N
UND. VECE
S
m2
m2
mL
mL
1
1
1
2
2
1
1
1
1
2
2
6
10
5
9
Ml
Glb
Glb
Glb
2
2
1
2
1
1
4
2
2
2
2
4
2
2
2
2
2
2
2
DIMENSIONAMIENTO
ANCH
LARGO
ALTO
O
PARCIAL
TOTAL
1360
34
34
20
20
680
680
171.602
34
20
0.25
170
1.602
34
19.4
34
34
0.015
0.015
20
20
1.02
0.582
680
680
205.9224
171.602
34
205.9224
20
680
4.272
34
19.4
0.04
0.04
2.72
1.552
60.6
34
20
0.15
0.15
30.6
30
350
34
170
180
20
404.4
178.3
72
154.1
178.30
72.00
154.10
5
2
2
1
61.698
2.33
2.1
9.786
3.3
6.45
6.234
2.1
3
3
13.86
19.35
18.702
76.98
1.4
1.4
1.25
1.4
1.25
1.25
1.1
0.65
0.5
5.22
1.8
1.8
1.8
1.8
1.8
1.8
1.8
1.8
1.2
3
10.08
5.04
4.5
5.04
4.5
9
3.96
2.34
1.2
31.32
63.246
2.33
3.3
6.6
2.1
2.1
3
9.786
13.86
39.6
0.25
4.5
4.5
m2/DIA
Cdigo
Descripcin Recurso
Mano de Obra
147010002 OPERARIO
147010004 PEON
Equipos
337010001 HERRAMIENTAS MANUALES
MO.
Unidad
80
Cuadrilla
hh
hh
Equipo: 80
Cantidad
0.1
1
%MO
Precio S/.
Parcial S/.
0.01
0.1
18.36
13.84
0.18
1.38
1.57
0.03
1.57
0.05
Partida
1.02 TRAZO, NIVELES Y REPLANTEO
Rendimiento
m2/DIA
Cdigo
Descripcin Recurso
Mano de Obra
147000032 TOPOGRAFO
147010001 CAPATAZ
147010004 PEON
Materiales
229060001 YESO DE 16 KG.
245010001 MADERA TORNILLO INCLUYE CORTE PARA
Equipos
337010001 HERRAMIENTAS MANUALES
348890001 EQUIPO DE TOPOGRAFIA
MO.
400
Unidad
Cuadrilla
hh
hh
hh
Cantidad
1
0.1
3
Equipo: 400
Precio S/.
Parcial S/.
0.02
0.002
0.06
18.36
18.58
13.84
0.37
0.04
0.83
1.23
kg
p2
0.05
0.02
5.29
5.66
0.26
0.11
0.38
%MO
he
0.03
0.02
1.23
12.61
0.03
0.25
0.28
Partida
2.01 CORTE MANUAL DE TERRENO A NIVEL DE SUBRASANTE
Rendimiento
m3/DIA
Cdigo
Descripcin Recurso
Mano de Obra
147010001 CAPATAZ
147010004 PEON
Equipos
337010001 HERRAMIENTAS MANUALES
MO. 5
Unidad
Cuadrilla
hh
hh
Equipo: 5
Cantidad
0.1
1
%MO
Precio S/.
Parcial S/.
0.16
1.6
18.58
13.84
2.97
22.14
25.12
0.03
25.12
0.75
0.75
Partida
2.02 EXCAVACION DE ZANJA PARA SARDINEL SUMERGIDO
Rendimiento
m3/DIA
Cdigo
Descripcin Recurso
Mano de Obra
147010001 CAPATAZ
147010004 PEON
Equipos
337010001 HERRAMIENTAS MANUALES
MO.
Unidad
hh
hh
%MO
3.5 EQ.
Cuadrilla
3.5 por : m3
Cantidad
0.1
1
Precio S/.
Parcial S/.
0.23
2.29
18.58
13.84
4.25
31.63
35.88
0.03
35.88
1.08
1.08
Partida
2.03
Rendimiento
Cdigo
Descripcin Recurso
Mano de Obra
147010001 CAPATAZ
147010003 OFICIAL
147010004 PEON
Materiales
239050000 AGUA
Equipos
337010001 HERRAMIENTAS MANUALES
349030003 COMPACTADOR VIBRATORIO TIPO PLANCHA 5.8 HP
MO. 200
Unidad
Cuadrilla
hh
hh
hh
EQ. 200
Cantidad
0.1
2
4
Precio S/.
Parcial S/.
0.004
0.08
0.16
18.58
15.39
13.84
0.07
1.23
2.21
3.52
m3
0.075
8.4
0.63
0.63
%MO
hm
0.03
0.08
3.52
15.54
0.11
1.24
1.35
Partida
2.04 BASE GRANULAR DE AFIRMADO DE E=4"
Rendimiento
m2/DIA
Cdigo
Descripcin Recurso
Mano de Obra
147010001 CAPATAZ
147010002 OPERARIO
147010004 PEON
MO. 150
Unidad
Cuadrilla
hh
hh
hh
Equipo: 150
Cantidad
0.1
2
4
Precio S/.
0.0053
0.1067
0.2133
Parcial S/.
18.58
18.36
13.84
0.10
1.96
2.95
5.01
Materiales
205010000 AFIRMADO
239050000 AGUA
m3
m3
Equipos
337010001 HERRAMIENTAS MANUALES
349030003 COMPACTADOR VIBRATORIO TIPO
%MO
hm
0.13
0.02
30.00
8.40
3.90
0.17
4.07
0.03
0.107
5.01
15.54
0.15
1.66
1.81
PLANCHA 5.8 HP
Partida
2.05
Rendimiento
Cdigo
Descripcin Recurso
Mano de Obra
147010001 CAPATAZ
147010004 PEON
Equipos
337010001 HERRAMIENTAS MANUALES
348040027 CAMION VOLQUETE
6 X 4 330 HP 10 m3
349040010 CARGADOR FRONTAL SOBRE
LLANTAS 125-155 HP 3 yd3
MO.
Unidad
hh
hh
150 EQ.
Cuadrilla
150 por : m3
Cantidad
Precio S/.
