1. Kasus
Dik:
Kick Of Point
= 400 m
Kedalaman Tegak
= 2.800 m
Horizontal Displacement
Build Up Rate
= 750 m
= 1,5/ 10 m
Maka :
D >> R
a) Step Pertama.
= 6.5217
Sin
81.28
Maka
= 0.9884
=
=
= 0.1573
b) Step Kedua
Step Pertama:
= 119.6
= 2280.04
Step Kedua :
Jadi
2. Kasus
Kick Of Point
= 600 m ( ZK )
Kedalaman Tegak
= 1.800 m ( Z )
Horizontal Displacement
= 300 m ( D )
Build Up Rate
= 1/ 10 m
Sudut Inklinasi ?
Jawab:
Build Up Rate
= 573
D<<R
Step Pertama:
= 4.396
Maka :
= 0.4656
Step Kedua :
3. Kasus
Kick Of Point
Kedalaman Akhir Tegak
Horizontal Displacement
Build Up Rate
Drop Off Rate
= 300 m ( ZK )
= 2.500 m ( ZF)
= 1.800 m ( D )
= 1/ 10 m
= 0,5/ 10 m
Sudut Inklinasi.
Maka :
D >> R
Step Pertama.
= 27.16
Sin
87.89
Maka
= 0.9993
=
=
= 0.7808
Step Kedua
4. Kasus
Kick Of Point
= 250 m ( ZK )
= 2.000 m ( ZD )
= 2.500 m ( ZF)
= 2.750 m ( Z )
Horizontal Displacement
= 1.800 m ( D )
Build Up Rate
= 1/ 10 m
= 0,5/ 10 m
Maka :
Step Pertama.
= 27.78
Sin
87.28
Maka
= 0.9994
=
=
= 0.7635
Step Kedua
Step Pertama:
= 1286.15
Step Kedua:
=
=
=
= 1497.59
Step Ketiga:
Jadi