HOJA DE METRADO

PROYECTO : AMPLIACION DE INFRAESTRUCTURA Y SUSTITUCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA I.E.

32223 MARIANO DAMASO BERAUN, DISTRITO DE AMARILIS HUANUCO - HUANUCO


OBRA

: CONSTRUCCION DE UN MODULO DE SEIS AULAS + LABORATORIO Y SALA DE COMPUTO +

SERVICIOS HIGINICOS Y BIBLIOTECA


FECHA

: DICIEMBRE DEL 2009

HECHO POR :

HOJA N
MEDIDAS

01.01

LARGO

ANCHO

ALTO

VECES

KG/ML
.25
.56
.99
1.55
2.24
3.97

SUB TOTAL

DE
UNIDAD

01

DESCRIPCION

ACERO 1/4"
3/8"
1/2"
5/8"
3/4"
1"

TOTAL
LONG.

AREA

VOL.

KG.

TRABAJOS PRELIMINARES
DESMONTAJE DE COBERTURA DE CALAMINA

1041.51

Modulo 1
Techo en ambientes de un nivel

M2

237.87

M2

340.15

M2

10.67

M2

247.60

M2

109.06

M2

96.16

Modulo 1

M2

126.66

(area medido en autocad por ser figura irregular)

M2

Aleros

M2

25.20

1.20

2.00

60.48

M2

6.00

0.80

1.00

4.80

1.20

2.00

76.32

161.28

Modulo 2

Modulo 3

Modulo 4
01.02

01.03

DESMONTAJE DE CIELORRASO DE TRIPLEY

M2

Aleros

M2

31.80

M2

25.20

3.20

2.00

M2

5.20

3.50

3.00

54.60

M2

37.89

3.20

2.00

242.50

M2

5.20

3.50

5.00

91.00

M2

5.32

3.00

1.00

15.96

M2

1.98

3.00

2.00

11.88

M2

9.00

3.00

2.00

54.00

M2

4.85

3.00

2.00

29.10

M2

10.40

3.00

2.00

62.40

M2

23.69

3.00

2.00

142.14

M2

6.60

3.00

2.00

39.60

M2

10.31

3.00

2.00

61.86

M2

6.90

3.00

2.00

41.40

M2

21.70

3.20

2.00

138.88

M2

3.65

3.50

4.00

51.10

Modulo 1

M2

25.20

1.65

1.00

41.58

Modulo 2

M2

31.80

1.65

1.00

52.47

SS.HH.

M2

14.50

1.20

1.00

17.40

Modulo 4

M2

9.30

0.50

1.00

4.65

exteriores

M2

8.62

1.00

1.00

8.62

M2

8.66

1.00

1.00

8.66

M2

8.34

1.00

2.00

16.68

M2

4.10

4.00

1.00

16.40

Modulo 3

1007.72

DEMOLICION DE MUROS DE LADRILLO


SS.HH.

01.06

186.33

DEMOLICION DE MUROS DE ADOBE

Modulo 2

01.05

4.80

Modulo 2

Modulo 1

01.04

459.39

189.98

DEMOLICION DE VEREDAS

166.46

DEMOLICION DE PISO PULIDO


Modulo 1

367.85
M2

126.66

M2

4.80

HOJA DE METRADO
PROYECTO : AMPLIACION DE INFRAESTRUCTURA Y SUSTITUCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA I.E.

32223 MARIANO DAMASO BERAUN, DISTRITO DE AMARILIS HUANUCO - HUANUCO


OBRA

: CONSTRUCCION DE UN MODULO DE SEIS AULAS + LABORATORIO Y SALA DE COMPUTO +

SERVICIOS HIGINICOS Y BIBLIOTECA


FECHA

: DICIEMBRE DEL 2009

HECHO POR :

HOJA N
MEDIDAS

01.08

01.09

LARGO

ANCHO

ALTO

M2

186.33

M2

50.06

M3

techo (area medido en autocad)

M3

Cimiento

M3

0.25

3.00

26.00

0.50

0.70

8.00
52.30

1.50
0.20

2.00

10.46
18.20

REMOSION Y ELIMINACION DE ESTRUCTURAS DEMOLIDAS CON MAQUINARIA DIST.= 4 KM.

515.17

M3

0.40

1.00

1007.72

403.09

- Demolicin de muros de ladrillo e = 0.15 cm.

M3

0.15

1.00

189.98

28.50

- Demolicin de veredas e = 0.10 cm.

M3

0.10

1.00

166.46

16.65

- Demolicin de piso pulido e = 0.10 cm.

M3

0.10

1.00

367.85

36.79

- Demolicin de estructuras de concreto armado

M3

1.00

30.16

30.16

CARTEL DE OBRA BANNER (GIGANTOGRAFIA) INCLUYE BASTIDORES Y PARANTES DE MADERA TORNILLO DE 2.40 x 3.60 M. SEGUN DI

376.47
M2

40.35

9.33

1.00

376.47

M2

40.35

9.33

1.00

376.47

TRAZO NIVELES Y REPLANTEO PRELIMINAR

376.47

TRAZO Y CONTROL DE NIVELES DURANTE LA LA CONSTRUCCION

4.00

Mes

4.00

KG

1.00

TRANSPORTE DE MATERIALES LOCAL

1.00

TRANSPORTE VERTICAL Y HORIZONTAL DE MATERIALES EN OBRA


Transporte vertical y horizontal de materiales en obra

02

MOVIMIENTO DE TIERRAS

02.01

CORTE Y NIVELACION DE TERRENO MANUAL

1.00

1.00

LIMPIEZA DE TERRENO MANUAL

Transporte de Materiales Local


01.14

KG.

30.16
0.25

- Demolicin de muros de adobe e = 0.40 cm.

Trazo y control de niveles durante la construccin


01.13

VOL.

DEMOLICION DE ESTRUCTURAS DE CONCRETO CON EQUIPO


Columnas

Trazo nivel y replanteo


01.12

AREA

ss.hh.

Limpieza de Terreno
01.11

TOTAL
LONG.

Modulo 2

Pza
01.10

VECES

KG/ML
.25
.56
.99
1.55
2.24
3.97

SUB TOTAL

DE
UNIDAD

01.07

DESCRIPCION

ACERO 1/4"
3/8"
1/2"
5/8"
3/4"
1"

1.00

Glb.

1.00

PROMEDIO

- Seccion del terreno en general(aulas)


02.02

M3

0.10

376.47

37.65

EXCAVACION DE ZANJAS PARA CIMIENTOS HASTA 1.70 M. EN TERRENO NORMAL

#N/A

- Eje C (seccin 1-1)

M3

29.61

1.50

1.73

1.00

76.62

- Eje A (seccin 1-1) (seccin 3-3)

M3

32.61

1.50

1.73

1.00

#N/A

- Eje 1 y 12 (seccin 14-14)

M3

8.37

1.50

1.73

2.00

#N/A

- Eje 4 (seccin 2-2)

M3

8.37

1.50

1.73

1.00

#N/A

- Ejes (7,8),(9,10) (seccin 4-4)

M3

8.37

1.50

1.77

2.00

#N/A

- Eje 11 (seccin 6-6)

M3

5.37

0.50

0.75

1.00

#N/A

- Eje B' (seccin 5-5)

M3

3.00

1.50

1.73

1.00

#N/A

- Cimiento en deposito (seccin G-G)

M3

3.62

0.80

1.50

1.00

#N/A

SS.HH de Mujeres Seccin 6-6

M3

2.20

0.40

0.80

1.00

0.70

SS.HH de Varones Seccin 6-6

M3

2.20

0.40

0.80

1.00

0.70

SS.HH de Mujeres Seccin 4-4

M3

1.76

0.40

0.80

4.00

2.25

SS.HH de Varones Seccin 4-4

M3

1.76

0.40

0.80

4.00

2.25

- Muros interiores de SS.HH.

02.03

RELLENO Y COMPACTADO EN ZANJAS CON EQUIPO LIVIANO (CON MATERIAL PROPIO)

#N/A
Area

- Eje C (seccin 1-1)

M3

29.61

1.00

1.44

42.64

HOJA DE METRADO
PROYECTO : AMPLIACION DE INFRAESTRUCTURA Y SUSTITUCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA I.E.

32223 MARIANO DAMASO BERAUN, DISTRITO DE AMARILIS HUANUCO - HUANUCO


OBRA

: CONSTRUCCION DE UN MODULO DE SEIS AULAS + LABORATORIO Y SALA DE COMPUTO +

SERVICIOS HIGINICOS Y BIBLIOTECA


FECHA

: DICIEMBRE DEL 2009

HECHO POR :

HOJA N
MEDIDAS

02.04

UNIDAD

LARGO

- Eje A (seccin 1-1) (seccin 3-3)

M3

32.61

- Eje 1 y 12 (seccin 14-14)

M3

8.37

- Eje 4 (seccin 2-2)

M3

- Ejes (7,8),(9,10) (seccin 4-4)

ANCHO

ALTO

VECES

TOTAL
AREA

VOL.

1.00

1.44

#N/A

2.00

1.41

#N/A

8.37

1.00

1.44

#N/A

M3

8.37

2.00

1.12

#N/A

- Eje B' (seccin 5-5)

M3

3.00

1.00

1.20

#N/A

- Cimiento en deposito (seccin G-G)

M3

3.62

1.00

0.22

#N/A

LONG.

ELIMINACION DE MATERIAL EXCEDENTE CON MAQUINARIA DIST.= 4 KM.


(Relleno/ material propio)

Corte
M3

37.65

KG/ML
.25
.56
.99
1.55
2.24
3.97

SUB TOTAL

DE

- Excav. c/maq + Excav. Para cimientos) -

02.05

DESCRIPCION

ACERO 1/4"
3/8"
1/2"
5/8"
3/4"
1"

KG.

#N/A
Cim.
#N/A

Rell.
#N/A

1.00

#N/A

NIVELACION RELLENO Y APISONADO INTERIOR P/RECIBIR FALSO PISO E= 4" C/EQUIPO LIVIANO CON MATERIAL PROPIO
- Laboratorio y Sala de computo

M2

12.40

6.87

- SS.HH. Varones y Mujeres)area medido en autocad

M2

25.03

- Depsito de Escalera

M2

3.76

1.80

- Depsito de Escalera

M2

1.80

1.94

2.00

170.38

2.00

50.06

1.00

6.77

1.00

3.49

230.70

HOJA DE METRADO
PROYECTO : AMPLIACION DE INFRAESTRUCTURA Y SUSTITUCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA I.E.

32223 MARIANO DAMASO BERAUN, DISTRITO DE AMARILIS HUANUCO - HUANUCO


OBRA

: CONSTRUCCION DE UN MODULO DE SEIS AULAS + LABORATORIO Y SALA DE COMPUTO +

SERVICIOS HIGINICOS Y BIBLIOTECA


FECHA

: DICIEMBRE DEL 2009

HECHO POR :

HOJA N
MEDIDAS

ALTO

VECES

TOTAL
LONG.