Parcial S/.
0.1
4
0.0053
0.2133
18.58
13.84
0.10
2.95
3.05
%MO
hm
0.03
0.16
3.05
100.84
0.09
16.13
hm
0.053
126.05
6.72
22.95
Partida
03.01.01
Rendimiento
Cdigo
Descripcin Recurso
Mano de Obra
147010001 CAPATAZ
147010002 OPERARIO
147010003 OFICIAL
147010004 PEON
MO.
Unidad
Equipos
337010001 HERRAMIENTAS MANUALES
349100007 MEZCLADORA DE CONCRETO
TAMBOR 18 HP 09 P3
Cuadrilla
hh
hh
hh
hh
Materiales
202010005 CLAVOS PARA MADERA CON CABEZA DE 3"
204000000 ARENA FINA
205000003 PIEDRA CHANCADA DE 1/2"
205010004 ARENA GRUESA
221000001 CEMENTO PORTLAND TIPO I (42.5 kg)
239050000 AGUA
120 por : m2
Cantidad
0.2
6
1
8
kg
m3
m3
m3
bls
m3
%MO
hm
120 EQ.
Precio S/.
Parcial S/.
0.013
0.400
0.067
0.533
18.58
18.36
15.39
13.84
0.25
7.34
1.03
7.38
16.00
0.05
0.02
0.1
0.05
0.9
0.18
4.897
171.808
171.808
183.608
20
8.4
0.24
3.44
17.18
9.18
18.00
1.51
49.55
0.03
0.067
16.00
21
0.48
1.40
1.88
Partida
03.01.02
Rendimiento
Cdigo
Descripcin Recurso
Mano de Obra
147010001 CAPATAZ
147010002 OPERARIO
147010004 PEON
Materiales
204000000 ARENA FINA
205000003 PIEDRA CHANCADA DE 1/2"
205000009 PIEDRA GRANDE DE 8"
205010004 ARENA GRUESA
221000001 CEMENTO PORTLAND TIPO I (42.5 kg)
239050000 AGUA
Equipos
337010001 HERRAMIENTAS MANUALES
349100007 MEZCLADORA DE CONCRETO
TAMBOR 18 HP 09 P3
MO. 12
Unidad
hh
hh
hh
Cuadrilla
Cantidad
0.1
1
6
m3
m3
m3
m3
bls
m3
%MO
hm
EQ. 12
Precio S/.
Parcial S/.
0.067
0.667
4.000
18.58
18.36
13.84
1.24
12.24
55.36
68.84
0.02
0.616
0.504
0.357
4.956
0.147
171.808
171.808
85.55
183.606
20
8.4
3.44
105.83
43.12
65.55
99.12
1.23
318.29
0.03
0.67
68.84
21
2.06516
14
16.07
Partida
03.01.03
Rendimiento
Cdigo
Descripcin Recurso
Mano de Obra
147010001 CAPATAZ
147010002 OPERARIO
147010003 OFICIAL
Materiales
202000008 ALAMBRE NEGRO RECOCIDO # 8
202010005 CLAVOS PARA MADERA CON
CABEZA DE 3"
245010001 MADERA TORNILLO INCLUYE CORTE
PARA ENCOFRADO
MO. 20
Unidad
Cuadrilla
hh
hh
hh
Equipo: 20
Cantidad
0.1
1
1
Precio S/.
Parcial S/.
0.04
0.4
0.4
18.58
18.36
15.39
0.7432
7.344
6.156
14.24
kg
kg
0.26
0.13
4.835
4.897
1.26
0.64
p2
4.83
6.018
29.07
30.96
Equipos
337010001 HERRAMIENTAS MANUALES
%MO
0.03
14.24
0.43
0.43
Partida
4.01
Rendimiento
MO. 100
Cdigo
Descripcin Recurso
Mano de Obra
147010003 OFICIAL
147010004 PEON
Unidad
Cuadrilla
hh
hh
Materiales
204000000 ARENA FINA
213000006 ASFALTO RC-250
m3
gal
Equipos
337010001 HERRAMIENTAS MANUALES
%MO
Equipo: 100
Cantidad
1
3
Precio S/.
Parcial S/.
0.08
0.24
15.39
13.84
1.23
3.32
4.55
0.002
0.133
171.808
9.24
0.344
1.229
1.57
0.03
4.55
0.137
0.14
Partida
5.01
Rendimiento
MO.
40
EQ.
40
Cdigo
Descripcin Recurso
Mano de Obra
147010002 OPERARIO
147010003 OFICIAL
147010004 PEON
Unidad
Cuadrilla
hh
hh
hh
Materiales
253050007 DISOLVENTE THINER
254010001 PINTURA ESMALTE SINTETICO
gal
gal
Equipos
337010001 HERRAMIENTAS MANUALES
%MO
Cantidad
Precio S/.
1
0.5
0.5
Parcial S/.
0.2
0.1
0.1
18.36
15.39
13.84
3.67
1.54
1.38
6.60
0.008
0.08
17.995
33.807
0.14
2.70
2.85
0.03
6.60
0.20
0.20
Partida
6.01
Rendimiento
MO. 1
Cdigo
Descripcin Recurso
Materiales
202110018 ARCOS DE FG DE 2" PARA FUTBOL, INC. COLOCACION DE
Unidad
Cuadrilla
est
Partida
6.02
Equipo: 1
Cantidad
Precio S/.
2
1,550.00
Rendimiento
glb/DIA
MO.
Cdigo
Descripcin Recurso
Materiales
202110019 SUMINISTRO DE TUBO FG DE 2" X 2.50 M, INC.
Unidad
EQ.
Cuadrilla
Costo unitario
directo por : glb
1
Cantidad
est
Precio S/.
2
225.13
COLOCACION Y ACABADO
Partida
6.03
Rendimiento
Cdigo
Materiales
239900102
MO. 1
Descripcin Recurso
Equipo: 1
Unidad
Cuadrilla
Cantidad
est
Precio S/.
1
72.56
Partida
8.01
Rendimiento
glb/DIA
Cdigo
Descripcin Recurso
Materiales
232000059 FLETE TERRESTRE DESDE CHIMBOTE A LLACLLIN (DSTO.
RECUAY)
MO.
