Vous êtes sur la page 1sur 9

TUGAS II

DIRECTIONAL DRILLING

Dosen :

Ir. Widradjat Aboekasan, MM, MBA

Oleh :
Rosidelly
171131009

PROGRAM MAGISTER TEKNIK PERMINYAKAN


FAKULTAS TEKNOLOGI KEBUMIAN DAN ENERGI
UNIVERSITAS TRISAKTI
JAKARTA

2014

1. Kasus
Dik:
Kick Of Point

= 400 m

Kedalaman Tegak

= 2.800 m

Horizontal Displacement
Build Up Rate

= 750 m

= 1,5/ 10 m

Sudut Inklinasi & Total Measure Depth?


Jawab:
Sudut Inklinasi.

Maka :

D >> R

a) Step Pertama.
= 6.5217
Sin

81.28

Maka

= 0.9884

=
=
= 0.1573

b) Step Kedua

Total Measure Depth

Step Pertama:

= 119.6

= 2280.04
Step Kedua :

Jadi

2. Kasus
Kick Of Point

= 600 m ( ZK )

Kedalaman Tegak

= 1.800 m ( Z )

Horizontal Displacement

= 300 m ( D )

Build Up Rate

= 1/ 10 m

Sudut Inklinasi ?
Jawab:
Build Up Rate

= 573

D<<R

Step Pertama:

= 4.396

Maka :

= 0.4656

Step Kedua :

3. Kasus
Kick Of Point
Kedalaman Akhir Tegak
Horizontal Displacement
Build Up Rate
Drop Off Rate

= 300 m ( ZK )
= 2.500 m ( ZF)
= 1.800 m ( D )
= 1/ 10 m
= 0,5/ 10 m

Sudut Inklinasi & Total Measure Depth?


Jawab:
5

Sudut Inklinasi.

Maka :

D >> R

Step Pertama.

= 27.16
Sin

87.89

Maka

= 0.9993

=
=
= 0.7808

Step Kedua

4. Kasus
Kick Of Point

= 250 m ( ZK )

Kedalaman awal Drop Off

= 2.000 m ( ZD )

Kedalaman Akhir Tegak

= 2.500 m ( ZF)

Kedalaman Total Akhir Tegak

= 2.750 m ( Z )

Horizontal Displacement

= 1.800 m ( D )

Build Up Rate

= 1/ 10 m

Drop Off Rate

= 0,5/ 10 m

Sudut Inklinasi & Total Measure Depth?


Jawab.
Sudut Inklinasi:

Maka :

Step Pertama.

= 27.78
Sin

87.28

Maka

= 0.9994

=
=
= 0.7635

Step Kedua

Total Measure Depth

Step Pertama:

= 1286.15
Step Kedua:

=
=
=

= 1497.59
Step Ketiga:

Jadi

Vous aimerez peut-être aussi