AREA

VOL.

M2

40.34

1.50

1.00

#N/A

- Vereda posterior - aulas

M2

27.18

0.80

1.00

#N/A

- Vereda posterior - Escalera

M2

4.38

0.80

1.00

#N/A

- Vereda posterior - SS.HH.

M2

10.38

0.80

1.00

#N/A

- Vereda laterales Aulas y SS.HH.

M2

7.23

0.80

2.00

#N/A

M2

1.37

0.80

2.00

#N/A

M2

22.57

1.80

1.00

40.63

- Eje C (seccin 1-1)

M2

29.61

1.50

1.00

#N/A

- Eje A (seccin 1-1) (seccin 3-3)

M2

32.61

1.50

1.00

#N/A

- Eje 1 y 12 (seccin 14-14)

M2

8.37

1.50

2.00

#N/A

- Eje 4 (seccin 2-2)

M2

8.37

1.50

1.00

#N/A

- Ejes (7,8),(9,10) (seccin 4-4)

M2

8.37

1.50

2.00

#N/A

- Eje B' (seccin 5-5)

M2

3.00

1.50

1.00

#N/A

OBRAS DE CONCRETO SIMPLE

03.01

CIMIENTO

03.01.01

SOLADO e=3" MEZCLA 1:12 CEM-HOR

#N/A

FALSA CIMENTACION MEZCLA 1:12 CEMENTO-HORMIGON + 30 % DE PIEDRA GRANDE


- Cimiento en deposito (seccin G-G)

KG.

#N/A

- Vereda frontal -aulas, escalera y SS.HH.

03

03.01.03

ANCHO

AFIRMADO DE 4" PARA VEREDAS CON EQUIPO LIVIANO

- Vereda entre modulo de tres pisos y dos pisos

03.01.02

LARGO

KG/ML
.25
.56
.99
1.55
2.24
3.97

SUB TOTAL

DE
UNIDAD

02.06

DESCRIPCION

ACERO 1/4"
3/8"
1/2"
5/8"
3/4"
1"

M3

3.62

0.80

1.01

0.35

1.00

1.01

CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% PIEDRA GRANDE

#N/A

- Eje C (seccin 1-1)

M3

29.61

0.30

0.70

1.00

6.22

- Eje A (seccin 1-1) (seccin 3-3)

M3

32.61

0.30

0.70

1.00

#N/A

- Eje 1 y 12 (seccin 14-14)

M3

8.37

0.30

0.70

2.00

#N/A

- Eje 4 (seccin 2-2)

M3

8.37

0.30

0.70

1.00

#N/A

- Ejes (7,8),(9,10) (seccin 4-4)

M3

8.37

0.57

0.70

2.00

#N/A

- Eje 11 (seccin 6-6)

M3

5.37

0.50

0.60

1.00

#N/A

- Eje B' (seccin 5-5)

M3

3.00

0.30

0.40

1.00

#N/A

- Cimiento en deposito (seccin G-G)

M3

3.62

0.80

0.80

1.00

2.32

SS.HH de Mujeres Seccin 6-6

M3

2.20

0.40

0.60

1.00

0.53

SS.HH de Varones Seccin 6-6

M3

2.20

0.40

0.60

1.00

0.53

SS.HH de Mujeres Seccin 4-4

M3

1.76

0.40

0.60

4.00

1.69

SS.HH de Varones Seccin 4-4

M3

1.76

0.40

0.60

4.00

1.69

- Eje C (seccin 1-1)

M2

29.61

0.70

2.00

#N/A

- Eje A (seccin 1-1) (seccin 3-3)

M2

29.61

0.70

2.00

#N/A

- Eje 1 y 12 (seccin 14-14)

M2

8.37

0.70

4.00

#N/A

- Eje 4 (seccin 2-2)

M2

8.37

0.70

2.00

#N/A

- Ejes (7,8),(9,10) (seccin 4-4)

M2

8.37

0.70

4.00

#N/A

- Eje B' (seccin 5-5)

M2

3.00

0.40

2.00

#N/A

- Muros interiores de SS.HH.

03.01.04

03.02
03.02.01

ENCOFRADO Y DESENCOFRADO EN CIMIENTO

#N/A

SOBRECIMIENTO
CONCRETO EN SOBRECIMIENTO 1:8 CEMENTO HORMIGON + 25% PIEDRA MEDIANA

#N/A

- Eje C laboratorio y computo - SS.HH. (secc.1-1)


Aulas

M3

3.04

0.13

0.45

2.00

0.36

Aulas

M3

3.00

0.13

0.45

4.00

0.70

SS.HH.

M3

3.04

0.13

0.45

2.00

0.36

Aulas

M3

1.94

0.13

0.45

1.00

#N/A

Aulas

M3

3.00

0.13

0.45

2.00

#N/A

Aulas

M3

1.90

0.13

0.45

3.00

#N/A

SS.HH.

M3

1.94

0.13

0.45

2.00

0.23

- Eje A laboratorio y computo - SS.HH./secc.1-1)

HOJA DE METRADO
PROYECTO : AMPLIACION DE INFRAESTRUCTURA Y SUSTITUCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA I.E.

32223 MARIANO DAMASO BERAUN, DISTRITO DE AMARILIS HUANUCO - HUANUCO


OBRA

: CONSTRUCCION DE UN MODULO DE SEIS AULAS + LABORATORIO Y SALA DE COMPUTO +

SERVICIOS HIGINICOS Y BIBLIOTECA


FECHA

: DICIEMBRE DEL 2009

HECHO POR :

HOJA N
MEDIDAS

DESCRIPCION

ACERO 1/4"
3/8"
1/2"
5/8"
3/4"
1"

KG/ML
.25
.56
.99
1.55
2.24
3.97

SUB TOTAL

DE

TOTAL

UNIDAD

LARGO

ANCHO

ALTO

VECES

LONG.

AREA

VOL.

- Ejes 1, y 12 (Seccin 14-14)

M3

6.15

0.23

0.45

2.00

#N/A

- Eje 4 (Seccin 2-2)

M3

6.15

0.23

0.45

1.00

#N/A

- Ejes (7 y 10) (seccin 4-4)

M3

6.15

0.23

0.45

2.00

#N/A

- Ejes (8 y 9) (seccin 4-4)

M3

3.98

0.23

0.45

2.00

0.82

- Ejes 11 (Seccin 6-6)

M3

6.00

0.13

0.45

1.00

#N/A

SS.HH de Mujeres Seccin 4-4

M3

1.95

0.13

0.30

4.00

0.30

SS.HH de Varones Seccin 4-4

M3

1.95

0.13

0.30

4.00

0.30

- Seccion 5-5 escaleras

M3

3.37

0.13

0.80

1.00

0.35

- Seccion G-G en deposito

M3

4.30

0.13

0.68

1.00

0.38

KG.

- Muros de SS.HH. Independientes

03.02.02

ENCOFRADO Y DESENCOFRADO NORMAL PARA SOBRECIMIENTO HASTA 0.40 M.

#N/A

- Eje C laboratorio y computo - SS.HH. (secc.1-1)


Aulas

M2

3.04

0.45

4.00

5.47

Aulas

M2

3.00

0.45

8.00

10.80

SS.HH.

M2

3.04

0.45

4.00

5.47

Aulas

M2

1.94

0.45

2.00

#N/A

Aulas

M2

3.00

0.45

4.00

#N/A

Aulas

M2

1.90

0.45

6.00

#N/A

SS.HH.

M2

1.94

0.45

4.00

#N/A

- Ejes 1, y 12 (Seccin 14-14)

M2

6.15

0.45

4.00

#N/A

- Eje 4 (Seccin 2-2)

M2

6.15

0.45

2.00

#N/A

- Ejes (7 y 10) (seccin 4-4)

M2

6.15

0.45

4.00

#N/A

- Ejes (8 y 9) (seccin 4-4)

M2

3.98

0.45

4.00

#N/A

- Ejes 11 (Seccin 6-6)

M2

6.00

0.45

2.00

#N/A

SS.HH de Mujeres Seccin 4-4

M2

1.95

0.30

8.00

4.68

SS.HH de Varones Seccin 4-4

M2

1.95

0.30

8.00

4.68

- Seccion 5-5 escaleras

M2

3.37

0.80

2.00

5.39

- Seccion G-G en deposito

M2

4.30

0.68

2.00

5.85

- Eje A laboratorio y computo - SS.HH./secc.1-1)

- Muros de SS.HH. Independientes

03.02.03

ACERO EN SOBRECIMIENTO F'Y=4,200 KG/CM2 GRADO60

29.25

- Seccion 5-5 escaleras

1.00

1/2"

KG

1.15

0.99

19.00

21.63

KG

0.70

0.99

11.00

7.62

0.15
- Seccion G-G en deposito

0.70

HOJA DE METRADO
PROYECTO : AMPLIACION DE INFRAESTRUCTURA Y SUSTITUCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA I.E.

32223 MARIANO DAMASO BERAUN, DISTRITO DE AMARILIS HUANUCO - HUANUCO


OBRA

: CONSTRUCCION DE UN MODULO DE SEIS AULAS + LABORATORIO Y SALA DE COMPUTO +

SERVICIOS HIGINICOS Y BIBLIOTECA


FECHA

: DICIEMBRE DEL 2009

HECHO POR :

HOJA N
MEDIDAS

03.03.01

03.03.02

03.04.01

03.04.02

04.01
04.01.01

04.02
04.02.01

04.02.02

AREA

VOL.

KG.

180.64

12.40

6.87

2.00

170.38

- Depsito de Escalera

M2

3.76

1.80

1.00

6.77

- Depsito de Escalera

M2

1.80

1.94

1.00

3.49

50.06

CONCRETO EN FALSO PISO DE 4" CEM:HOR 1:8 ACABADO PARA PISO CERAMICO

50.06

M2

25.03

2.00

ML

6.37

2.00

12.74

ML

12.33

1.00

12.33

ML

6.37

2.00

12.74

ML

12.33

1.00

12.33

JUNTAS EN FALSO PISO e= 1/2"

50.14

CONCRETO EN FALSO PISO DE 1.5" CEM:HOR 1:10 PARA PISO MACHIEMBRADO EN SEGUNDO Y TERCER PISO

394.34

- Aulas

M2

8.20

6.87

6.00

338.00

- Biblioteca

M2

8.20

6.87

1.00

56.33

MUROS DE CONCRETO EN LAVADERO Y URINARIO


ENCOFRADO Y DESENCOFRADO NORMAL EN LAVADERO Y URINARIO

2.43

EN URINARIO

M2

4.48

0.20

2.00

1.79

EN LAVADERO

M2

0.40

0.40

4.00

0.64

0.40

0.13

0.40

4.00

0.08

4.48

0.20

0.10

1.00

0.09

MUROS DE CONCRETO PARA LAVADERO F'C=140 KG/CM2


M3

.08

MUROS DE CONCRETO PARA URINARIO F'C=175 KG/CM2


Urinario

04

TOTAL
LONG.