1
Unidad
EQ.
Cuadrilla
glb
1
Cantidad
Precio S/.
1
59,315.23
Partida
7.01
Rendimiento
MO. 14
Cdigo
Descripcin Recurso
Mano de Obra
147010001 CAPATAZ
147010002 OPERARIO
147010004 PEON
Unidad
Cuadrilla
Cantidad
hh
hh
hh
VS
Materiales
202010005 CLAVOS PARA MADERA CON CABEZA DE 3"
204000000 ARENA FINA
221000001 CEMENTO PORTLAND TIPO I (42.5 kg)
239050000 AGUA
243130008 REGLA DE MADERA
kg
m3
bls
m3
p2
Equipos
337010001 HERRAMIENTAS MANUALES
%MO
Equipo: 14
0.1
1
1
Precio S/.
Parcial S/.
0.057
0.571
0.571
18.58
18.36
13.84
1.06
10.49
7.91
19.46
0.03
0.015
0.07
0.004
0.52
4.838
171.808
20
8.4
4.2
0.15
2.58
1.40
0.03
2.18
6.34
0.03
19.46
0.58
0.58
Partida
7.02
Rendimiento
Cdigo
Descripcin Recurso
Mano de Obra
147010001 CAPATAZ
147010002 OPERARIO
147010004 PEON
MO.
Unidad
hh
hh
hh
10.5 EQ.
Cuadrilla
10.5 por : m2
Cantidad
0.1
1
1
Precio S/.
0.076
0.762
0.762
Parcial S/.
18.58
18.36
13.84
1.42
13.99
10.54
25.95
Materiales
202010005 CLAVOS PARA MADERA CON CABEZA DE 3"
204000000 ARENA FINA
221000001 CEMENTO PORTLAND TIPO I (42.5 kg)
239050000 AGUA
243130008 REGLA DE MADERA
kg
m3
bls
m3
p2
Equipos
337010001 HERRAMIENTAS MANUALES
%MO
0.022
0.016
0.117
0.002
0.025
4.838
171.808
20
8.4
4.2
0.11
2.75
2.34
0.02
0.11
5.32
0.03
25.95
0.78
0.78
Partida
7.03
Rendimiento
Cdigo
Descripcin Recurso
Mano de Obra
147010001 CAPATAZ
147010002 OPERARIO
147010004 PEON
Materiales
202010005 CLAVOS PARA MADERA CON CABEZA DE 3"
204000000 ARENA FINA
221000001 CEMENTO PORTLAND TIPO I (42.5 kg)
239050000 AGUA
243130008 REGLA DE MADERA
Equipos
MO. 10
Unidad
hh
hh
hh
kg
m3
bls
m3
p2
Equipo: 10
Cuadrilla
Cantidad
0.1
1
1
Precio S/.
Parcial S/.
0.08
0.8
0.8
18.58
18.36
13.84
1.49
14.69
11.07
27.25
0.022
0.016
0.117
0.002
0.025
4.838
171.808
20
8.4
4.2
0.11
2.75
2.34
0.02
0.11
5.32
%MO
0.03
27.25
0.82
0.82
Partida
7.04
Rendimiento
Cdigo
Descripcin Recurso
Mano de Obra
147010001 CAPATAZ
147010002 OPERARIO
147010004 PEON
MO.
Unidad
hh
hh
hh
Materiales
202010005 CLAVOS PARA MADERA CON CABEZA DE 3"
204000000 ARENA FINA
221000001 CEMENTO PORTLAND TIPO I (42.5 kg)
239050000 AGUA
243130008 REGLA DE MADERA
kg
m3
bls
m3
p2
Equipos
337010001 HERRAMIENTAS MANUALES
%MO
12 EQ.
Cuadrilla
12 por : m2
Cantidad
0.1
1
1
Precio S/.
Parcial S/.
0.067
0.667
0.667
18.58
18.36
13.84
1.24
12.24
9.23
22.71
0.022
0.018
0.119
0.002
0.025
4.838
171.808
20
8.4
4.2
0.11
3.09
2.38
0.02
0.11
5.70
0.03
22.71
0.68
0.68
S/. 1.61
S/. 1.89
CAPATAZ
18.58
OPERARIO
OFICIAL
PEON
18.36
15.39
13.84
S/. 25.87
S/. 36.96
S/. 5.50
S/. 10.89
S/. 26.00
S/. 67.43
S/. 403.19
S/. 45.63
S/. 6.26
S/. 9.64
S/. 3,100.00
Parcial S/.
3,100.00
3100.00
1,550.00
S/. 450.26
Parcial S/.
Parcial s/.
450.26
450.26
S/. 72.56
Parcial S/.
Parcial s/.
72.56
72.56
S/. 59,315.23
Parcial S/.
Parcial s/.
59,315.23
59315.23
S/. 26.39
S/. 32.04
S/. 33.38
S/. 29.09
OBRA
ENTIDAD
UBICACIN
CONTRATISTA
RESIDENTE
SUPERVISOR
PRESUPUESTO
ITEM
1
1.01
1.02
2
2.01
2.02
2.03
2.04
2.05
3
3.01
03.01.01
03.01.02
03.01.03
4
4.01
5
5.01
6
6.01
6.02
6.03
7
07.01
07.02
07.03
07.04
8
8.01
0
GOBIERNO REGIONAL DE ANCASH
PRESUPUESTO
DESCRIPCION
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELES Y REPLANTEO
MOVIMIENTO DE TIERRAS
CORTE MANUAL DE TERRENO A NIVEL DE SUBRASANTE
EXCAVACION DE ZANJA PARA SARDINEL SUMERGIDO
CONFORMACION Y COMPACTACION DE SUBRASANTE C/EQUIPO
BASE GRANULAR DE AFIRMADO DE E=4"
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE, CARGUIO MANUAL
CONCRETO SIMPLE
LOSAS DEPORTIVA
CONCRETO F'c = 140 KG/CM, E=4" ACAB. 1:2
CONCRETO Fc = 140 KG/CM2 SARDINEL SUMERGIDO EN VEREDAS PERIMETRALE
ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA DE C SIMPLE
JUNTAS DE CONSTRUCCION Y EXPANSION
JUNTAS DE DILATACION CON ASFALTO DE 1"
PINTURA
COSTO DIRECTO
GASTOS GENERALES (14%)CD
UTILIDAD (7%)CD
SUBTOTAL
FACTOR DE RELACION (FR)
SUB TOTAL * FR
IGV (18%)
TOTAL PRESUPUESTO
AVANCE FISICO
VALORIZACION N 01
(Del 03 al 30 de noviembre del 2014)
ANTERIOR
UND
Metrdo
P.U.
