A- PREDIMENSIONAMIENTO
B-DISEO DE VIGAS
U (mts)
Metrado de cargas
Ancho de via
long vereda
Ancho de viga
( A )=
(C)=
(b)=
(f)=
(E)=
(g)=
(m)=
(S)=
(a)=
espesor de losa
separcion vigas
Peso losa =
Peso viga =
asfalto
=
acera
=
volado
=
3.60
0.65
0.80
2.00
0.20
0.20
1.80
4.45
0.40
E*(A/2*+b+k)*2,4 T/M3
F*b*2,4 T/M3
0,05*A/2*2
0,55*0,4 T/M3
0,1*2,4 T/M3
Wd
1.644
3.84
0.18
0.22
0.261
6.145
Sobrecarga HS-20
NUMERO DE DIAFRAGMAS
Peso propio Diafragma (W1)=
Momento total Carga Muerta (Md)
(W
3
0,8*0,2*S/2*2,4
w1*(L/4+2*L/8)+
Wd*L2/8
por viga
Ms/c=P/2*(9*L2/4-10,5*L+4,41)/L
P=
3629
M S/C =M*(1+0,7/(s+b))
M S/C
por viga
M eq=9*L/4+0,96*L*L/8
4-CARGAS POR EJE TAMDEN
M =(L-1,2)*6/2
I=15,24/(L+38)
Momento de impacto
I < =0,3 , I=
0.3
(Mi)
0.27
M=Md+Ml+Mi
Fy
F^c=
Fc=0,4*F"c
fy=0,4*fy
r=fy/Fc
n=2100000/(15000*
k=n/(n+r)
J=1-k/3
H=
4200
210
84
1680
20
9.661
0.326
0.8914
129.33
Mu =1,3*(Md+1,67*(Ml+Mi)
Mu=
Area de acero
b=50
d=H-0,1
123.33
W=(0,845-RAIZ(0,7182-1,695*Mu*
W=
As=w*F"c/Fy*b*d
As=
diam=1"
Z=2300 Kg/cm2
A=2*b*10/N
FsMax=23000/(8,25*A^{1/3)
Fs=Mu /(As*j*d)
2042,90<3189,57
454.4692695809
B4-VERIFICACION POR CORTE
Vd=Wd*L/2+W1*(1+0,75+0,5+0,75)
POR SOBRECARGA HS 20
Vl=2,52(4*p*1+4*p*0,79+p*0,58)
POR IMPACTO
DISEO POR ROTURA
Vu =1,3(Vd+1,67*(Vl+Vi))
Esfuerzo cortante nominal
V"u=Vu/0,85*(b*d)
Esfuerzo cortante resis de concreto
Vc=0,85*(0,5(f"c)^1/2+175*r*Vu*d/Mu)
r=
0.021675
Vc>V"u
Av=2*0,71
S=Av*Fy/(Vu-Vc)*b
1.42
ACERO LATERAL
A=0,1*As
Diam=3/4"'# varillas:
B5-VERIFICACION POR FATIGA
Mu=
Fs max=M/(As*j*d)
Fmin=Mmin/(As*j*d)
Fs-Fmin=
Valor admisible (Fa)
1635,36-0,36*Fmin=
Fa>(Fs-Fmin)
375.03
C-DISEO DE LA LOSA
METRADO DE CARGAS
Peso propio
(1m)*(e)*(2,4 T/m3
Asfalto
(1m(*(0,05)*2T/m3)
Md=Wd*s/10
Ml=(s+0,61)/9,74*P
P=7,258
7.258
Momento positivo=0,8*Ml
Momento Negativo=0,9*Ml
Momento por Impacto
I=15,24/(S+38)
I=<0,3
0.3
Momento positivo=I*M+
Momento negativo=I*MVERIFICACION DEL PERALTE
d=raiz(2*M*/(Fc*j*k*100)
d<H,
considerando recubrimiento d=
DISEO POR ROTURA
M+=1,3*(Md+1,67*(M+I))
As=(0,845-raiz(0,7182-1,695*Mu*
100000/(0,9*F':c*b*d))*F"c*b*d/Fy:
verificando la cuantia minima
As min=14*b*d/Fy
As min<As
Considerando acero 5/8"
M-=1,3*(Md+1,67*(M+I))
As=(0,845-raiz(0,7182-1,695*Mu*
100000/(0,9*F':c*b*d))*F"c*b*d/Fy:
verificando la cuantia minima
As min=14*b*d/Fy
As min<As
Considerando acero 5/8"
carga
0.126
0.12
0.015
0.192
0.15
distancia
0.575
0.3
0.27
0.2
0.75
Md=
-0.15
-1.06
Momento impacto =
-0.319267
-2.66
-4.94
@
Usar fierro
5/8"@
A,G,E
g\datos\programa\hoj\alberto\puente,age
Tn
0.356
292.544725
60.56
TN-MT
65.18
TN-M
45.3475
TN-M
54.60
65.18
TN-M
0.27
17.30
375.03 TN-M
d=raiz(2*M*100000/(F"c*k*j*b))
d=
d<H
78.821331
1 OK+
b=L/4
b=16*E+0,5
b=0,5+s
b=min valor
4.85
3.7
4.95
3.7
559.38
0.5531263366
=(0,845-RAIZ(0,7182-1,695*Mu*100000/(0,9*F"c*b*d2))
0.2943736634
=w*F"c/Fy*b*d
145.22 cm 2
i
# varillas =
29
55.09
2991.53
2348.85
1
O,K
60.50
17.98
4.77
128.03
3.30
c ms
7.07
kg/cm 2
20
14.5224340605
2348.85
1832.25
516.60
1449.3838641753
1
0.48
0.1
0.58
1.15
3.77
Cm 2
u
3.02
3.39
0.36
8.61
1
14
cms
9.27
20.71
T-m
cm-2
4.74
cm 2
1
10
cms
10.33
23.87
T-m
cm-2
4.74
cm 2
1
8
cms
Momento
0.07
0.04
0.00
0.04
0.11
0.26
T-m
cm-2
-40
cms
-40
cms