As part of design procedure, a Hazard and Operability(HAZOP) workshop for UOPs HC Unibon Process Unit 211/212 has been carried out. The HAZOP was carried out at SK Corps office in Ulsan, Korea(from 21st to 22nd in February 2007). An independent chairman and scribe were provided for HAZOP by Chars Tech Engineering & Consulting Co.Ltd. Refer to separate binder for HAZOP Report.