HARIDWAR INFRASTRUCTURE LTD

No of Units
Sl No

Description

LP AIR COMPRESSOR FOR SHAFT SEAL (UNIT-1 & 2)

2
3

DEWATERING PUMP (Main & stand by)


DRAINAGE PUMP (Main & stand by)

OIL WATER SUMP/DRAINAGE PUMP(unit -1 & 2)

6
7

Sewage Pump
Fire pump(Main & standby)
PRIMARY CKT. COOLING WATER PUMP
(Main,stand by & Common)
Secondary CKT. COOLING WATER PUMP
(Main,stand by & Common)

8
9
10

BACK WASH FILTER FOR SHAFT SEAL(Main & Stand by)

11

CYCLONE SEPARATOR FOR SHAFT SEAL(Main & Stand by)

12

17
18
19
20
21
22
23

PRIMARY CKT. DUPLEX FILTER (unit -1 & 2)


PRIMARY CKT. HEAT EX. I/L
MOTORIZED VALVE (Main,stand by & Common)
Secondary CKT. HEAT EX. I/L
MOTORIZED VALVE (Main,stand by & Common)
Secondary CKT. HEAT EX. I/L
MOTORIZED VALVE (Main,stand by & Common)
CYCLONE SEPARATOR CKT.
MOTORIZED VALVE-1 FOR UNIT-1
SHAFT SEAL PUMP(Main & Standby)
HEAD COVER PUMPS 1,2 (Main & stand by)
GOVERNING/MIV PUMP
GOVERNING/MIV JOCKEY PUMP
HIGH PRESSURE OIL INJECTION PUMP
ROTOR LIFTING PLANT
OIL MIST EXH. SYSTEM

24

CARBON / BRAKE DUST EX. SYSTEM-1&2 ( Main & stand by)

25

GENERATOR BRAKING SYSTEM(Main & Stand by)

26
27
28
29
34
35
36
39

MLDB
Substation Board
220V Battery Charger(1 & 2)
Inverter system(isolation transformer 1 &2)
HVAC FAN STARTER PANEL(fresh air)
HVAC FAN STARTER PANEL(Return air)
EXHAUST AIR /SMOKE FAN STARTER PANEL
SPACE HEATERS FOR GENERATOR

13
14
15
16

40
41

EXCITATION FIELD FLASHING


GSU TRF, MARSHALING BOX-UNIT-1
Total
Installed load
Start up load
Considering 5% margin for Installed load
Considering 5% margin for start up load

DIKCHU HEP

Rating in Kw

Units per
Machine

Total Units
for Power
House

Total Installed
Load
in kW

Start up Load
in Kw

15.00

1.00

2.00

30.00

15.00

37.00
30.00

1.00
1.00

2.00
2.00

74.00
59.99

37.00
30.00

22.00

1.00

2.00

44.00

22.00

18.50
40.00

1.00
1.00

2.00
2.00

37.00
80.00

18.50
40.00

45.00

1.00

3.00

135.00

45.00

75.00

1.00

3.00

225.01

75.00

2.00

2.00

4.00

8.00

4.00

1.50

2.00

4.00

6.00

3.00

1.00

1.00

2.00

2.00

1.00

0.25

1.00

3.00

0.76

0.25

0.25

1.00

3.00

0.76

0.25

0.25

1.00

3.00

0.76

0.25

0.25

2.00

4.00

1.01

0.51

9.30
3.70
37.00
5.50
7.50
3.70
0.37

2.00
2.00
2.00
1.00
1.00
1.00
1.00

4.00
4.00
4.00
2.00
2.00
2.00
2.00

37.18
14.80
148.01
11.00
14.99
7.40
0.75

18.59
7.40
74.00
5.50
7.50
3.70
0.37

0.37

2.00

4.00

1.49

0.75

5.50

2.00

4.00

21.99

11.00

175.00
130.00
32.00
25.00
180.00
111.00
66.00
11.00

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

1.00
1.00
2.00
2.00
1.00
1.00
1.00
2.00

175.00
130.00
64.01
50.00
180.00
111.00
66.00
21.99

43.75
65.00
64.01
25.00
180.00
111.00
66.00
21.99

stalled load
art up load

5.00
12.00

1.00
1.00

2.00
2.00
CURRENT
2924
KVA
1289
KVA
3070
kVA
1354
kVA

10.00
23.99
2339.36

10.00
23.99
1031.30
1793.4933707

Emergency Load on DG Set


15.00
37.00
30.00
22.00
18.50
40.00
45.00
75.00
4.00
3.00
1.00
0.25
0.25
0.25
0.51
18.59
7.40
74.00
5.50
7.50
3.70
0.37
0.75
11.00
43.75
65.00
64.01
25.00
180.00
111.00
66.00
21.99

10.00
23.99
1031.30
1793.4933707115