Parcial
Metrado
2,380.00
m2
m2
680
680
Valorizacion
350.00
1.61
1,094.80
100.00
161.00
1.89
1,285.20
100.00
189.00
20,956.35
6,844.50
m3
170
25.87
4,397.90
100.00
2,587.00
m3
1.602
37
59.27
0.50
18.50
m2
680
5.50
3,740.00
100.00
550.00
m2
680
10.89
7,405.20
100.00
1,089.00
m3
205.9224
26.00
5,353.98
100.00
2,600.00
6,272.58
4,105.36
m2
102
17.88
1,823.76
100.00
1,788.00
m3
4.272
403.19
1,722.43
2.40
967.66
m2
60.6
44.99
2,726.39
30.00
1,349.70
2,191.00
m
350
6.26
2,191.00
3,898.42
626.00
100.00
626.00
964.00
404.4
9.64
3,898.42
100.00
964.00
3,622.82
225.13
0.00
glb
1,550.00
3,100.00
glb
225.13
450.26
1.00
225.13
glb
72.56
72.56
0.00
0.00
6,337.41
3,810.82
m2
61.698
26.39
1,628.21
40.00
1,055.60
m2
76.98
32.04
2,466.44
52.00
1,666.08
m2
63.246
33.38
2,111.15
30.00
1,001.40
m2
4.5
29.25
131.61
3.00
87.74
4.5
59,315.23
59,315.23
59,315.23
glb
0.00
0.00
0.00
104,973.81
16,925.81
14,696.33
2,369.61
7,348.17
1,184.81
127,018.31
20,480.23
1.09
138,449.96
22,323.45
22,863.30
4,018.22
161,313.25
26,341.67
16.12
149,881.61
161,313.25
PRECIO REFERENCIAL
S/. 0.00
FACTOR RELACION
1.09
PREC. CONTRATADO
S/. 0.00
FECHA
RIOR
ACTUAL
%
Metrado Valorizacion
14.71
11/30/2014
ACUMULADO
%
2,030.00
85.29
Metrado Valorizacion
2,380.00
100.00
14.71
580.00
933.80
85.29
680.00
1,094.80
100.00
14.71
580.00
1,096.20
85.29
680.00
1,285.20
100.00
14,111.84
67.34
20,956.34
100.00
4397.90
100.00
59.27
100.00
32.66
58.82
70.00
1,810.90
41.18
170.00
31.21
1.10
40.77
68.79
1.60
14.71
580.00
3,190.00
85.29
680.00
3740.00
100.00
14.71
580.00
6,316.20
85.29
680.00
7405.20
100.00
48.56
105.92
2,753.97
51.44
205.92
5353.97
100.00
65.45
60.00
2,167.22
34.55
60.00
6,272.58
100.00
98.04
2.00
35.76
1.96
102.00
1,823.76
100.00
56.18
1.87
754.77
43.82
4.27
1,722.43
100.00
49.51
30.60
1,376.69
50.49
60.60
2,726.39
100.00
28.57
60.00
1,565.00
71.43
2,191.00
100.00
28.57
250.00
1,565.00
71.43
350.00
2,191.00
100.00
24.73
60.00
2,934.42
75.27
60.00
3,898.42
100.00
24.73
304.40
2,934.42
75.27
404.40
3,898.42
100.00
6.21
60.00
3,397.69
93.79
60.00
3,622.82
100.00
0.00
2.00
3,100.00
100.00
2.00
3,100.00
100.00
50.00
1.00
225.13
50.00
2.00
450.26
100.00
0.00
1.00
72.56
100.00
1.00
72.56
100.00
60.13
60.00
2,526.59
39.87
6,337.41
100.00
64.83
21.70
572.61
35.17
61.70
1,628.21
100.00
67.55
24.98
800.36
32.45
76.98
2,466.44
100.00
47.43
33.25
1,109.75
52.57
63.25
2,111.15
100.00
66.67
1.50
43.87
33.33
4.50
131.61
100.00
0.00
60.00
59,315.23
100.00
60.00
59,315.23
100.00
0.00
1.00
59,315.23
100.00
1.00
59,315.23
100.00
88,047.99
104,973.80
12,326.72
14,696.33
6,163.36
7,348.17
106,538.07
127,018.30
116,126.49
138,449.94
19,176.85
22,863.29
135,303.35
161,313.24
83.88%
100.00%
S/. 138,449.96
SALDO
Metrado
Valorizacion
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.01
0.00
0.00
0.00
0.00
0.00
0.01
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-60.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
104,973.80
0.00
14,696.33
0.00
7,348.17
0.00
127,018.30
0.00
0.00
22,863.29
0.00
161,313.24
0.00%
100.00%
CANTIDAD
CAPATAZ
Parcial S/.