M2

Lavadero
03.04.03

VECES

CONCRETO EN FALSO PISO DE 4" CEM:HOR 1:8 PARA PISO PULIDO

- Sala de computo

03.04

ALTO

- Laboratorio y Sala de computo

- Laboratorio

03.03.04

ANCHO

FALSO PISO

- SS.HH. Varones y Mujeres)area medido en autocad

03.03.03

LARGO

KG/ML
.25
.56
.99
1.55
2.24
3.97

SUB TOTAL

DE
UNIDAD

03.03

DESCRIPCION

ACERO 1/4"
3/8"
1/2"
5/8"
3/4"
1"

M3

.09

OBRAS DE CONCRETO ARMADO


CIMIENTOS REFORZADOS
CONCRETO EN CIMIENTOS REFORZADOS F'C=175 KG/CM2

#N/A

- Eje C (seccin 1-1)

M3

29.61

1.50

0.30

1.00

#N/A

- Eje A (seccin 1-1) (seccin 3-3)

M3

32.61

1.50

0.30

1.00

#N/A

- Eje 1 y 12 (seccin 14-14)

M3

8.37

1.50

0.30

2.00

#N/A

- Ejes 4 (seccin 2-2)

M3

8.37

1.50

0.30

1.00

#N/A

- Ejes (7,8),(9,10) (seccin 4-4)

M3

8.37

1.50

0.30

2.00

#N/A

- Eje B' (seccin 5-5)

M3

3.00

1.50

0.30

1.00

#N/A

VIGAS DE CIMENTACION
CONCRETO EN VIGAS DE CIMENTACION F'C=175 KG/CM2

#N/A

- Eje C

M3

35.08

0.30

0.50

1.00

#N/A

- Eje A

M3

38.80

0.30

0.50

1.00

#N/A

- Eje 1 aulas

M3

6.25

0.30

0.50

1.00

#N/A

- Eje 4 aulas

M3

6.25

0.30

0.50

1.00

#N/A

- Ejes (7 y 8) (9 y 10)

M3

6.25

0.57

0.50

2.00

#N/A

- Eje 12

M3

6.25

0.30

0.50

1.00

#N/A

- Eje B'

M3

3.73

0.30

0.50

1.00

#N/A

ENCOFRADO Y DESENCOFRADO VIGAS DE CIMENTACION

#N/A

- Eje C

M2

35.08

0.50

2.00

#N/A

- Eje A

M2

38.80

0.50

2.00

#N/A

- Eje 1 aulas

M2

6.25

0.50

2.00

#N/A

- Eje 4 aulas

M2

6.25

0.50

2.00

#N/A

- Ejes (7 y 8) (9 y 10)

M2

6.25

0.50

4.00

#N/A

HOJA DE METRADO
PROYECTO : AMPLIACION DE INFRAESTRUCTURA Y SUSTITUCION DE INFRAESTRUCTURA Y EQUIPAMIENTO DE LA I.E.

32223 MARIANO DAMASO BERAUN, DISTRITO DE AMARILIS HUANUCO - HUANUCO


OBRA

: CONSTRUCCION DE UN MODULO DE SEIS AULAS + LABORATORIO Y SALA DE COMPUTO +

SERVICIOS HIGINICOS Y BIBLIOTECA


FECHA

: DICIEMBRE DEL 2009

HECHO POR :

HOJA N
MEDIDAS

DESCRIPCION

ACERO 1/4"
3/8"
1/2"
5/8"
3/4"
1"

SUB TOTAL

DE
UNIDAD

LARGO

- Eje 12

M2

- Eje B'

M3

ANCHO

KG/ML
.25
.56
.99
1.55
2.24
3.97

TOTAL

ALTO

VECES

LONG.

AREA

6.25

0.50

2.00

#N/A

3.73

0.50

2.00

#N/A

VOL.

KG.

HOJA DE METRADO
PROYECTO : AMPLIACION DE INFRAESTRUCTURA Y SUSTITUCION DE INFRAESTRUCTURA Y

EQUIPAMIENTO DE LA I.E. 32223 MARIANO DAMASO BERAUN, DISTRITO DE AMARILIS


HUANUCO - HUANUCO

OBRA

: CONSTRUCCION DE UN MODULO DE SEIS AULAS + LABORATORIO Y SALA DE COMPUTO +

FECHA

: DICIEMBRE DEL 2009

SERVICIOS HIGINICOS Y BIBLIOTECA

N
04.01.02

HECHO POR :
UNIDAD

KG/ML

1/4"

.25

3/8"
1/2"
5/8"
3/4"

.56
.99
1.55
2.24

SUB
TOTAL
KG.

TOTAL

NEALSO

MEDIDAS

DESCRIPCION

ACERO

LARGO

ACERO KG/ML

3/8

5/8

3/4

N
DE
VECES

1073.67

ACERO EN CIMIENTO REFORZADO F'Y=4,200 KG/CM2 GRADO 60


- Eje C (seccin 1-1)
26.96
Traslape

3/8" @

0.20

KG

28.16

0.56

1/2" @

0.35

KG

1.50

3/8" @

0.20

KG

10.76

1/2" @

0.35

KG

1.50

3/8" @

0.20

KG

42.51

1/2" @

0.35

KG

1.50

3/8" @

0.20

KG

8.37

1/2" @

0.35

KG

1.50

3/8" @

0.20

KG

8.37

1/2" @

0.35

KG

1.50

M3

8.37

1.50
0.56

7.50

118.27

77.03

114.39

7.50

45.19

29.03

43.11

7.50

178.54

114.60

170.18

15.00

70.31

47.83

71.03

7.50

35.15

23.91

35.51

15.00

70.31

47.83

71.03

7.50

25.20

17.14

25.46

1.20 m.
1.50
10.16

Traslape

0.99
0.56

0.60 m.
1.50

0.99

- Eje A (seccin 1-1) (seccin 3-3)


40.11
Traslape

0.56

2.40 m.
1.50

0.99

- Eje 1 y 12 (seccin 14-14)


8.37

1.50

0.56

0.99

- Ejes 4 (seccin 2-2)


8.37

1.50
- Ejes (7,8),(9,10) (seccin 4-4)
8.37

1.50

1.50

0.99

3/8" @

0.20

KG

8.37

1/2" @

0.35

KG

1.50

M3

3.00

1.50
0.56

- Eje B' (seccin 5-5)


6.00

0.56

3/8" @

0.20

KG

6.00

1/2" @

0.35

KG

1.50

0.30

2.00

0.99

0.30

0.99

1.00

HOJA DE METRADO
PROYECTO : AMPLIACION DE INFRAESTRUCTURA Y SUSTITUCION DE INFRAESTRUCTURA Y

EQUIPAMIENTO DE LA I.E. 32223 MARIANO DAMASO BERAUN, DISTRITO DE AMARILIS


HUANUCO - HUANUCO

OBRA

: CONSTRUCCION DE UN MODULO DE SEIS AULAS + LABORATORIO Y SALA DE COMPUTO +

FECHA

: DICIEMBRE DEL 2009

SERVICIOS HIGINICOS Y BIBLIOTECA

N
04.02.03

HECHO POR :
UNIDAD

KG/ML

1/4"

.25

3/8"
1/2"
5/8"
3/4"

.56
.99
1.55
2.24

SUB
TOTAL
KG.

TOTAL

NEALSO

MEDIDAS

DESCRIPCION

ACERO

ACERO KG/ML

LARGO

3/8

5/8

3/4

N
DE
VECES

2386.11

ACERO EN VIGA DE CIMENTACION F'Y=4,200 KG/CM2 GRADO 60


Eje A (VC-01 (30 x 80)
38.81
0.20

3/4"

KG

41.61

2.24

2.00

186.41

2.47

3/4"

KG

2.47

2.24

4.00

22.13

2.47

3/4"

KG

2.47

2.24

6.00

33.20

3.16

3/4"

KG

3.16

2.24

1.00

7.08

2.31

5/8"

KG

2.31

2.00

7.16

3.05

3/4"

KG

3.05

6.00

40.99

2.92

5/8"

KG

2.92

2.00

9.05

40.01

3/4"

KG

42.41

2.00

190.00

3/8"

KG

2.20

261.00

321.55

3/4"

KG

26.10

2.24

2.00

116.93

2.47

3/4"

KG

2.47

2.24

2.00

11.07

2.47

3/4"

KG

2.47

2.24

5.00

27.66

2.31

5/8"

KG

2.31

2.00

7.16

3.05

3/4"

KG

3.05

5.00

34.16

26.90

5/8"

KG

28.10

2.00

87.11

3/8"

KG

2.20

172.00

211.90

Traslape

0.20
2.40 m.

Traslape

1.55

2.24

1.55

2.24

2.40 m.

0.30

0.80

0.56

Eje C (VC-02 (30 x 80) DEL 1 AL 7


25.70
0.20

0.20

Traslape

1.55

2.24

1.55

1.20 m.

0.30

0.80

0.56

HOJA DE METRADO
PROYECTO : AMPLIACION DE INFRAESTRUCTURA Y SUSTITUCION DE INFRAESTRUCTURA Y

EQUIPAMIENTO DE LA I.E. 32223 MARIANO DAMASO BERAUN, DISTRITO DE AMARILIS


HUANUCO - HUANUCO

OBRA

: CONSTRUCCION DE UN MODULO DE SEIS AULAS + LABORATORIO Y SALA DE COMPUTO +

FECHA

: DICIEMBRE DEL 2009

SERVICIOS HIGINICOS Y BIBLIOTECA

HECHO POR :
UNIDAD

KG/ML

1/4"

.25

3/8"
1/2"
5/8"
3/4"

.56
.99
1.55
2.24

SUB
TOTAL
KG.

TOTAL

NEALSO

MEDIDAS

DESCRIPCION

ACERO

ACERO KG/ML

LARGO

3/8

5/8

3/4

N
DE
VECES

Eje C (VC-02 (30 x 80) DEL 10 AL 12


8.84
0.20

0.20

3/4"

KG

9.24

2.47

5/8"

KG

2.47

2.31

5/8"

KG

3.05

5/8"

10.10

0.80

2.24

2.00

41.40

1.55

4.00

15.31

2.31

1.55

2.00

7.16

KG

3.05

1.55

2.00

9.46

3/4"

KG

10.10

2.00

45.25

3/8"

KG

2.20

60.00

73.92

0.20

3/4"

KG

7.60

4.00

68.10

0.20

5/8"

KG

7.60

8.00

94.24

0.20

1/2"

KG

7.60

4.00

30.10

3/8"

KG

2.20

104.00

128.13

3/4"

KG

7.60

6.00

102.14

3/8"

KG

2.20

104.00

128.13

0.20

3/4"

KG

7.60

4.00

68.10

0.20

5/8"

KG

7.60

8.00

94.24

3/8"

KG

2.74

42.00

64.44

2.24

0.30

0.56

Ejes 1 y 12 (Seccin 14-14)


7.20
0.20

2.24

7.20
0.20

0.20

1.55

0.99

7.20
0.30

0.80

0.56

Ejes 4 (Seccin 2-2)


7.20
0.20

0.20

2.24

0.30

0.80

0.56

Ejes (7y8) (9,10) (Seccin 4-4)


7.20
0.20

2.24

7.20
0.20

1.55

0.57

0.80

0.56

HOJA DE METRADO
PROYECTO : AMPLIACION DE INFRAESTRUCTURA Y SUSTITUCION DE INFRAESTRUCTURA Y

EQUIPAMIENTO DE LA I.E. 32223 MARIANO DAMASO BERAUN, DISTRITO DE AMARILIS


HUANUCO - HUANUCO

OBRA

: CONSTRUCCION DE UN MODULO DE SEIS AULAS + LABORATORIO Y SALA DE COMPUTO +

FECHA

: DICIEMBRE DEL 2009

SERVICIOS HIGINICOS Y BIBLIOTECA

HECHO POR :
UNIDAD

KG/ML

1/4"

.25

3/8"
1/2"
5/8"
3/4"

.56
.99
1.55
2.24

SUB
TOTAL
KG.

