TABLAS DE CONCRETOS NORMAL Y RESISTENCIA

-COSTO Y TIEMPO EN LAS OBRASCLASIFICACION


F'c

REVENIMIENTO

100 KG/CM2

8 A 10 CM.
12 A 15 CM.

150 KG/CM2

8 A 10 CM.
12 A 15 CM.

200 KG/CM2

8 A 10 CM.
12 A 15 CM.

250 KG/CM2

8 A 10 CM.
12 A 15 CM.

ING. CARLOS SUAREZ SALAZAR


AGREGADO
MAXIMO

CEMENTO
TON

3ERA EDICION DE 2002

AREANA GRAVA
M3
M3

3/4"
1 1/2"
3/4"
1 1/2"

0.26
0.254
0.286
0.28

0.5
0.47
0.5
0.47

0.68
0.7
0.68
0.7

3/4"
1 1/2"
3/4"
1 1/2"

0.323
0.308
0.354
0.338

0.48
0.45
0.48
0.45

0.67
0.7
0.67
0.7

3/4"
1 1/2"
3/4"
1 1/2"

0.355
0.337
0.391
0.373

0.47
0.44
0.47
0.44

0.65
0.68
0.65
0.68

3/4"
1 1/2"
3/4"
1 1/2"

0.423
0.4
0.467
0.445

0.465
0.435
0.465
0.435

0.64
0.67
0.64
0.67

TENCIA

EDICION DE 2002

AGUA M3

0.195
0.19
0.215
0.21
0.21
0.2
0.23
0.22
0.195
0.185
0.215
0.205
0.19
0.18
0.21
0.2