INCIDENCIA
55.17
1024.99
0.0077
OPERARIO
375.63
6896.56
0.0517
OFICIAL
153.88
2368.26
0.0178
1026.06
14200.64
0.1065
13.6
249.7
0.0019
15.7600
76.26
0.0006
18.0100
88.27
0.0007
2.0000
450.26
0.0034
2.0000
3,100.00
0.0232
1.0000
72.56
0.0005
13.6000
76.98
0.0006
292.7000
1,762.04
0.0132
35.7000
149.94
0.0011
32.3500
1,093.82
0.0082
3.2400
58.23
0.0004
12.83
2204.3700
0.0165
2.15
184.1100
0.0014
ARENA FINA
6.08
1043.8500
0.0078
ARENA GRUESA
6.62
1216.3100
0.0091
PEON
OPERARIO TOPOGRAFO
AFIRMADO
88.4
2652.0000
0.0199
46.55
430.1200
0.0032
134.2200
2684.4700
0.0201
YESO
34.0000
179.8600
0.0013
AGUA
ASFALTO RC-250
CEMENTO PORTLAND TIPO I (42.5 kg)
84.1200
706.6300
0.0053
WINCHA METALICA DE 50 m
2.0400
40.80
0.0003
TEODOLITO
1.7000
204.00
0.0015
741.85
0.0056
126.9600
1,972.90
0.0148
11.0800
1,396.43
0.0105
33.2600
3,353.54
0.0252
202.65
0.0015
59315.23
0.445
HERRAMIENTAS MANUALES
COMPACTADORA VIBRATORIA TIPO
PLANCHA 7 HP
CARGADOR SOBRE LLANTAS DE 125-135 HP
3 yd3
CAMION VOLQUETE DE 10 m3
MEZCLADORA DE CONCRETO 11 P3 (23 HP)
FLETE TERRESTRE-CHIMBOTE A LLACLLIN
COSTO DIRECTO
GASTOS GENERALES 14%
UTILIDADES 7%
g
1.0000
110197.63
15427.6682
0.1157024793
7713.8341
0.0578512397
SUB TOTAL
133339.1323
I.G.V. 18%
24001.043814
PRESUPUESTO TOTAL
157340.176114
1.00
:agoto 2014
MONOMIOS
SIMBOLO
IU
1.0
MO
47
Md
43
MADERA NACIONAL
54
5
22
37
PINTURA
4.0
P
AG
C
EN
5.0
GGU
39
2.0
3.0
DESCRIPCION
MANO DE OBRA
ACERO
AGREGADO GRUESO
CEMENTO
EQUIPOS NACIONALES
=0.1855(/)+0.052((0.5466+0.2871+0.1663)/(0.5466+0.2871
+0.0848((0.684+0.316)/(0.684+0.316))+0.5042(/)+0.1736(
K = 1.007
Simbolos
0.1855
0.0284
MO
0.5466
0.0149
0.2871
0.0086
0.1663
0.0580
0.6840
0.0268
0.3160
0.5042
0.5042
0.1736
0.1736
1.00
0.0520
AMP
0.0848
AgC
EN
0.1736
GGU
CRIPCION
RECIOS AL CONSUMIDOR
63)/(0.5466+0.2871+0.1663))
5042(/)+0.1736(/)
I.U BASE
Aug-14
523.7
523.700
468.1
523.700
584.29
587.370
373.45
217.2
367.3
291.11
376.15
217.200
367.3
292.830
402.37
403.940
VALORIZACIN
Jan-15
Nov.
: "Mejoramiento y ampliacion del sistema de agua potable de la Urbanizacion la Colina, Distrito de Independencia - Huarr
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE INDEPENDENCIA
CONTRATISTA :
: GLOBALCON CONSTRUCTORES Y CONSULTORES S.R.L
SUPERVISN :
: Ing. Abelardo Manrique Daz Salas CIP: 29555
RESIDENTE
:
: Ing. Wilder Marino Sotelo CIP: 45812
FECHA PRESUPUESTO BAS
Aug-14
FORMULA DEL REAJUSTE :
R = V x (K-1)
ITEM
DESCRIPCION
MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL DEL Jr. AUGUSTO B. LEGUIA TRAMO: Jr. PALLASCA - Av. CON
ANCASH
: GLOBALCON CONSTRUCTORES Y CONSULTORES S.R.L
: Ing. Abelardo Manrique Daz Salas CIP: 29555
: Ing. Wilder Marino Sotelo CIP: 45812
Aug-14
=0.1855(/)+0.052((0.5466+0.2871+0.1663)/(0.5466+0.2871+0.1663
+0.0848((0.684+0.316)/(0.684+0.316))+0.5042(/)+0.1736(/
SIMBOLO
IU
MO
47
DESCRIPCION
MANO DE OBRA
FACTOR
INCID. (%)
0.1855
100
ACERO
0.0280
54.66
43
MADERA NACIONAL
0.0149
28.71
54
PINTURA
0.0086
16.63
100
Ag
AGRGADO
0.058
68.4
22
CEMENTO
0.0268
31.6
EN
37
EQUIPOS NACIONALES
0.5042
1000
GGU
39
0.1736
100
1.00
1.000
REAJUSTE (K)
VALORIZACION
BRUTA SIN (IGV)
REAJUSTE BRUTO
VALORIZACIN
REAJUSTADA
1.007
116,126.49
818.71
116,945.20
966.0731541533
EGUIA TRAMO: Jr. PALLASCA - Av. CONFRAT. INTERN. ESTE, DIST. DE INDEPENDENCIA, PROV. DE HUARAZ ANCASH
AREA GEOGRAFICA :
0.5466+0.2871+0.1663))
/)+0.1736(/)
I.U BASE
Aug-14
Nov-14
523.70
523.700
Jan-15
0.186
468.10
523.700
0.031
584.29
587.370
0.015
291.11
292.830
0.009
217.2
217.200
0.058
367.30
367.300
0.027
291.11
292.83
0.507
402.37
403.940
0.174
1.007
OBRA
ENTIDAD
UBICACIN
CONTRATISTA
RESIDENTE
SUPERVISOR
PRESUPUESTO
ITEM
1
1.01
1.02
2
2.01
2.02
2.03
2.04
2.05
3
3.01
03.01.01
03.01.02
03.01.03
4
4.01
5
5.01
6
6.01
6.02
6.03
7
07.01
07.02
07.03
07.04
8
8.01
0
GOBIERNO REGIONAL DE ANCASH
PRESUPUESTO
DESCRIPCION
UND
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELES Y REPLANTEO
m2
m2
MOVIMIENTO DE TIERRAS
CORTE MANUAL DE TERRENO A NIVEL DE SUBRASANTE
EXCAVACION DE ZANJA PARA SARDINEL SUMERGIDO
CONFORMACION Y COMPACTACION DE SUBRASANTE C/EQUIPO
BASE GRANULAR DE AFIRMADO DE E=4"
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE, CARGUIO MANUAL
m3
m3
m2
m2
m3
CONCRETO SIMPLE
LOSAS DEPORTIVA
CONCRETO F'c = 140 KG/CM, E=4" ACAB. 1:2
CONCRETO Fc = 140 KG/CM2 SARDINEL SUMERGIDO EN VEREDAS PERIMETRALE
ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA DE C SIMPLE
m2
m3
m2
PINTURA
PINTURA CON ESMALTE PARA LINEAS DE JUEGO
EQUIPAMIENTO Y OTROS
SUMINISTRO Y COLOCACION DE ARCOS DE F G 2", INC. TABLERO DE BASQUET
SUMINISTRO Y COLOCACION DE TUBOS DE F G 2", PARA LA NET DE VOLEY
SUMINISTRO Y COLOCACION DE NET DE VOLEY
glb
glb
glb
REVOQUES Y ENLUCIDOS
TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA
TARRAJEO EN INTERIORES CON CEMENTO-ARENA (C:A, 1:5)
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA (C:A, 1:5)
TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-ARENA (C:A, 1:5)
m2
m2
m2
m2
FLETE TERRESTRE
FLETE TERRESTRE
COSTO DIRECTO
GASTOS GENERALES (14%)CD
UTILIDAD (7%)CD
glb
SUBTOTAL
FACTOR DE RELACION (FR)
SUB TOTAL * FR
IGV (18%)
TOTAL PRESUPUESTO
AVANCE FISICO
VALORIZACION N 01
(Del 03 al 30 de noviembre del 2014)
ANTERIOR
Metrdo
P.U.
