.00
45.00
57.00
57.00
57.00
57.00
57.00
57.00
30.00

97,538.40
109,418.40
RM

ESTIMATED COST
Setting out
Mobilization (2 units piling rig)
Excavator

RM

284 points
3,000.00 (Btu)
2 months

x
+
x

RM
RM
RM

Amount (RM)
29,160.00
29,160.00
58,320.00
106,704.00
133,380.00
24,624.00
201,096.00
18,468.00
24,624.00
7,440.00
516,336.00
574,656.00
684,074.40

Paling Cost
n Length
(m)
(Estimate Total Joint
d
(nos)
Penetratio
n Depth
720
54
720
54
1,440
108
2,080
156
2,600
195
480
36
3,920
294
360
27
480
36
9,920
11,360

744
852

Estimated Pile Driving & Jointing Cost


Unit
Rate/m
12.00
12.00
14.50
14.50
14.50
14.50
14.50
14.50

Amount (RM)
8,640.00
8,640.00
17,280.00
30,160.00
37,700.00
6,960.00
56,840.00
5,220.00
6,960.00

20.00
20.00
20.00
20.00
20.00
20.00

RM
RM

30.00 /points
7,000.00 (Miri)
10,000.00 /month

rates including :Provided the laydown area


The piling works can be completed in 35 days
Rectification will be provided for any piles crack or break
Setting out of piling points provided
To provided only mobilize machinery such as excavator & crane for 300mm dia spun piles.
Paling to provide crane or excavator to mobilize the 250mm dia. Spun piles.
Paling to provide site daily personnel to record the piling records.

18.00
18.00

143,840.00
161,120.00

Estimated Total Cost:

Note:
Kintown's
1)
2)
3)
4)
5)
6)
7)

Unit
Rate/joint

Amount (RM)
972.00
972.00
1,944.00
3,120.00
3,900.00
720.00
5,880.00
540.00
720.00
14,880.00
16,824.00
177,944.00
862,018.40
8,520.00
10,000.00
20,000.00
900,538.40

12/12/2012

Kintown Revised Rate


Supply, drive, joint &
setting out
Unit
Rate/m

Amount (RM)

95.00
95.00
95.00
95.00
95.00
95.00

12,060.00
12,060.00
24,120.00
197,600.00
247,000.00
45,600.00
372,400.00
34,200.00
45,600.00
942,400.00
966,520.00

RM

966,520.00

65,981.60
-7%