TOTAL

NEALSO

MEDIDAS

DESCRIPCION

ACERO

ACERO KG/ML

LARGO

3/8

5/8

3/4

N
DE
VECES

Eje B' (seccin 5-5)


4.19
0.20

0.20

5/8"

KG

4.59

2.47

3/4"

KG

2.47

2.24

3/4"

KG

5.45

3/4"

0.80

3/8"

1.55

2.00

14.23

2.24

1.00

5.53

2.24

2.24

4.00

20.07

KG

5.45

2.24

2.00

24.42

KG

2.20

31.00

38.19

0.30

0.56

HOJA
PROYECTO

FECHA

ESPECIALIDAD

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

OBRA

DE

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

INFRAESTRUCTURA

DESCRIPCION
UND

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

SUB TOTAL

DE
LARGO ANCHO ALTO

04.03.02

0,25

3/8"

HOJA N
MEDIDAS

04.03.01

KG/ML

1/4"

HECHO POR:

04.03

ACERO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

COLUMNAS
CONCRETO EN COLUMNETAS F'C=175 KG/CM2

#N/A

Eje A primer piso

M3

0.25

0.13

2.34

16.00

#N/A

Eje A segundo piso

M3

0.25

0.13

1.99

16.00

#N/A

Eje A tercer piso

M3

0.25

0.13

1.99

12.00

#N/A

Eje C primer piso

M3

0.25

0.13

1.44

16.00

#N/A

Eje C segundo piso

M3

0.25

0.13

1.09

16.00

#N/A

Eje C tercer piso

M3

0.25

0.13

1.09

12.00

#N/A

Parapeto 2do. Piso lado posterior de escalera

M3

0.25

0.13

1.05

2.00

#N/A

Parapeto 3er. Piso lado posterior de escalera

M3

0.25

0.13

1.05

2.00

#N/A

Parapeto 2do. Y tercer piso lado lateral

M3

0.25

0.13

1.05

2.00

0.07

CONCRETO EN COLUMNAS F'C=210 KG/CM2

#N/A

SALA DE COMPUTO Y LABORATORIO


C-1 (area medido en autocad) hasta 3er. piso

M3

11.05

10.00

0.20

#N/A

C-2 (area medido en autocad)

M3

11.05

4.00

0.17

#N/A

C-3 (area medido en autocad) en ejes 1 y 7

M3

12.74

2.00

0.06

#N/A

C-3 (area medido en autocad) en eje 4

M3

4.80

1.00

0.06

0.29

C-3 (area medido en autocad) en ejes 3 y 5

M3

8.15

2.00

0.06

#N/A

C-1 (area medido en autocad)

M3

7.80

2.00

0.20

#N/A

C-2 (area medido en autocad)

M3

7.80

4.00

0.17

#N/A

C-3 (area medido en autocad) en ejes 10 y 12

M3

9.49

2.00

0.06

#N/A

C-4 (area medido en autocad) en eje 11

M3

3.60

1.00

0.03

#N/A

CE-1 (area medido en autocad) en ejes 8 y 9

M3

10.84

2.00

0.09

#N/A

CE-2 (area medido en autocad) en ejes 8 y 9

M3

9.22

2.00

0.08

#N/A

CE-3 (area medido en autocad) en ejes 8 y 9

M3

10.34

2.00

0.06

#N/A

CE-4 (area medido en autocad) en ejes 8 y 9

M3

1.59

2.00

0.03

#N/A

CE-4 (area medido en autocad) en eje B'

M3

2.09

2.00

0.03

0.13

CE-4 (area medido en autocad) en eje A

M3

4.24

2.00

0.03

0.25

SS.HH

ESCALERA

04.03.03

ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS

#N/A

COLUMNETAS
Eje A primer piso

M2

0.50

2.34

16.00

18.72

Eje A segundo piso

M2

0.50

1.99

16.00

#N/A

Eje A tercer piso

M2

0.50

1.99

12.00

#N/A

Eje C primer piso

M2

0.50

1.44

16.00

#N/A

Eje C segundo piso

M2

0.50

1.09

16.00

#N/A

Eje C tercer piso

M2

0.50

1.09

12.00

#N/A

Parapeto 2do. Piso

M2

0.50

1.05

26.00

#N/A

Parapeto 3er. Piso

M2

0.50

1.05

20.00

#N/A

HOJA
PROYECTO

FECHA

ESPECIALIDAD

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

OBRA

DE

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

ACERO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

LARGO ANCHO ALTO


Columnetas para bajada de desague pluvial

SUB TOTAL

DE
VECES

TOTAL
LONG.

AREA

M2

0.65

1.70

6.00

#N/A

C-1 (area medido en autocad) hasta 3er. piso

M2

2.10

11.05

10.00

232.05

C-2 (area medido en autocad)

M2

1.57

11.05

4.00

69.39

C-3 (area medido en autocad) en ejes 1 y 7

M2

0.50

12.74

2.00

12.74

C-3 (area medido en autocad) en eje 4

M2

0.50

4.80

1.00

2.40

C-3 (area medido en autocad) en ejes 3 y 5

M2

0.50

8.15

2.00

8.15

C-1 (area medido en autocad)

M2

2.10

7.80

2.00

32.76

C-2 (area medido en autocad)

M2

1.57

7.80

4.00

48.98

C-3 (area medido en autocad) en ejes 10 y 12

M2

0.50

9.49

2.00

9.49

C-4 (area medido en autocad) en eje 11

M2

0.50

3.60

1.00

1.80

CE-1 (area medido en autocad) en ejes 8 y 9

M2

0.63

10.84

2.00

#N/A

CE-2 (area medido en autocad) en ejes 8 y 9

M2

0.53

9.22

2.00

#N/A

CE-3 (area medido en autocad) en ejes 8 y 9

M2

0.25

10.34

2.00

#N/A

CE-4 (area medido en autocad) en ejes 8 y 9

M2

0.26

1.59

2.00

#N/A

CE-4 (area medido en autocad) en eje B'

M2

0.50

2.09

2.00

#N/A

CE-4 (area medido en autocad) en eje A

M2

0.50

4.24

2.00

#N/A

VOL.

KG.

SALA DE COMPUTO Y LABORATORIO

SS.HH

ESCALERA

04.03.04

ACERO EN COLUMNAS F'Y=4,200 KG/CM2 GRADO 60

7160.10

MODULO DE AULAS
C-1 3/4

KG

8.00

12.45

10.00

2231.04

1 5/8

KG

4.00

12.45

10.00

771.90

ESTRIBOS 3/8

KG

20.00

0.38

10.00

42.56

KG

20.00

1.66

10.00

185.92

C-2 3/4

KG

4.00

12.45

4.00

446.21

5/8

KG

6.00

12.45

4.00

463.14

KG

20.00

0.38

4.00

17.02

KG

20.00

1.36

4.00

60.93

KG

4.00

14.14

2.00

111.99

KG

20.00

1.04

2.00

23.30

KG

4.00

8.65

2.00

68.51

KG

16.00

1.04

2.00

18.64

KG

4.00

5.60

1.00

22.18

KG

9.00

1.04

1.00

5.24

C-1 EN Z-1 3/4

KG

8.00

8.60

2.00

308.22

EN Z-1 5/8

KG

4.00

8.60

2.00

106.64

ESTRIBOS 3/8

KG

20.00

0.38

2.00

8.51

KG

20.00

1.66

2.00

37.18

ESTRIBOS 3/8

C-3 1/2
ESTRIBOS 3/8
C-3 1/2
ESTRIBOS 3/8
C-3 1/2
ESTRIBOS 3/8
SS.HH.

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

ACERO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

C-2 3/4

KG

4.00

8.60

4.00

308.22

5/8

KG

6.00

8.60

4.00

319.92

HOJA
PROYECTO

FECHA

ESPECIALIDAD

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

OBRA

DE

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

ACERO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

LARGO ANCHO ALTO


ESTRIBOS 3/8

SUB TOTAL

DE
KG.

20.00

1.36

4.00

60.93

4.00

10.89

2.00

86.25

KG

20.00

1.04

2.00

23.30

KG

4.00

4.65

1.00

10.42

KG

20.00

0.76

1.00

8.51

CE-1 5/8

KG

4.00

12.24

2.00

151.78

CE-1 1/2

KG

2.00

12.24

2.00

48.47

KG

70.00

1.70

2.00

133.28

KG

4.00

10.62

2.00

131.69

KG

60.00

1.02

2.00

68.54

KG

5.65

11.74

2.00

205.63

KG

70.00

0.92

2.00

72.13

KG

4.00

2.14

2.00

9.59

KG

9.00

0.76

2.00

3.42

KG

4.00

2.64

2.00

11.83

KG

11.00

0.76

2.00

4.18

KG

4.00

5.04

2.00

22.58

KG

30.00

0.76

2.00

11.40

3/8 POSTERIOR

KG

4.00

2.49

16.00

89.24

3/8 FRONTAL

KG

4.00

3.40

16.00

121.86

ESTRIBO POSTERIOR

KG

11.00

0.76

16.00

33.44

ESTRIBO FRONTAL

KG

16.00

0.76

16.00

48.64

ESTRIBOS 3/8

KG

VOL.

17.02

C-4 3/8

KG

AREA

4.00

ESTRIBOS 3/8

20.00

TOTAL
LONG.