680
680
1.61
1.89
170
1.602
680
680
205.9224
25.87
37
5.50
10.89
26.00
102
4.272
60.6
17.88
403.19
44.99
350
6.26
404.4
9.64
2
2
1
1,550.00
225.13
72.56
61.698
76.98
63.246
4.5
26.39
32.04
33.38
29.25
4.5
59,315.23
Parcial
2,380.00
1,094.80
1,285.20
20,956.35
4,397.90
59.27
3,740.00
7,405.20
5,353.98
6,272.58
1,823.76
1,722.43
2,726.39
2,191.00
2,191.00
3,898.42
3,898.42
3,622.82
3,100.00
450.26
72.56
6,337.41
1,628.21
2,466.44
2,111.15
131.61
59,315.23
59,315.23
104,973.81
14,696.33
7,348.17
Metrado Valorizacion
2,380.00
680.00
1,094.80
680.00
1,285.20
11,450.14
170.00
4,397.90
1.602
59.27
100.00
550.00
100.00
1,089.00
205.92
5,353.97
4,105.36
100.00
2.40
30.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
1,788.00
967.66
1,349.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
17,935.50
2,510.97
1,255.49
ACTUAL
%
100.00
100.00
100.00
54.64
100.00
100.00
14.71
14.71
100.00
65.45
Metrado
98.04
56.18
49.51
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
2.00
1.87
30.60
60.00
250.00
60.00
304.40
60.00
2.00
1.00
1.00
60.00
21.70
24.98
33.25
1.50
60.00
1.00
0.00
0.00
0.00
0.00
580.00
580.00
0.00
60.00
127,018.31
1.09
138,449.96
22,863.30
161,313.25
149,881.61
161,313.25
21,701.96
23,655.13
4,257.92
27,913.05
17.09
PRESIO REFERENCIAL
FACTOR RELACION
PREC. CONTRATADO
FECHA
ACTUAL
%
0.00
0.00
0.00
45.36
0.00
0.00
85.29
85.29
0.00
34.55
35.76
754.77
1,376.69
1,565.00
1,565.00
2,934.42
2,934.42
3,397.69
3,100.00
225.13
72.56
2,526.59
572.61
800.36
1,109.75
43.87
59,315.23
59,315.23
1.96
43.82
50.49
71.43
71.43
75.27
75.27
93.79
100.00
50.00
100.00
39.87
35.17
32.45
52.57
33.33
100.00
100.00
81,412.35
11,397.73
5,698.86
S/. 138,449.96
ACUMULADO
0.00
0.00
0.00
9,506.20
0.00
0.00
3,190.00
6,316.20
0.00
2,167.22
Valorizacion
S/. 0.00
1.09
S/. 0.00
11/30/2014
Metrado Valorizacion
2,380.00
680.00
1,094.80
680.00
1,285.20
20,956.34
170.00 4397.90
1.60
59.27
680.00 3740.00
680.00 7405.20
205.92 5353.97
60.00
6,272.58
102.00
4.27
60.60
250.00
60.00
304.40
60.00
2.00
1.00
1.00
21.70
24.98
33.25
1.50
60.00
1.00
1,823.76
1,722.43
2,726.39
1,565.00
1,565.00
2,934.42
2,934.42
3,397.69
3,100.00
225.13
72.56
2,526.59
572.61
800.36
1,109.75
43.87
59,315.23
59,315.23
99,347.85
13,908.70
6,954.35
SALDO
%
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
100.00
Metrado
100.00
100.00
100.00
71.43
71.43
75.27
75.27
93.79
100.00
50.00
100.00
39.87
35.17
32.45
52.57
33.33
100.00
100.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0.00
100.00
-60.00
100.00
0.00
1.00
0.00
40.00
52.00
30.00
3.00
0.00
Valorizacion
0.00
0.00
0.00
0.01
0
0
0
0
0.01
626.00
0.00
0.00
0.00
626.00
626.00
964.00
964.00
225.13
0.00
225.13
0.00
3,810.82
1,055.60
1,666.08
1,001.40
87.74
0.00
0.00
0.00
0.00
0.00
98,508.94
120,210.90
0.00
107,374.75
17,731.61
125,106.36
77.55%
131,029.88
21,637.96
152,667.84
94.64%
0.00
0.00
0.00
0.00%
449.96
SALDO
%
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
9.98
0.00
0.00
0.00
28.57
28.57
24.73
24.73
6.21
0.00
50.00
0.00
60.13
64.83
67.55
47.43
66.67
0.00
0.00
99,347.85
13,908.70
6,954.35
120,210.90
21,637.96
152,667.84
94.64%
CANTIDAD
CAPATAZ
Parcial S/.
