Area A

Area B

June 26

June 29July 3

Ground
Floor
Foundation
Second Floor
Beam and
Slab

July 11

Second Floor
Column
Second
Floor Beam
and Slab

July 15

July 17

Third Floor
Beam and
Slab

Balance

Plan
651.96 m

235.588 m

18.80 m

328.36 m

101.974 m

37.6 m

130.37 m

Remaining
309.56 m
92.77 m

28.4 m

Ground
Floor
Column

July 8

Actual
342.4 m

123.22 m
55.58 m

150.4 m

178.8 m

35.52 m

56.4 m

179.62 m

220.636 m

75.2 m

219.3 m

322.61 m

144.1 m