0.38

C-3 1/2

KG

VECES

ESCALERA

ESTRIBOS 3/8

CE-2 5/8
ESTRIBOS 3/8

CE-3 EN VC 1/2
ESTRIBOS 3/8

CE-4 EN CC 3/8
ESTRIBOS 1/4

CE-4 EN CC 3/8
ESTRIBOS 1/4

CE-4 EN CC 3/8
ESTRIBOS 1/4

COLUMNAS DE CONFINAMIENTO
EN AULAS
1er. Piso

2do. Y 3er. Piso

aqu me quede

3/8 POSTERIOR

KG

4.00

1.49

14.00

46.73

3/8 FRONTAL

KG

4.00

2.39

14.00

74.95

ESTRIBO POSTERIOR

KG

7.00

0.76

14.00

18.62

ESTRIBO FRONTAL

KG

10.00

0.76

14.00

26.60

3/8

KG

4.00

1.25

12.00

33.60

ESTIRBO

KG

6.00

0.70

12.00

28.22

EN PARAPETO

HOJA
PROYECTO

FECHA

ESPECIALIDAD

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

OBRA

DE

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

INFRAESTRUCTURA

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HOJA N
MEDIDAS

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

04.04.01

KG/ML

1/4"

HECHO POR:

04.04

ACERO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

VIGAS
CONCRETO EN VIGUETAS F'C=175 KG/CM2

1.79

Primer piso
Eje A

M3

2.39

0.13

0.10

6.00

0.19

M3

3.46

0.13

0.10

2.00

0.09

Eje C

M3

3.46

0.13

0.10

8.00

0.36

En deposito

M3

3.76

0.13

0.10

1.00

M3

2.39

0.13

0.10

4.00

0.12

M3

3.46

0.13

0.10

4.00

0.18

M3

3.46

0.13

0.10

8.00

0.36

M3

2.39

0.13

0.10

3.00

0.09

M3

3.46

0.13

0.10

3.00

0.13

M3

3.46

0.13

0.10

6.00

0.27

Segundo piso
Eje A

Eje C
Tercer piso
Eje A

Eje C

04.04.02

CONCRETO EN VIGAS F'C=210 KG/CM2

#N/A

Primer Piso
V-I y V-7 (.23 x .35)

M3

6.15

0.23

0.35

2.00

0.99

V-2 y V-6 (.35 x .55)

M3

6.40

0.35

0.55

2.00

#N/A

V-3 y V5 (.35 x .60)

M3

6.40

0.35

0.60

2.00

#N/A

V-4 (.23 x .35)

M3

6.15

0.23

0.35

1.00

#N/A

V-10 y V-12 (.23 x .35)

M3

6.15

0.23

0.35

2.00

#N/A

V-11 (.35 x .55)

M3

6.40

0.35

0.55

1.00

#N/A

V-A y V-C (.20 x .55) del eje 1 al 7

M3

21.39

0.20

0.55

2.00

#N/A

V-A y V-C (.20 x .55) del eje 10 al 12

M3

7.19

0.20

0.55

2.00

V-1A en volado (Area = 0.71 m2.)

M3

0.35

V-V (.13 x .40) del eje 1 al 7

M3

23.19

0.13

0.40

1.00

1.21

V-V (.13 x .40) del eje 10 al 12

M3

7.79

0.13

0.40

1.00

0.41

V-I y V-7 (.23 x .35)

M3

6.15

0.23

0.35

2.00

#N/A

V-2 y V-6 (.35 x .55)

M3

6.40

0.35

0.55

2.00

#N/A

V-3 y V5 (.35 x .60)

M3

6.40

0.35

0.60

2.00

#N/A

V-4 (.35 x .55)

M3

6.15

0.35

0.55

1.00

#N/A

Ejes 10 y 12 (.23 x .30)

M3

6.15

0.23

0.30

2.00

#N/A

V-A y V-C (.20 x .55)

M3

21.39

0.20

0.55

2.00

#N/A

Ejes A y C (.20 x .30) en biblioteca

M3

7.19

0.20

0.30

2.00

V-1A en volado (Area = 0.71 m2.)

M3

0.35

V-V (.13 x .40) del eje 1 al 7

M3

23.19

0.13

0.40

1.00

1.21

Viga Inclinada en ejes 10 y 12

M3

6.99

0.23

0.25

2.00

0.80

10.00

1.58
0.71

2.49

Segundo Piso

9.00

#N/A
0.71

2.24

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

ACERO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

Volado frontal de viga inclinada ejes 10 y 12(area medido en aut

M3

0.23

2.00

1.00

0.46

Volado posterior de viga inclinada ejes 10 y 12(area medido en a

M3

0.23

2.00

0.86

0.40

Tercer Piso

KG.

HOJA
PROYECTO

FECHA

ESPECIALIDAD

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

OBRA

DE

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

ACERO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

Ejes I y 7 (.23 x .30)

M3

6.15

0.23

0.30

2.00

0.85

Ejes A y C (.20 x .30) en aulas

M3

21.39

0.20

0.30

2.00

2.57

Viga Inclinada en ejes 1 y 7

M3

6.99

0.23

0.25

2.00

Volado frontal de viga inclinada ejes 1 y 7(area medido en autoca

M3

0.23

2.00

1.00

0.46

Volado posterior de viga inclinada ejes 1 y 7(area medido en aut

M3

0.23

2.00

0.86

0.40

V-1 (.23 x .20)

M3

4.03

V-2 (.23 x variable) en volado Area = 0.71 m2.

M3

1.50

V-3 (.20 x .55)

M3

3.79

0.20

0.55

4.00

1.67

V-5 (.13 x .40)

M3

3.77

0.13

0.40

2.00

0.39

V-6 (.13 x .10)

M3

2.50

0.13

0.10

1.00

0.03

2V-1 (.23 x .20)

M3

4.85

0.23

0.20

2.00

Viga en volado frontal A = 1.04 m2.

M3

0.23

2.00

1.04

0.48

Viga en volado posterior A = 0.36 m2.

M3

0.23

2.00

0.36

0.17

KG.

0.80

Escalera

04.04.03

0.23

0.20

4.00
4.00

0.74
0.71

0.45

ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS

#N/A

Vigas de confinamiento
Primer piso
Eje A

M2

2.39

0.20

6.00

2.87

M2

3.46

0.20

2.00

#N/A

Eje C

M2

3.46

0.20

8.00

#N/A

En deposito

M2

3.76

0.20

1.00

#N/A

M2

2.39

0.20

4.00

#N/A

M2

3.46

0.20

4.00

#N/A

M2

3.46

0.20

8.00

#N/A

M2

2.39

0.20

3.00

#N/A

M2

3.46

0.20

3.00

#N/A

M2

3.46

0.20

6.00

#N/A

V-I y V-7 (.23 x .35)

M3

6.15

0.30

2.00

#N/A

V-2 y V-6 (.35 x .55)

M3

6.40

0.65

2.00

#N/A

V-3 y V5 (.35 x .60)

M3

6.40

0.70

2.00

#N/A

V-4 (.23 x .35)

M3

6.15

0.30

1.00

#N/A

V-10 y V-12 (.23 x .35)

M3

6.15

0.30

2.00

#N/A

V-11 (.35 x .55)

M3

6.40

0.92

1.00

#N/A

V-A y V-C (.20 x .55) del eje 1 al 7

M3

21.39

0.77

2.00

#N/A

V-A y V-C (.20 x .55) del eje 10 al 12

M3

7.19

0.77

2.00

#N/A

Segundo piso
Eje A

Eje C
Tercer piso
Eje A

Eje C

4.26

Vigas Estructurales
Primer Piso

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

ACERO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

LARGO ANCHO ALTO


V-1A en volado (Area = 0.71 m2.)

M3

SUB TOTAL

DE

0.71

VECES
20.00

TOTAL
LONG.

AREA
14.20

VOL.

KG.

HOJA
PROYECTO

FECHA

ESPECIALIDAD

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

OBRA

DE

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

ACERO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

M2

0.35

1.50

10.00

#N/A

V-V (.13 x .40) del eje 1 al 7

M3

23.19

0.53

1.00

#N/A

V-V (.13 x .40) del eje 10 al 12

M3

7.79

0.53

1.00

#N/A

V-I y V-7 (.23 x .35)

M3

6.15

0.30

2.00

#N/A

V-2 y V-6 (.35 x .55)

M3

6.40

1.05

2.00

#N/A

V-3 y V5 (.35 x .60)

M3

6.40

0.92

2.00

#N/A

V-4 (.35 x .55)

M3

6.15

1.05

1.00

#N/A

Ejes 10 y 12 (.23 x .30)

M3

6.15

0.60

2.00

#N/A

V-A y V-C (.20 x .55)

M3

21.39

0.77

2.00

#N/A

Ejes A y C (.20 x .30) en biblioteca

M3

7.19

0.77

2.00

#N/A

V-1A en volado (Area = 0.71 m2.)

M3

0.71

18.00

12.78

M2

1.50

0.35

9.00

#N/A

V-V (.13 x .40) del eje 1 al 7

M3

23.19

0.53

1.00

#N/A

Viga Inclinada en ejes 10 y 12

M3

6.99

0.50

2.00

#N/A

Volado frontal de viga inclinada ejes 10 y 12(area medido en aut

M3

1.00

4.00

4.00

M2

1.60

2.00

#N/A

M3

0.86

M2

1.40

Ejes I y 7 (.23 x .30)

M3

Ejes A y C (.20 x .30) en aulas


Viga Inclinada en ejes 1 y 7
Volado frontal de viga inclinada ejes 1 y 7(area medido en autoca

Segundo Piso

Volado posterior de viga inclinada ejes 10 y 12(area medido en a

VOL.

KG.

#N/A

0.23

4.00

3.44

0.23

2.00

#N/A

6.15

0.60

2.00

#N/A

M3

21.39

0.67

2.00

#N/A

M3

6.99

0.50

2.00

#N/A

M3

1.00

4.00

4.00

M2

1.60

2.00

0.74

M3

0.86

4.00

3.44

M2

1.40

Tercer Piso

Volado posterior de viga inclinada ejes 1 y 7(area medido en aut

0.23

0.23

2.00

Escalera
V-1 (.23 x .20)

M3

4.03

V-2 (.23 x variable) en volado Area = 0.71 m2.

M3

0.71

0.40

4.00

#N/A

8.00

5.68

M2

1.50

0.23

4.00

1.38

V-3 (.20 x .55)

M3

3.79

0.90

4.00

#N/A

V-5 (.13 x .40)

M3

3.77

0.73

2.00

#N/A

V-6 (.13 x .10)

M3

2.50

0.20

1.00

#N/A

2V-1 (.23 x .20)

M3

4.85

0.40

4.00

#N/A

Viga en volado frontal A = 1.04 m2.

M3

1.04

M2

0.23

M3

0.36

M2

0.23

Viga en volado posterior A = 0.36 m2.