INCIDENCIA
55.17
1024.99
0.0077
OPERARIO
375.63
6896.56
0.0517
OFICIAL
153.88
2368.26
0.0178
1026.06
14200.64
0.1065
13.6
249.7
0.0019
15.7600
76.26
0.0006
18.0100
88.27
0.0007
2.0000
450.26
0.0034
2.0000
3,100.00
0.0232
1.0000
72.56
0.0005
13.6000
76.98
0.0006
292.7000
1,762.04
0.0132
35.7000
149.94
0.0011
32.3500
1,093.82
0.0082
3.2400
58.23
0.0004
12.83
2204.3700
0.0165
2.15
184.1100
0.0014
ARENA FINA
6.08
1043.8500
0.0078
ARENA GRUESA
6.62
1216.3100
0.0091
PEON
OPERARIO TOPOGRAFO
AFIRMADO
88.4
2652.0000
0.0199
46.55
430.1200
0.0032
134.2200
2684.4700
0.0201
YESO
34.0000
179.8600
0.0013
AGUA
ASFALTO RC-250
CEMENTO PORTLAND TIPO I (42.5 kg)
84.1200
706.6300
0.0053
WINCHA METALICA DE 50 m
2.0400
40.80
0.0003
TEODOLITO
1.7000
204.00
0.0015
741.85
0.0056
126.9600
1,972.90
0.0148
11.0800
1,396.43
0.0105
33.2600
3,353.54
0.0252
202.65
0.0015
59315.23
0.445
HERRAMIENTAS MANUALES
COMPACTADORA VIBRATORIA TIPO
PLANCHA 7 HP
CARGADOR SOBRE LLANTAS DE 125-135 HP
3 yd3
CAMION VOLQUETE DE 10 m3
MEZCLADORA DE CONCRETO 11 P3 (23 HP)
FLETE TERRESTRE-CHIMBOTE A LLACLLIN
COSTO DIRECTO
GASTOS GENERALES 14%
UTILIDADES 7%
g
1.0000
110197.63
15427.6682
0.1157024793
7713.8341
0.0578512397
SUB TOTAL
133339.1323
I.G.V. 18%
24001.043814
PRESUPUESTO TOTAL
157340.176114
1.00
:agoto 2014
MONOMIOS
SIMBOLO
IU
1.0
MO
47
Md
43
MADERA NACIONAL
54
5
22
37
PINTURA
4.0
P
AG
C
EN
5.0
GGU
39
2.0
3.0
DESCRIPCION
MANO DE OBRA
ACERO
AGREGADO GRUESO
CEMENTO
EQUIPOS NACIONALES
=0.1855(/)+0.052((0.5466+0.2871+0.1663)/(0.5466+0.2871
+0.0848((0.684+0.316)/(0.684+0.316))+0.5042(/)+0.1736(
K = 1.007
Simbolos
0.1855
0.0284
MO
0.5466
0.0149
0.2871
0.0086
0.1663
0.0580
0.6840
0.0268
0.3160
0.5042
0.5042
0.1736
0.1736
1.00
0.0520
AMP
0.0848
AgC
EN
0.1736
GGU
CRIPCION
RECIOS AL CONSUMIDOR
63)/(0.5466+0.2871+0.1663))
5042(/)+0.1736(/)
I.U BASE
Aug-14
523.7
523.700
468.1
523.700
584.29
587.370
373.45
217.2
367.3
291.11
376.15
217.200
367.3
292.830
402.37
403.940
VALORIZACIN
Jan-15
Nov.
: "Mejoramiento y ampliacion del sistema de agua potable de la Urbanizacion la Colina, Distrito de Independencia - Huarr
ENTIDAD:
MUNICIPALIDAD DISTRITAL DE INDEPENDENCIA
CONTRATISTA :
: GLOBALCON CONSTRUCTORES Y CONSULTORES S.R.L
SUPERVISN :
: Ing. Abelardo Manrique Daz Salas CIP: 29555
RESIDENTE
:
: Ing. Wilder Marino Sotelo CIP: 45812
FECHA PRESUPUESTO BAS
Aug-14
FORMULA DEL REAJUSTE :
R = V x (K-1)
ITEM
DESCRIPCION
MEJORAMIENTO DE LA INFRAESTRUCTURA VIAL DEL Jr. AUGUSTO B. LEGUIA TRAMO: Jr. PALLASCA - Av. CON
ANCASH
: GLOBALCON CONSTRUCTORES Y CONSULTORES S.R.L
: Ing. Abelardo Manrique Daz Salas CIP: 29555
: Ing. Wilder Marino Sotelo CIP: 45812
Aug-14
=0.1855(/)+0.052((0.5466+0.2871+0.1663)/(0.5466+0.2871+0.1663
+0.0848((0.684+0.316)/(0.684+0.316))+0.5042(/)+0.1736(/
SIMBOLO
IU
MO
47
DESCRIPCION
MANO DE OBRA
FACTOR
INCID. (%)
0.1855
100
ACERO
0.0280
54.66
43
MADERA NACIONAL
0.0149
28.71
54
PINTURA
0.0086
16.63
100
Ag
AGRGADO
0.058
68.4
22
CEMENTO
0.0268
31.6
EN
37
EQUIPOS NACIONALES
0.5042
1000
GGU
39
0.1736
100
1.00
1.000
REAJUSTE (K)
VALORIZACION
BRUTA SIN (IGV)
REAJUSTE BRUTO
VALORIZACIN
REAJUSTADA
1.007
107,374.75
757.01
108,131.75
893.2661126226
EGUIA TRAMO: Jr. PALLASCA - Av. CONFRAT. INTERN. ESTE, DIST. DE INDEPENDENCIA, PROV. DE HUARAZ ANCASH
AREA GEOGRAFICA :
0.5466+0.2871+0.1663))
/)+0.1736(/)
I.U BASE
Aug-14
Nov-14
523.70
523.700
Jan-15
0.186
468.10
523.700
0.031
584.29
587.370
0.015
291.11
292.830
0.009
217.2
217.200
0.058
367.30
367.300
0.027
291.11
292.83
0.507
402.37
403.940
0.174
1.007
Presupuesto
Presupuesto
Subpresupuesto
Cliente
Lugar
1
1.01
1.02
2
2.01
2.02
2.03
2.04
2.05
3
3.01
03.01.01
03.01.02
03.01.03
4
4.01
5
5.01
6
6.01
6.02
6.03
7
07.01
07.02
07.03
07.04
8
8.01
Descripcin
TRABAJOS PRELIMINARES
LIMPIEZA DE TERRENO MANUAL
TRAZO, NIVELES Y REPLANTEO
MOVIMIENTO DE TIERRAS
CORTE MANUAL DE TERRENO A NIVEL DE SUBRASANTE
EXCAVACION DE ZANJA PARA SARDINEL SUMERGIDO
CONFORMACION Y COMPACTACION DE SUBRASANTE C/E
BASE GRANULAR DE AFIRMADO DE E=4"
ELIMINACION DE MATERIAL EXCEDENTE CON VOLQUETE,
CONCRETO SIMPLE
LOSAS DEPORTIVA
CONCRETO F'c = 140 KG/CM, E=4" ACAB. 1:2
CONCRETO Fc = 140 KG/CM2 SARDINEL SUMERGIDO EN
ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA DE C
JUNTAS DE CONSTRUCCION Y EXPANSION
JUNTAS DE DILATACION CON ASFALTO DE 1"
PINTURA
PINTURA CON ESMALTE PARA LINEAS DE JUEGO
EQUIPAMIENTO Y OTROS
SUMINISTRO Y COLOCACION DE ARCOS DE F G 2", INC.