DOSIFICAION Y PROPORCIONAMIENTO PARA FABRICAION DE CONCRETO


MANUAL TECNICO DE CONSTRUCCION APASCO

TAM= 19 MM
CONCRETO

CEMENTO
BULTO

ARENA BOTE

GRAVA BOTE

AGUA BOTE

100 KG/CM2

7.5

150 KG/CM2

5.5

6.5

2.5

200 KG/CM2

250 KG/CM2

3.5

1.75

300 KG/CM2

2.5

4.5

1.25
1 BOTE= 19 LITROS
1 BULTO= 50KG

TAM= 40 MM
CONCRETO

CEMENTO
BULTO

ARENA BOTE

GRAVA BOTE

AGUA BOTE

100 KG/CM2

7.5

9.5

150 KG/CM2

5.5

8.5

2.5

200 KG/CM2

7.5

250 KG/CM2

3.5

6.5

1.75

300 KG/CM2

2.5

5.5

1.25
1 BOTE= 19 LITROS
1 BULTO= 50KG

DE CONCRETO

DOSIFICAION Y PROPORCIONAMIENTO PARA FABRICAION DE


MANUAL TECNICO DE CONSTRUCCION APASCO
PROPORCIONAMIENTO PARA 1 M3 DE CONCRETO TAM= 19 MM

TAM= 19 MM
CONCRETO

CEMENTO
BULTO

ARENA
BOTE

GRAVA
BOTE

AGUA
BOTE

CONCRETO

100 KG/CM2

7.5

100 KG/CM2

150 KG/CM2

5.5

6.5

2.5

150 KG/CM2

200 KG/CM2

200 KG/CM2

250 KG/CM2

3.5

1.75

250 KG/CM2

300 KG/CM2

2.5

4.5

1.25

300 KG/CM2

1 BOTE= 19 LITROS
1 BULTO= 50KG

1 BOTE= 19 LITROS
1 BULTO= 50KG

TAM= 40 MM
CONCRETO

1 BOTE= 19 LITROS
1 BULTO= 50KG

CEMENTO
BULTO

ARENA
M3

GRAVA M3

AGUA
M3

CONCRETO

100 KG/CM2

2.84495 0.40541 0.43243 0.16216

100 KG/CM2

150 KG/CM2

3.62976 0.37931 0.44828 0.17241

150 KG/CM2

200 KG/CM2

4.38596 0.33333

0.16667

200 KG/CM2

250 KG/CM2

5.13479 0.34146

0.4878 0.17073

250 KG/CM2

300 KG/CM2

6.37959 0.30303 0.54545 0.15152

300 KG/CM2

0.5

ARA FABRICAION DE CONCRETO

DOSIFICAION Y PROPORCIONAMIENTO PA

RUCCION APASCO

MANUAL TECNICO DE CONSTR

E CONCRETO TAM= 19 MM
CEMENTO
BULTO

PROPORCIONAMIENTO PARA 1 M3 DE

ARENA
M3

GRAVA
M3

0.1425

0.152

0.1045

0.076

0.0665

0.0475

AGUA
M3

DE
M3

CEMENTO
BULTO

ARENA
BOTE

GRAVA
BOTE

AGUA
BOTE

0.057 0.352 100 KG/CM2

7.5

9.5

0.1235 0.0475 0.276 150 KG/CM2

5.5

8.5

2.5

0.114

0.038 0.228 200 KG/CM2

7.5

0.095

0.0333 0.195 250 KG/CM2

3.5

6.5

1.75

0.0855 0.0238 0.157 300 KG/CM2

2.5

5.5

1.25

CONCRETO

1 BOTE= 19 LIT

1 BULTO= 50K

CEMENTO
TON

ARENA
M3

CONCRETO

CEMENTO
BULTO

ARENA
M3

GRAVA
M3

0.14225 0.40541 0.43243 0.1622

100 KG/CM2

2.63158

0.375

0.475

0.18149 0.37931 0.44828 0.1724

150 KG/CM2

3.18979 0.33333 0.5152 0.15152

0.1667

200 KG/CM2

3.89864 0.2963 0.5556 0.14815

0.25674 0.34146 0.4878 0.1707

250 KG/CM2

4.47928 0.29787 0.5532 0.14894

0.31898 0.30303 0.54545 0.1515

300 KG/CM2

5.6899 0.27027 0.5946 0.13514

0.2193 0.33333

GRAVA
M3

0.5

AGUA
M3

AGUA
M3

0.15

RCIONAMIENTO PARA FABRICAION DE CONCRETO

UAL TECNICO DE CONSTRUCCION APASCO

NAMIENTO PARA 1 M3 DE CONCRETO TAM= 40MM

CONCRETO

CEMENTO ARENA
BULTO
M3

GRAVA
M3

AGUA
M3

0.38

100 KG/CM2

0.1425 0.1805

150 KG/CM2

0.1045 0.1615 0.0475

200 KG/CM2

250 KG/CM2

0.0665 0.1235 0.03325 0.223

300 KG/CM2

0.0475 0.1045 0.02375 0.176

0.076 0.1425

0.057

DE M3

0.038

1 BOTE= 19 LITROS
1 BULTO= 50KG

CONCRETO

CEMENTO ARENA
TON
M3

100 KG/CM2 0.13158

0.375

GRAVA
M3

0.475

AGUA
M3

0.15

150 KG/CM2 0.15949

0.3333 0.5152 0.15152

200 KG/CM2 0.19493

0.2963 0.5556 0.14815

250 KG/CM2 0.22396

0.2979 0.5532 0.14894

300 KG/CM2

0.2845 0.2703 0.5946 0.13514

0.314
0.257

DOSIFICACION PARA MORTEROS PARA FABRICAR 1 M3 DE MEZCLA


MORTERO: MORTERO MAESTRO-ARENA
DOSIFICACION
1A4
1A5
1A6

MORTERO (TON)
0.3
0.26
0.225

DOSIFICACION
1A2
1A3
1A4
1A5
1A6

CEMENTO (TON)
0.6
0.51
0.43
0.36
0.3

ARENA (M3)
1.15
1.2
1.24

MORTERO: CEMENTO-ARENA
ARENA (M3)
1
1.05
1.1
1.15
1.17

AR 1 M3 DE MEZCLA

RO-ARENA
AGUA (M3)
0.29
0.285
0.28

RENA
AGUA (M3)
0.275
0.272
0.266
0.261
0.257