Vous êtes sur la page 1sur 3

1

2
3
4
5
6
7
8
9
10

N1

N2

N3

1
30
1
30
1
15
1
45
1
15
1
15
1
15
2
15
2
15
2
15

1
15
1
15
1
15
0
0
1
15
2
15
1
15
2
15
2
15
3
15

0
0
0
0
1
15
0
0
1
15
2
15
2
15
2
15
3
15
5
15

1
1
2
0
2
4
3
4
5
8

11

12

13

14

15

16
17
18
19
20
21
22
23
24
25

26
27

PT. INDOKOEI INTERNATIONAL

PROJECT
LOCATION
FEATURE
AREA DESIGNATION
GROUND ELEVATION
COORDINATES
DEPTH OF G.W.L

THICK
DEPTH NESS
(M)

(M)

: JAVA INTEGRATED INDUSTRIAL


: AND PORTS ESTATE (JIIPE)
: Manyar - Gresik, East Java
:
:
:
:
:

BOR LOG SPT- N


N2 + N3

1.00

1.50

2.00

COMMENCEMENT DATE
COMPLETION DATE
ANGLE
BEARING
DRILLER
SUPERVISOR
LOGGED

DESCRIPTION & LITHOLOGI

SPT - N

SPT

:
:
:
:
:
:
:

: BH.34
: 1 of 1
: 20.0 m

May 12, 2013


May 12, 2013
90o
Vertical
Tori
M. Jaenuri

DEPTH OF SPT

REMARK

NO.
0

0.00

BORING NO
SHEET
TOTAL DEPTH

BOR HOLE LOG

Engineering and Management Consultant

10

20

30

40

50

60

Clay, Brown

N1 = 1/30,

2.00 - 2.45 m
N2 = 1/15,

N1 = 1/30,

4.00 - 4.45 m
N2 = 1/15,

3.50-4.00 m

N1 = 1/15,

6.00 - 6.45 m
N2 = 1/15,
N3 = 1/15

5.50-6.00 m

3.00
4.00

UDS 1

5.00
6.00
7.00

2
9.50

8.00

UDS 2

Silty clay, Gray, Very soft to soft

<1

8.00 - 8.45 m
N1 = 1/45,

9.00
10.00

N1 = 1/15,

10.00 - 10.45 m
N2 = 1/15,
N3 = 1/15

N1 = 1/15,

12.00 - 12.45 m
N2 = 2/15,
N3 = 2/15

N1 = 1/15,

14.00 - 14.45 m
N2 = 1/15,
N3 = 2/15

N1 = 2/15,

16.00 - 16.45 m
N2 = 2/15,
N3 = 2/15

N1 = 2/15,

18.00 - 18.45 m
N2 = 2/15,
N3 = 3/15

N1 = 2/15,

20.00 - 20.45 m
N2 = 3/15,
N3 = 5/15

11.00
12.00

2.00

Sandy clay, Gray, Medium


4

13.00
14.00

2.00

Clay +cockle shells, Gray, Soft


3

15.00
16.00

2.50

Clay, Gray, Medium

17.00
18.00
19.00
20.00

5
2.50

Sandy clay, Yellowish gray, Medium to stiff

10

UDS 3
9.50-10.00 m

Vous aimerez peut-être aussi