1. Structural inspection at Raw Water Intake System (Weir, Collector Well, and
Infiltration Gallery), 230KV switchyard Transmission Tower (Bored piling),
Comprehensive pipe rocks and Chimney
a) Weir and Infiltration Gallery
b) Collector Well
e) Chimney
Installation of hydraulic jack for chimney liner lifting at elevation
115m.
Erection of Chimney inner liner 1 and fitting up and welding of
connections