Date:
Project:
Venue:
Participants:
1. Engr. Md.Shamsuzzoha, Sr. DGM, SHL
2. Engr. N A Patwary, DGM, SHL
3. Engr. K H M Monzurul Haque, DPM, SHL
4. Mohammad Mohsin, APM, SHL
5. Architect Bhuiyan A R M Tareque, Project Architect, EKAR.
Sl No
3
4
5
Exhaust air and fresh air ventilation duct details in basement 1 will be
incorporated by architect.
Toilet at basement may be increased. Toilet vertical ventilation will
be incorporated.
Fireman lift/Service lift provision: Decision required from Principal
Architect.
Fuel tank will be around 6000 litre and located any convenient
location at outside of ground floor.
9
10
Remarks
Done
Don't want to loose any parking.
Fan can be located beside the
column at grid 1-F
Done
Done
Not possible at basement 1
capacity of the reservoirs are 36
m3 & 55 m3
incorporated with main sanitary
shaft
will be located at ground level
beside the loading & unloading
space
will have brick partition