04.04.04

0.64
#N/A

ACERO EN VIGAS F'Y=4,200 KG/CM2 GRADO 60


Primer piso

1.60

0.70

4.00

4.16

2.00

#N/A

4.00

1.44

2.00

#N/A

5272.41

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

ACERO

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

V-I y V-7 (.23 x .35)


8.7
0.2

0.2

2 1/2"

KG

9.10

0.99

4.00

36.04

3 1/2"

KG

3.10

0.99

6.00

18.41

2 1/2"

KG

2.32

0.99

4.00

9.19

2 1/2"

KG

7.60

0.99

4.00

30.10

3/8"

KG

1.16

0.56

84.00

54.57

3/8"

KG

1.24

0.56

30.00

20.83

0.2

2 5/8"

KG

9.10

1.55

4.00

56.42

0.2

1 3/4"

KG

2.95

2.24

2.00

13.22

2 3/4"

KG

4.25

2.24

4.00

38.08

2 1/2"

KG

2.32

0.99

4.00

9.19

1 5/8"

KG

4.50

1.55

2.00

2 3/4"

KG

7.60

2.24

4.00

2.9
0.2

0.2
0.2

1.92

0.2

0.2
7.2

0.23

0.35

Estrivos de madidas variable promedio de 15 estribos= .39


0.23

0.39

V-2 y V-6 (.35 x .55)


8.7
0.2

2.55
0.2

4.05
0.2

0.2
0.2

KG/ML

1/4"

1.92

4.5

0.2

0.2
7.2

68.10

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

ACERO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

0.23

0.35

3/8"

KG

1.16

0.56

96.00

62.36

3/8"

KG

1.24

0.56

30.00

20.83

0.2

2 3/4"

KG

9.10

2.24

4.00

81.54

0.2

1 5/8"

KG

2.95

1.55

2.00

9.15

2 3/4"

KG

4.25

2.24

4.00

38.08

2 1/2"

KG

2.32

0.99

4.00

9.19

2 5/8"

KG

4.50

1.55

4.00

2 3/4"

KG

7.60

2.24

4.00

68.10

3/8"

KG

1.16

0.56

96.00

62.36

KG

1.24

0.56

30.00

20.83

Estrivos de madidas variable promedio de 15 estribos= .39


0.23

0.39

V-3 y V5 (.35 x .60)


8.7
0.2

2.55
0.2

4.05
0.2

0.2
0.2

1.92

4.5

0.2

0.2
7.2

0.23

0.35

Estrivos de madidas variable promedio de 15 estribos= .39


0.23

0.39

3/8"

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

ACERO

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

V-4 (.23 x .35)


8.7
0.2

0.2

2 5/8"

KG

9.10

1.55

2.00

28.21

0.2

1 3/4"

KG

2.95

2.24

1.00

6.61

2 3/4"

KG

4.25

2.24

2.00

19.04

2 1/2"

KG

2.32

0.99

2.00

4.59

1 5/8"

KG

4.50

1.55

1.00

2 3/4"

KG

7.60

2.24

2.00

34.05

3/8"

KG

1.16

0.56

48.00

31.18

3/8"

KG

1.24

0.56

15.00

10.42

2 1/2"

KG

9.10

0.99

4.00

36.04

3 1/2"

KG

3.10

0.99

6.00

18.41

2 1/2"

KG

2.32

0.99

4.00

9.19

2 1/2"

KG

7.60

0.99

4.00

30.10

2.55
0.2

4.05
0.2

0.2
0.2

1.92

4.5

0.2

0.2
7.2

0.23

0.35

Estrivos de madidas variable promedio de 15 estribos= .39


0.23

0.39

V-10 y V-12 (.23 x .35)


8.7
0.2

0.2
2.9
0.2

0.2
0.2

KG/ML

1/4"

1.92

0.2

0.2
7.2

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

ACERO

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

ACERO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

0.23

0.35

3/8"

KG

1.16

0.56

84.00

54.57

3/8"

KG

1.24

0.56

30.00

20.83

0.2

2 5/8"

KG

9.10

1.55

2.00

28.21

0.2

1 3/4"

KG

2.95

2.24

1.00

6.61

2 3/4"

KG

4.25

2.24

2.00

19.04

2 1/2"

KG

2.32

0.99

2.00

4.59

1 5/8"

KG

4.50

1.55

1.00

6.98

2 3/4"

KG

7.60

2.24

2.00

34.05

3/8"

KG

1.16

0.56

48.00

31.18

KG

1.24

0.56

15.00

10.42

Estrivos de madidas variable promedio de 15 estribos= .39


0.23

0.39

V-11 (.35 x .55)


8.7
0.2

2.55
0.2

4.05
0.2

0.2
0.2

1.92

4.5

0.2

0.2
7.2

0.23

0.35

Estrivos de madidas variable promedio de 15 estribos= .39


0.23

0.39

3/8"

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

ACERO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

V-A y V-C (.20 x .55) del eje 1 al 7

25.64
0.2

0.2

2 5/8"

KG

26.04

1.55

4.00

161.45

0.2

0.2

2 5/8"

KG

26.04

1.55

4.00

161.45

2 5/8"+1 1/2"

KG

1.60

1.55

4.00

9.92

KG

1.60

0.99

2.00

3.17

KG

2.45

1.55

4.00

15.19

KG

2.45

0.99

2.00

4.85

KG

1.60

1.55

4.00

9.92

KG

1.60

0.99

2.00

3.17

3/8"

KG

1.50

0.56

336.00

282.24

0.2

2 5/8"

KG

9.34

1.55

4.00

57.91

0.2

2 5/8"

KG

9.34

1.55

4.00

57.91

2 5/8"+1 1/2"

KG

1.60

1.55

4.00

9.92

KG

1.60

0.99

2.00

3.17

KG

2.45

1.55

2.00

7.60

KG

2.45

0.99

2.00

4.85

KG

1.60

1.55

4.00

9.92

KG

1.60

0.99

2.00

3.17

KG

1.50

0.56

112.00

94.08

25.64

1.4
0.2

2.45

2 5/8"+1 1/2"

1.4
0.2

2 5/8"+1 1/2"

0.2

0.55

V-A y V-C (.20 x .55) del eje 10 al 12

8.94
0.2

0.2
8.94

1.4
0.2

2.45

2 5/8"+1 1/2"

1.4
0.2

2 5/8"+1 1/2"

0.2

0.55

3/8"

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

ACERO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

V-V (.13 x .40) del eje 1 al 7

25.64
0.2

0.2

1 1/2"

KG

26.04

0.99

1.00

25.78

0.2

0.2

1 1/2"

KG

26.04

0.99

1.00

25.78

1/4"

KG

1.06

0.25

168.00

44.52

0.2

1 1/2"

KG

9.34

0.99

1.00

9.25

0.2

1 1/2"

KG

9.34

0.99

1.00

9.25

1/4"

KG

1.06

0.25

56.00

14.84

2 1/2"

KG

9.10

0.99

4.00

36.04

3 1/2"

KG

3.10

0.99

6.00

18.41

2 1/2"

KG

2.32

0.99

4.00

9.19

2 1/2"

KG

7.60

0.99

4.00

30.10

3/8"

KG

1.16

0.56

84.00

54.57

25.64
0.13

0.4

V-V (.13 x .40) del eje 10 al 12

8.94
0.2

0.2
8.94
0.13

0.4

Segundo Piso
V-I y V-7 (.23 x .35)
8.7
0.2

0.2
2.9
0.2

0.2
0.2

1.92

0.2

0.2
7.2

0.23

0.35

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

ACERO

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

ACERO

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

Estribos de madidas variable promedio de 15 estribos= .39


0.23

0.39

3/8"

KG

1.24

0.56

30.00

20.83

0.2

2 5/8"

KG

9.10

1.55

4.00

56.42

0.2

1 3/4"

KG

2.95

2.24

2.00

13.22

2 3/4"

KG

4.25

2.24

4.00

38.08

2 1/2"

KG

2.32

0.99

4.00

9.19

1 5/8"

KG

4.50

1.55

2.00

2 3/4"

KG

7.60

2.24

4.00

68.10

3/8"

KG

1.16

0.56

96.00

62.36

3/8"

KG

1.24

0.56

30.00

20.83

0.2

2 3/4"

KG

9.10

2.24

4.00

81.54

0.2

1 5/8"

KG

2.95

1.55

2.00

9.15

V-2 y V-6 (.35 x .55)


8.7
0.2

2.55
0.2

4.05
0.2

0.2
0.2

1.92

4.5

0.2

0.2
7.2

0.23

0.35

Estrivos de madidas variable promedio de 15 estribos= .39


0.23

0.39

V-3 y V5 (.35 x .60)


8.7
0.2

2.55
0.2

KG/ML

1/4"

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

ACERO

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

ACERO

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

4.05
0.2

2 3/4"

KG

4.25

2.24

4.00

38.08

2 1/2"

KG

2.32

0.99

4.00

9.19

2 5/8"

KG

4.50

1.55

4.00

2 3/4"

KG

7.60

2.24

4.00

68.10

3/8"

KG

1.16

0.56

96.00

62.36

3/8"

KG

1.24

0.56

30.00

20.83

0.2

2 5/8"

KG

9.10

1.55

2.00

28.21

0.2

1 3/4"

KG

2.95

2.24

1.00

6.61

2 3/4"

KG

4.25

2.24

2.00

19.04

2 1/2"

KG

2.32

0.99

2.00

4.59

1 5/8"

KG

4.50

1.55

1.00

2 3/4"

KG

7.60

2.24

2.00

0.2
0.2

1.92

4.5

0.2

0.2
7.2

0.23

0.35

Estrivos de madidas variable promedio de 15 estribos= .39


0.23

0.39

V-4 (.35 x .55)


8.7
0.2

2.55
0.2

4.05
0.2

0.2
0.2

KG/ML

1/4"

1.92

4.5

0.2

0.2
7.2

34.05

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

ACERO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

0.23

0.35

3/8"

KG

1.16

0.56

48.00

31.18

3/8"

KG

1.24

0.56

15.00

10.42

Estrivos de madidas variable promedio de 15 estribos= .39


0.23

0.39

Ejes 10 y 12 (.23 x .30)


7.2
0.2

0.2

2 1/2"

KG

7.60

0.99

4.00

30.10

0.2

0.2

2 1/2"

KG

7.60

0.99

4.00

30.10

3/8"

KG

1.06

0.56

84.00

49.86

0.2

2 5/8"

KG

26.04

1.55

4.00

161.45

0.2

2 5/8"

KG

26.04

1.55

4.00

161.45

2 5/8"+1 1/2"

KG

1.60

1.55

4.00

9.92

KG

1.60

0.99

2.00

3.17

KG

2.45

1.55

4.00

15.19

KG

2.45

0.99

2.00

4.85

KG

1.60

1.55

4.00

9.92

KG

1.60

0.99

2.00

3.17

KG

1.50

0.56

336.00

282.24

7.2

0.23

0.3

V-A y V-C (.20 x .55)


25.64
0.2

0.2
25.64

1.4
0.2

2.45

2 5/8"+1 1/2"

1.4
0.2

2 5/8"+1 1/2"

0.2

0.55

3/8"

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

ACERO

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

ACERO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

Ejes A y C (.20 x .30) en biblioteca


8.84
0.2

0.2

0.2

2 1/2"

KG

9.24

0.99

4.00

36.59

0.2

2 1/2"

KG

9.24

0.99

4.00

36.59

3/8"

KG

1.00

0.56

56.00

31.36

0.2

1 1/2"

