CBOH and Community facilities

Consultant HSS
Cooling, Power, Water and Sewer demand

CBOH and Community facilities


Load Assumption for phase 1

Project
CBOH and Community facilities

Rev. 5 (31.03.2015)
Table of Content

1. Water & Drainage ................................................................................................ 2


1.1. Common Back of house ................................................................................................. 2
1.2. Community Buildings ...................................................................................................... 2

2. Power Load ......................................................................................................... 2


2.1. Common Back of house ................................................................................................. 3
2.2. Community Buildings ...................................................................................................... 3

3. Cooling Load ...................................................................................................... 4


3.1. Common Back of house ................................................................................................. 4
3.2. Community Buildings ...................................................................................................... 4

Document No.:
Date: 1 Feb 2015

P a g e |1

Consultant HSS

CBOH and Community facilities

Cooling, Power, Water and Sewer demand

1. Water & Drainage


1.1. Common Back of house
Building

Facility
Management

Unit

No.

Employee
Laundry
(Wash
machine)
Kitchen
(Meal)

Potable Water
L/per day
Total/Day

250

60

15000

60

15000

1500

7500

1500

7500

250

10

2500

10

2500

Data Center

Unit

No.

Employee

200

25,000

Rate

Notes

Rate

Total

Building

Sewerage
L/per day

Total

Total/Day

25,000

Potable Water
L/per day
Rate
Total/Day
60
12000

Sewerage
L/per day
Rate
Total/Day
60
12000

Total

Total

12,000

12,000

* As per design

Notes

* Assumption

1.2. Community Buildings

Building

Civil Defense

Building
Ambulance

Building

Police

Unit
Employee
Visitor

Unit
Employee

Unit
Staff
Worker
Detention

No.
100
75

No.
10

No.

30
10

Potable Water
L/per day

Sewerage
L/per day

Notes

Rate
60
40

Total/Day
6000
3000

Rate
60
40

Total/Day
6000
3000

Total

9,000

Total

9,000

* As per design

Potable Water
L/per day
Rate Total/Day
60
600

Sewerage
L/per day
Rate
Total/Day
60
600

Total

Total

600

Potable Water
L/per day
Rate Total/Day
60
250
Total

1800
2500
2,500

600

* As per design

Sewerage
L/per day
Rate
Total/Day
60
250
Total

Notes

Notes

1800
2500
2,500

* Assumption

Note: Loads as per DEWA & DM


Document No.:
Date: 1 Feb 2015

P a g e |2

Consultant HSS

CBOH and Community facilities

Cooling, Power, Water and Sewer demand

2. Power Load
2.1. Common Back of house
Power
Building

Usage

Unit

BUA

Notes
Total
(kw)

Rate
Facility
Management

Total
Connected

kw

5400

1065.4
Total

Building

Data
Center

Usage

Light
Small
Power
Bulk Load
Critical
Area
Server
Room

Unit

BUA
or No
of
units

1,065

* As per design

Power
Notes
Rate
(w/u)

Total
(kw)

w/m2

2860

20

57.2

w/m2
kw

2860

50

143
235 Fire pump, Lift, water heater . Etc

kw
w/Rack

50

To be provided by IT consultant
Not include other loads like chillers,
350 battery charger

7000
Total

785

* Assumption

2.2. Community Buildings


Power
Building

Usage

Unit

BUA

Notes
Total
(kw)

Rate
Civil Defense

Total
Connected

kw

3322

1201.45 Include Ambulance


Total

1,201

* As per design

Power
Building

Usage

Unit

BUA

Notes
Rate

Police

Light
Small
Power
Bulk Load

w/m2

285

20

w/m2
kw

285

50

Total
Document No.:
Date: 1 Feb 2015

Total
(kw)
5.7
14.25
20 Water heater, equipment. Etc
40

* Assumption
P a g e |3

Consultant HSS

CBOH and Community facilities

Cooling, Power, Water and Sewer demand

3. Cooling Load
3.1. Common Back of house
Building

Unit

BUA

Total Cooling Load


Rate

Facility
Management

kw refrigerant

Please provide
Hap File Notes

Total (kw)

5400

774 As per design


Total

774

220.1 RT

Please provide
Initial
calculations
Notes
and assumptions

Total Cooling Load


Building

Unit

BUA

Total
(kw)
1090 Initial Calculations
To be provided by IT
0 consultant

Rate
Data Center

Building kw refrigerant
Critical Area kw
refrigerant

2860
1040

0
Total

1,090

309.9 RT

3.2. Community Buildings


Total Cooling Load
Building

Unit

Total
(kw)
1231 As per design

Rate
Civil Defense

kw refrigerant

Please provide
Hap Notes
File

BUA

3322
Total

1,231

350 RT

Please provide
Hap
NotesFile

Total Cooling Load


Building

Unit

BUA

Total
(kw)
14 As per design

Rate
Ambulance

kw refrigerant

59
Total

14

4 RT

Please provide
Hap File

Total Cooling Load


Building

Unit

BUA
Rate

Police

kw refrigerant

285
Total

Document No.:
Date: 1 Feb 2015

Notes
Total
(kw)
80 Initial Calculations
80

22.7 RT

P a g e |4