Académique Documents
Professionnel Documents
Culture Documents
Movement of Material that 1.Multiple Storage Locations 1.Lack of Visual 1.Level schedule
not directly support a lean Controls
Conveyance Manufacturing system. 2.Complex Inventory Management 2.Proper facility
2.Large Lot
3.Incorrect Inventory Counts Processing
1.Long Lead Time for Engineering 1.Incapable Suppliers 1.Adjust the production with
Excess supply of raw Changes demand
Inventory material to produce products 2.Long Change Over
just in time 2.Additional Material Handling Times
Resources