KG

29.04

0.99

1.00

28.75

0.2

1 1/2"

KG

29.04

0.99

1.00

28.75

1/4"

KG

1.06

0.25

168.00

44.52

2 1/2"

KG

9.25

0.99

4.00

36.63

KG

9.62

0.99

4.00

38.10

8.84

0.2

0.3

V-V (.13 x .40) del eje 1 al 7


28.64
0.2

0.2
28.64
0.13

0.4

Viga Inclinada en ejes 10 y 12

5.3

0.1

1.15

0.3
0.6

1.8

1.15

5.42

0.3

2 1/2"

0.65

0.1
2.00

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

ACERO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

4.6

1.00

4.6

2 1/2"

KG

5.60

0.99

4.00

22.18

2 1/2"

KG

5.75

0.99

4.00

22.77

3/8"

KG

0.96

0.56

112.00

60.21

3/8"

KG

1.26

0.56

40.00

28.22

1.15

0.23

0.25

Estrivos de madidas variable promedio de 10 estribos= .40


0.23

0.4

Tercer Piso
Ejes I y 7 (.23 x .30)
7.2
0.2

0.2

2 1/2"

KG

7.60

0.99

4.00

30.10

0.2

0.2

2 1/2"

KG

7.60

0.99

4.00

30.10

3/8"

KG

1.06

0.56

84.00

49.86

0.2

2 1/2"

KG

26.04

0.99

4.00

103.12

0.2

2 1/2"

KG

26.04

0.99

4.00

103.12

7.2

0.23

0.3

Ejes A y C (.20 x .30) en aulas


25.64
0.2

0.2
25.64

0.2

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

ACERO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

LARGO ANCHO ALTO


0.3

3/8"

KG

SUB TOTAL

DE

1.00

0.56

VECES
168.00

TOTAL
LONG.

AREA

VOL.

KG.
94.08

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

ACERO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

Viga Inclinada en ejes 1 y 7

5.3

1.15

2 1/2"
0.1

KG

9.25

0.99

4.00

36.63

2 1/2"

KG

9.62

0.99

4.00

38.10

2 1/2"

KG

5.60

0.99

4.00

22.18

2 1/2"

KG

5.75

0.99

4.00

22.77

3/8"

KG

0.96

0.56

112.00

60.21

KG

1.26

0.56

40.00

28.22

0.3
0.6

1.8
5.42

1.15

0.3
0.65

0.1
2.00

4.6

1.00

4.6

1.15

0.23

0.25

Estrivos de madidas variable promedio de 10 estribos= .40


0.23

0.4

3/8"

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

ACERO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

Escalera
V-1 (.23 x .20)
9.53
0.2

0.2

2 1/2"

KG

9.93

0.99

4.00

39.32

0.2

0.2

2 1/2"

KG

5.43

0.99

4.00

21.50

1/4"

KG

0.86

0.25

56.00

12.04

2 5/8"

KG

2.55

1.55

4.00

15.81

2 5/8"

KG

1.80

1.55

4.00

11.16

3/8"

KG

1.42

0.56

20.00

15.90

0.2

2 5/8"

KG

4.65

1.55

4.00

28.83

0.2

2 3/4"

KG

4.65

2.24

4.00

41.66

1 3/4"

KG

1.78

2.24

2.00

7.97

1 3/4"

KG

2.59

2.24

2.00

11.60

1 3/4"

KG

1.78

2.24

2.00

7.97

5.03
0.23

0.2

V-2 (.23 x variable) en volado Area = 0.71 m2.

0.4

0.30

1.85

1.8

Estrivos de madidas variable promedio de 10 estribos= .48


0.23

0.48

V-3 (.20 x .55)


4.25
0.2

0.2
4.25

1.58
0.2

2.59

1.58
0.2

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

ACERO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

0.2

0.55

3/8"

KG

1.50

0.56

56.00

47.04

0.2

1 1/2"

KG

4.65

0.99

2.00

9.21

0.2

1 1/2"

KG

4.65

0.99

2.00

9.21

1/4"

KG

0.70

0.25

40.00

7.00

2 3/8"

KG

3.37

0.56

2.00

3.77

1/4"

KG

0.33

0.25

14.00

1.16

2 1/2"

KG

6.82

0.99

4.00

27.01

2 1/2"

KG

2.43

0.99

4.00

9.62

2 1/2"

KG

6.40

0.99

4.00

25.34

2 1/2"

KG

2.40

0.99

4.00

9.50

V-5 (.13 x .40)


4.25
0.2

0.2
4.25
0.13

Estribo en

V-6 (.13 x .10)


2.97
0.2

0.2

Estribo en

2V-1 (.23 x .20)


1.00
5.72
0.10

0.30
2.03
0.10

1.00
5.40

0.45
1.95

0.30

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

ACERO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

LARGO ANCHO ALTO


0.35
0.90

2 1/2"

KG

SUB TOTAL

DE

1.55

0.99

VECES
4.00

TOTAL
LONG.

AREA

VOL.

KG.
6.14

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

ACERO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

0.23

0.2

3/8"

KG

0.86

0.56

56.00

26.97

0.56

18.00

14.92

0.56

10.00

6.38

Estribos de madidas variable en alero frontal promedio de 9 estribos= .51


0.23

0.51

3/8"

KG

1.48

Estribos de madidas variableen alero posterior promedio de 5 estribos= .34


0.23

0.34

04.05
04.05.01

3/8"

KG

1.14

LOSA ALIGERADA H=0.20 M.


CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2

39.34

Primer Piso
En Viguetas
Viguetas entre 1-1 - 2-2 y 6-6 - 7-7

M3

4.00

0.10

0.15

40.00

2.40

Viguetas entre 2-2 al 6-6

M3

3.85

0.10

0.15

80.00

4.62

Viguetas en volado de escalera

M3

3.80

0.10

0.15

4.00

0.23

Pao A, entre 1-1 - 2-2 y 6-6 - 7-7

M3

4.00

6.55

0.05

2.00

2.62

Pao A, entre 2-2 al 6-6

M3

3.85

6.55

0.05

4.00

5.04

Pao en Volado 1-1 - 2-2 y 6-6 - 7-7

M3

4.00

1.37

0.05

2.00

0.55

Pao en volado, entre 2-2 al 6-6

M3

3.85

1.37

0.05

4.00

1.05

En Volado de Escalera

M3

3.80

1.37

0.05

1.00

0.26

Viguetas entre 1-1 - 2-2 y 6-6 - 7-7

M3

4.00

0.10

0.15

40.00

2.40

Viguetas entre 2-2 al 6-6

M3

3.85

0.10

0.15

80.00

4.62

Viguetas en volado de escalera

M3

3.80

0.10

0.15

4.00

0.23

Pao A, entre 1-1 - 2-2 y 6-6 - 7-7

M3

4.00

6.55

0.05

2.00

2.62

Pao A, entre 2-2 al 6-6

M3

3.85

6.55

0.05

4.00

5.04

Pao en Volado 1-1 - 2-2 y 6-6 - 7-7

M3

4.00

1.37

0.05

2.00

0.55

En Losa e= 0.05

Segundo Piso
En Viguetas

En Losa e= 0.05

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

ACERO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

Pao en volado, entre 2-2 al 6-6

M3

3.85

1.37

0.05

4.00

1.05

En Volado de Escalera

M3

3.80

1.37

0.05

1.00

0.26

KG.

HOJA
PROYECTO

FECHA

ESPECIALIDAD

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

OBRA

DE

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

ACERO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

SS-HH. - BIBLIOTECA
En Viguetas
Viguetas entre 10-10 y 12-12

M3

4.00

0.10

0.15

40.00

2.40

Viguetas en volado de escalera

M3

3.80

0.10

0.15

4.00

0.23

Pao A, entre 10-10 y 12-12

M3

4.00

6.55

0.05

2.00

2.62

Pao en Volado 10-10 y 12-12

M3

4.00

1.37

0.05

2.00

0.55

En Losa e= 0.05

04.05.02

ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS

493.47

Primer Piso
Pao A, entre 1-1 - 2-2 y 6-6 - 7-7

M2

4.00

6.60

2.00

52.80

Pao A, entre 2-2 al 6-6

M2

3.85

6.60

4.00

101.64

Pao en Volado 1-1 - 2-2 y 6-6 - 7-7

M2

4.00

1.37

2.00

10.96

Pao en volado, entre 2-2 al 6-6

M2

3.85

1.37

4.00

21.10

En Volado de Escalera

M2

3.80

1.37

1.00

5.21

En Aulas (Frontal y posterior)

M2

25.55

0.20

2.00

10.22

En Aulas, Eje C-C del 1-1 al 7-7

M2

2.40

0.20

1.00

0.48

En Aulas (Laterales)

M2

8.70

0.20

2.00

3.48

En escalera

M2

4.25

0.20

2.00

1.70

En escalera

M2

6.53

0.20

2.00

2.61

Pao A, entre 1-1 - 2-2 y 6-6 - 7-7

M2

4.00

6.60

2.00

52.80

Pao A, entre 2-2 al 6-6

M2

3.85

6.60

4.00

101.64

Pao en Volado 1-1 - 2-2 y 6-6 - 7-7

M2

4.00

1.37

2.00

10.96

Pao en volado, entre 2-2 al 6-6

M2

3.85

1.37

4.00

21.10

En Volado de Escalera

M2

3.80

1.37

1.00

5.21

En Aulas (Frontal y posterior)

M2

25.55

0.20

2.00

10.22

En Aulas, Eje C-C del 1-1 al 7-7

M2

2.40

0.20

1.00

0.48

En Aulas (Laterales)

M2

8.70

0.20

2.00

3.48

En escalera

M2

4.25

0.20

2.00

1.70

En escalera

M2

6.53

0.20

2.00

2.61

Pao A, entre 10-10 y 12-12

M2

4.00

6.60

2.00

52.80

Pao en Volado 10-10 y 12-12

M2

3.95

1.37

2.00

10.82

En Volado de Escalera

M2

3.27

1.37

1.00

4.48

M2

3.72

2.00

1.49

Frisos

191.71

Segundo Piso

Frisos

SS.HH. - BIBLIOTECA

Frisos
En Aulas (Frontal y posterior)

0.20

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

ACERO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

LARGO ANCHO ALTO


En Aulas (Laterales)

M2

SUB TOTAL

DE

8.70

0.20

VECES
2.00

TOTAL
LONG.

AREA
3.48

VOL.

KG.