SUMINISTRO Y COLOCACION DE TUBOS DE F G 2", PARA
SUMINISTRO Y COLOCACION DE NET DE VOLEY
REVOQUES Y ENLUCIDOS
TARRAJEO PRIMARIO RAYADO CON CEMENTO-ARENA
TARRAJEO EN INTERIORES CON CEMENTO-ARENA (C:A, 1:5
TARRAJEO EN EXTERIORES CON CEMENTO-ARENA (C:A, 1:
TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTO-AR
FLETE TERRESTRE
FLETE TERRESTRE
COSTO DIRECTO
GASTOS GENERALES 14%
UTILIDADES 7%
SUB TOTAL
I.G.V. 18%
PRESUPUESTO TOTAL
SON : DOSCIENTOS DOCE MIL OCHOCIENTOS DOS Y 45/100 NUEVOS SOLES
to
Und.
Metrado
Precio S/.
m2
m2
680
680
1.61
1.89
m3
m3
m2
m2
m3
170
1.602
680
680
205.9224
25.87
37
5.50
10.89
26.00
m2
m3
m2
680
4.272
60.6
67.43
403.19
45.63
350
6.26
404.4
9.64
glb
glb
glb
2
2
1
3,100.00
450.26
72.56
m2
m2
m2
m2
61.698
76.98
63.246
4.5
26.39
32.04
33.38
29.09
glb
59,315.23
149,042.20
20,865.91
10,432.95
-----------
Parcial S/.
2,386.32
1097.947
1288.369
20,952.75
4,397.95
59.21
3,739.13
7,402.43
5,354.03
50,342.30
45,854.61
1,722.44
2,765.25
2,191.67
2,191.67
3,898.97
3,898.97
7,173.08
6,200.00
900.52
72.56
6336.82
1627.93
2466.79
2111.21
130.89
59,315.23
59,315.23
180,341.06
32,461.39
=======
212,802.45
S DOS Y 45/100 NUEVOS SOLES
ANALISIS DE
Obra :
Plazo: 60.00
Fecha :
das calendario
2.00
=
=
Monto Afianzado.
Sencico
RESUMEN:
- Gastos Indirectos.
- Gastos Directos.
- Gastos de Seguros
- Gastos Financieros.
- Gastos de Licitacin y Contrato.
Ecuacin
N=
N=
N=
N=
Costo Directo
149,042.20
178,725.15
180,344.28
+
+
/
Total Resumen
Gastos Generales
G.G.
19,250.00
0.9910
0.0090
Gastos Generales
20,869.13
149,042.20
Gastos Generales
14.00
QUIPAMIENTO DE LA INSTITUCION EDUCATIVA EDUARDO A. BUSTAMENTE ALVARADO DEL CC.PP. CHAUCAYAN, DISTRITO DE LLACLLIN - RECUAY - AN
Meses
la instalacin
CANTIDAD
25%
25%
25%
25%
25%
25%
25%
Sub Total
2.00
meses
(botas, cascos,
MESES
1.00
1.00
2.00
2.00
1.00
1.00
2.00
2.00
1.00
2.00
1.00
2.00
1.00
1.00
1.00
2.00
2.00
2.00
el monto afianzado :
1.50%
N
2.00
Meses
10.00%
60.00%
1 x 1.5 x 0.70 N
100
0.20%
Total Gastos Financieros
TOTAL RESUMEN =
+
+
0.0090 N
0.0090 N
180,344.28
0.0090
+
+
19,250.00
CD
x
149,042.20
%
100
COSTO DIRECTO :
UTILIDAD (7.00%) :
P.UNITARIO
149,042.20
10,432.95
TOTAL
200.00
50.00
3,000.00
1,800.00
550.00
600.00
750.00
450.00
137.50
150.00
100.00
150.00
25.00
37.50
1,600.00
3,200.00
3,200.00
P.UNITARIO
TOTAL
3,000.00
2,000.00
6,000.00
4,000.00
800.00
800.00
1,600.00
1,600.00
120.00
240.00
600.00
1,200.00
100.00
200.00
80.00
200.00
400.00
160.00
15,400.00
500.00
500.00
500.00
0.70
0.0070
0.002
0.0090
150.00
3,200.00
15,400.00
500.00
0.0090 N
N
Utilidad
10,432.95
20,869.13
150.00
19,250.00
10.33 %
3.67 %
14.00 %
14.0022