HOJA
PROYECTO

FECHA

ESPECIALIDAD

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

OBRA

DE

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

04.05.03

ACERO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

ACERO EN LOSAS ALIGERADAS F'Y=4,200 KG/CM2 GRADO 60

2979.50

Primer Piso
1 corrido (positivo)

KG

27.00

20.00

0.99

1 bastn (negativo)

KG

1.36

40.00

0.99

534.60
53.66

1 5/8 bastn (negativo)

KG

2.95

100.00

1.55

457.25

Temperatura

KG

9.15

96.00

0.25

219.60

KG

4.15

4.00

0.99

16.43

1 3/8 bastn

KG

2.40

4.00

0.99

9.50

1 corrido (positivo)

KG

27.00

20.00

0.99

534.60

1 bastn (negativo)

KG

1.36

40.00

0.99

53.66

1 5/8 bastn (negativo)

KG

2.95

100.00

1.55

457.25

Temperatura

KG

9.15

96.00

0.25

219.60

KG

4.15

4.00

0.99

16.43

1 3/8 bastn

KG

2.40

4.00

0.99

9.50

1 1/2 corrido (positivo)

KG

8.76

20.00

0.99

173.37

1 5/8" bastn (negativo)

KG

2.95

25.00

1.55

114.31

1 3/8 bastn (negativo)

KG

1.10

15.00

0.56

9.24

1 3/8 bastn (negativo)

KG

1.95

25.00

0.56

27.30

Temperatura

KG

9.15

32.00

0.25

73.20

ESCALERA

Segundo Piso

ESCALERA

SS. HH. - BIBLIOTECA

04.05.04

LADRILLO HUECO DE ARCILLA DE 15x30x30 PARA LOSA ALIGERADO h=20 cm

3761.16

Primer Piso
Area de encofrado de losa x (8.33 Unid. X m2)

Und

8.33

191.71

1596.94

Und

8.33

191.71

1596.94

Und

8.33

68.10

567.27

1.83

1.00

1.47

2.68

1.83

2.00

1.17

4.28

1.00

1.24

2.26

Segundo Piso
Area de encofrado de losa x (8.33 Unid. X m2)
SS.HH. - BIBLIOTECA
Area de encofrado de losa x (8.33 Unid. X m2)

04.06
04.06.01

ESCALERA
CONCRETO EN ESCALERAS F'c= 210 KG/CM2

9.23

Primer Tramo (area medido en autocad)

M3

Segundo y Cuarto tramo

M3

Tercer Tramo

M3

1.83

HOJA
PROYECTO

FECHA

ESPECIALIDAD

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

OBRA

DE

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

04.06.02

ACERO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

ENCOFRADO Y DESENCOFRADO NORMAL EN ESCALERAS

54.23

Primer Tramo (area medido en autocad)


Fondo de escalera

M2

Contrapasos

M2

5.24

Lateral

M2

3.62

Fondo de escalera

M2

5.00

Contrapasos

M2

Lateral

M2

3.29

Fondo de escalera

M2

5.25

Contrapasos

M2

Lateral

M2

1.83
1.83

1.00

9.59

0.17

10.00

3.06

0.33

1.00

1.19

2.00

18.30

0.17

20.00

6.11

0.33

2.00

2.17

1.00

9.61

0.17

10.00

3.06

0.33

1.00

1.14

Segundo y cuarto tramo


1.83
1.83

Tercer Tramo

04.06.03

1.83
1.83

3.45

ACERO EN ESCALERAS F'Y=4,200 KG/CM2 GRADO 60

1141.46
KG/ML

Primer Tramo
2.06
5/8"@

0.15

KG

3.16

1.55

12.20

59.76

1/2"@

0.15

KG

2.50

0.99

12.20

30.20

5/8"@

0.15

KG

5.27

1.55

12.20

99.66

5/8"@

0.13

KG

2.37

1.55

14.08

51.71

1.21

5/8"@

0.13

KG

1.94

1.55

14.08

42.33

1.83

3/8"@

0.20

KG

1.83

0.56

19.95

20.44

1.1

2.2
0.3
0.3

3.99

1.22

0.98

1.15

0.73

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

ACERO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

4.25
0.20

0.20

3/8"@

0.30

KG

4.65

0.56

6.10

15.88

3/8"@

0.20

KG

4.25

0.56

9.15

21.78

5/8"@

0.15

KG

2.56

1.55

24.40

96.82

5/8"@

0.15

KG

1.40

1.55

24.40

52.95

5/8"@

0.15

KG

6.02

1.55

24.40

227.68

1.1

5/8"@

0.15

KG

1.67

1.55

24.40

63.16

1.83

3/8"@

0.20

KG

1.83

0.56

36.60

37.51

3/8"@

0.30

KG

4.65

0.56

6.10

15.88

3/8"@

0.20

KG

4.25

0.56

9.15

21.78

5/8"@

0.15

KG

3.16

1.55

12.20

59.76

1/2"@

0.15

KG

2.50

0.99

12.20

30.20

4.25

Segundo y cuarto tramo

2.26

0.3

1.1
0.3
0.3

3.66
2.06
0.57

4.25
0.20

0.20

4.25

Tercer Tramo
2.06
1.1

2.2
0.3

HOJA
PROYECTO

FECHA

ESPECIALIDAD

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

OBRA

DE

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

ACERO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

0.3

0.15

KG

5.55

1.55

12.20

104.95

5/8"@

0.13

KG

1.80

1.55

14.08

39.27

5/8"@

0.13

KG

1.40

1.55

14.08

30.55

3/8"@

0.20

KG

1.83

0.56

18.75

19.22

GARGOLA

M3

0.20

0.20

0.10

9.00

0.04

GARGOLA

M3

0.20

0.05

0.15

18.00

0.03

M2

0.70

0.20

M2

0.20

M2

0.15

M2

0.15

1/4

KG

1.29

0.25

18.00

5.81

1/4

KG

0.82

0.25

18.00

3.69

M3

2.28

0.40

0.10

2.00

0.18

M3

2.28

0.30

0.10

2.00

0.14

M2

2.02

0.40

2.00

1.62

M2

2.28

0.30

4.00

2.74

M2

0.40

0.30

2.00

0.24

M2

0.30

0.30

2.00

0.18

3.75

5/8"@

1.5

0.3

1.50

1.1

0.3

1.83

04.07
04.07.01

04.07.02

04.07.03

04.08
04.08.01

04.08.02

GARGOLAS
CONCRETO EN GARGOLAS F'C=175 KG/CM2

0.06

ENCOFRADO Y DESENCOFRADO NORMAL EN GARGOLAS

2.12

ACERO EN GARGOLAS F'Y=4,200 KG/CM2 GRADO 60

9.00

1.26

0.10

9.00

0.18

0.05

18.00

0.14

0.20

18.00

0.54

9.50

KG/ML

LAVADERO CORRIDO DE CONCRETO


CONCRETO EN LAVADERO CORRIDO F'C=175 KG/CM2

0.32

ENCOFRADO Y DESENCOFRADO EN LAVADERO

4.77

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

INFRAESTRUCTURA

DESCRIPCION
UND

04.09.02

04.09.03

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

SUB TOTAL

DE
LARGO ANCHO ALTO

04.09.01

0,25

3/8"

HOJA N
MEDIDAS

04.09

KG/ML

1/4"

HECHO POR:

04.08.03

ACERO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

ACERO EN LAVADERO DE CONCRETO F'C=4,200 KG/CM2 GRADO 60

30.69

5 3/8@0.15

KG

2.28

10.00

12.77

16 3/8@0.15

KG

1.00

32.00

17.92

PARAPETO
CONCRETO EN PARAPETO F'C=175 KG/CM2

19.14

2do. Piso en aulas (area medido en autocad)

M3

0.13

8.00

2.02

2do. Piso en eacalera (area medido en autocad)

M3

0.13

2.00

1.23

2.46

3er. Piso en aulas (area medido en autocad)

M3

0.13

6.00

2.02

12.12

3er. Piso en escalera (area medido en autocad)

M3

0.13

2.00

1.23

2.46

2.02

16.00

32.32

0.13

28.00

3.82

1.23

4.00

4.92

0.13

8.00

1.09

2.02

12.00

24.24

0.13

20.00

2.73

1.23

4.00

4.92

0.13

8.00

1.09

ENCOFRADO Y DESENCOFRADO NORMAL EN PARAPETO

2.10

75.14

AREA

2do. Piso en aulas (area medido en autocad)

M2

Encofrado en arco de parapeto

M2

2do. Piso en eacalera (area medido en autocad)

M2

Encofrado en arco de parapeto

M2

3er. Piso en aulas (area medido en autocad)

M2

Encofrado en arco de parapeto

M2

3er. Piso en escalera (area medido en autocad)

M2

Encofrado en arco de parapeto

M2

1.05

1.05

1.05

1.05

ACERO PARAPETO F'Y=4,200 KG/CM2 GRADO 60

270.18

2do. Piso en aulas (area medido en autocad)

4.34 3/8"

KG

4.34

0.56

8.00

19.44

0.35 1/4"

KG

0.35

0.25

76.00

6.65

8.30 3/8"

KG

8.30

0.56

4.00

18.59

0.35 1/4"

KG

0.35

0.25

70.00

6.13

2.09 3/8"

KG

2.09

0.56

4.00

4.68

0.35 1/4"

KG

0.35

0.25

18.00

1.58

2do. Piso en eacalera (area medido en autocad)

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

ACERO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

3er. Piso en aulas (area medido en autocad)

4.34 3/8"

KG

4.34

0.56

4.00

9.72

0.35 1/4"

KG

0.35

0.25

38.00

3.33

8.30 3/8"

KG

8.30

0.56

4.00

18.59

0.35 1/4"

KG

0.35

0.25

70.00

6.13

2.09 3/8"

KG

2.09

0.56

4.00

4.68

0.35 1/4"

KG

0.35

0.25

18.00

1.58

4 3/8"

KG

1.85

0.56

72.00

74.59

1/4"

KG

0.76

0.25

108.00

20.52

3er. Piso en escalera (area medido en autocad)

Acero en columnetas 2do. Piso

0.2

1.45

0.2

0.25

0.13

Acero en columnetas 3er. Piso

0.2

1.45

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

ACERO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

LARGO ANCHO ALTO


4 3/8"

KG

SUB TOTAL

DE

1.85

0.56

VECES
56.00

TOTAL
LONG.

AREA

VOL.

KG.
58.02

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

ACERO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

0.2

0.25

0.13

1/4"

KG

0.76

0.25

84.00

15.96

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

ACERO

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

ACERO

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

ACERO

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

ACERO

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

ACERO

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

ACERO

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

ACERO

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

KG.

HOJA
PROYECTO

OBRA

FECHA

ESPECIALIDAD

DE

METRADO

CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO


POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO
CREACIN DE UN MODULO DE NIVEL INICIAL EN LA INSTITUCION EDUCATIVA N33210 EN EL CENTRO
POBLADO DE SAN CRISTOBAL DE PUCUMARCA DEL DISTRITO DE CHINCHAO PROVINCIA DE
HUANUCO REGION HUANUCO

KG/ML

1/4"

0,25

3/8"

0.56

1/2"
5/8"
3/4"
1"

0.99
1.55
2.24
3.97

HECHO POR:
INFRAESTRUCTURA

HOJA N
MEDIDAS

ACERO

DESCRIPCION
UND

SUB TOTAL

DE
LARGO ANCHO ALTO

VECES

TOTAL
LONG.

AREA

VOL.

KG.