Vous êtes sur la page 1sur 30

PRESENTATION

PROPOSED

4000 MW ULTRA MEGA POWER PROJECT


AT

KAKWARA, BANKA DISTRICT, BIHAR


FOR

APPOINTMENT OF TECHNICAL CONSULTANT


FOR

SITE FEASIBILITY STUDY, ACQUISITION OF LAND,


CONDUCTING VARIOUS TECHNICAL STUDIES AND
OBTAINING CLEARANCES
BIDDER

DESEIN PRIVATE LIMITED

Consulting Engineers, Desein House, Greater Kailash II, New Delhi 110 048
Phone No. : 91-11-41891400, 29213762, Fax No. : 91-11-29218393, 29219566
E-mail : info@desein.com, Web site : www.desein.com

DATE : 13TH JULY, 2015

TIME : 15:00 hrs (IST) ONWARD

CAPACITY
DESEIN IS INDIAS LEADING ENGINEERING POWER
PLANT CONSULTANCY WITH TRACK RECORD OF 50 YEARS.
DESEIN PROVIDES TOTAL ENGINEERING, PROCUREMENT,
CONSTRUCTION & COMMISSIONING SUPERVISION FOR
UNIT SIZE UTO 800 MW FOR BOTH SUPER-CRITICAL &
SUB-CRITICAL.
POWER PLANT DESIGN IS DRIVEN BY ITS EXPERTISE &
EXPERIENCE
OF
THE
THERMAL
CYCLE.
DESEIN
CONCEPTUALIZES THE COMPLETE LIFE CYCLE OF THE
PROJECT- PROJECT FEASIBILITY, DETAILED ENGINEERING,
OPERATION & MAINTENANCE AND RENOVATION &
MODERNIZATION.
DESEIN HAS WORKED ON DIFFERENT FUELS SUCH AS
COAL,
GAS,
LIGNITE,
WASHERY
REJECTS
AND
RENEWABLES.
2

CAPACITY
Contd

A SINGLE WINDOW SERVICE PROVIDER TO POWER


UTILITIES

DRAWING MANAGEMENT SYSTEM PROVIDING ARCHIVAL,


STORAGE & MANAGEMENT OF DRAWINGS

LATEST
COMMUNICATION
FACILITIES
FOR
CORRESPONDENCE, TRANSFER OF TECHNICAL DATA
AND DRAWINGS ETC.

ISO 9001:2008 CERTIFIED COMPANY SINCE 2004,


CERTIFICATE NO. 10692 DATE 06.12.2013,
CIN: U74899DL1970PTC005474

ACCREDITED WITH: QCI-NABET VIDE MoEF, O.M. No. J11013/77/2004-IA II (I) DATED 30.09.2011 FOR CAT.
A, UNDER S.No. 15 OF LIST A

STRENGTHS
EXTENSIVE DOMESTIC AND INTERNATIONAL EXPERIENCE
ENGINEERING,
PROCUREMENT & CONSTRUCTION CAPABILITIES
TURNKEY ASSIGNMENTS FOR CONSORTIUM
LARGE MULTI-DISCIPLINARY INFRASTRUCTURE PROJECTS
GLOBAL STRATEGIC ALLIANCES
STRONG TEAM SKILLS IN ALL DISCIPLINES
ENVIRONMENT

INCLUDING

REGISTERED WITH VARIOUS NATIONAL AND INTERNATIONAL


AGENCIES
MODERN ENGINEERING OFFICE WITH LATEST FACILITIES

WORK ENVIRONMENT
EQUIPPED WITH STATE-OF-THE-ART MAIN SOFTWARE TOOLS SUCH AS:

PDS
PDMS
AUTOPLANT
SOLIDWORKS 2010
REVIT STRUCTURALS
CIVIL 3D
CAESAR II
GT PRO / GT MASTER
ISC ST3
AERMOD
PRIMAVERA

STAAD PRO

SECTION WIZARD

CAD RC

MAP GUIDE

NISA

AUTO CAD 2015

MICRO STATION

MS Office

STAAD PRO V8i

STEAM PRO / STEAM MASTER

LIBSYS

SB SLOPE 3

DOC IMAGE SOFTWARE FOR DOCUMENT MANAGEMENT


LOTUS NOTES FOR MESSAGING / MAILING
INTEGRATION OF WORK THROUGH LOCAL AREA NETWORK
EACH DISCIPLINE EQUIPPED WITH REQUISITE SOFTWARE TOOLS
5

SERVICES: CONCEPT TO COMMISSIONING


NEW POWER PROJECTS

Feasibility Studies
Detailed Project Reports
Environmental Impact Studies
Design & Detailed Engineering
Total Engineering Consultancy
(Concept To Commissioning)
CONSTRUCTION OF POWER PLANTS

Turnkey Contracting
Engineering, Procurement &

INDEPENDENT POWER PROJECTS


Identifying New Opportunities
Bidding For Private Projects
Handling All Aspects of Private
Power Projects,
Including
Approvals
From
Various
Statutory Bodies
Procurement Support
Project Monitoring
Financial Structuring

Construction

POST-COMMISSIONING SERVICES

SERVICES FOR OLD PLANTS

Operation & Maintenance

Life Extension Studies

Training & Placement

Renovation & Modernization

Technical Man Power

Effluent Treatment
6

ROLE IN POWER SECTOR


ENVIRONMENTAL IMPACT ASSESSMENT STUDIES FOR
MORE THAN 80 PROJECTS 60,379 MW
COMPLETE ENGINEERING FOR MORE THAN 35,224 MW
UP TO 800 MW UNIT CAPACITY
FEASIBILITY

REPORT/DETAILED

PROJECT

REPORT

FOR MORE THAN 209 PROJECTS 1,11,941 MW


EPC CONTRACTING FOR 5 MAJOR PROJECTS (250 MW
to 660 MW)
OPERATION

&

MAINTENANCE

FOR

20

POWER

PROJECTS
7

EMPANELLMENT

ACCREDITATION (QCI/NABET)

PROJECTS HANDLED/ COMPLETED


SUPERCRITICAL PROJECTS (2005-06 ONWARDS)
S.No.

Client

Assignments
/ Projects

Major Study Components/ Features

ToR/NoC
EC
Obtained Obtained

1.

PFC Ltd. 4000 MW


Sasan UMPP
(Madhya
Pradesh)

Feasibility Report, Project Report 15.06.06


(Bankable),
EIA
Studies,
Topographical
Survey,
Area
Drainage Study, Socio-Economic
Survey
and
Geo-Technical
Investigation

23.11.06

PFC Ltd. 4000 MW


Feasibility Report, Project Report 20.03.07
Tilaiya UMPP (Bankable), EIA and SIA Studies,
Area
(Jharkhand) Topographical Survey,
Drainage Study and Geo-Technical
Investigation.

07.04.08

3.

PFC
Consulting Ltd.

11.07.08

1980 (3x660)
MW Talwandi
Sabo TPP
(Punjab)

Feasibility Report, Project Report 14.12.07


(Bankable), EIA and SIA Studies,
Topographical Survey,
Area
Drainage Study and Geo-Technical
Investigation.

10

PROJECTS HANDLED/ COMPLETED


SUPERCRITICAL PROJECTS
Assignments
/ Projects

Contd

ToR
EC
Obtained Obtained
Feasibility Report, Project Report 20.05.09 Recomm
&
-ended
(Bankable), EIA and SIA Studies,
Topographical Survey, Area Drainage 08.11.12 for EC
by EAC
Study
and
Geo-Technical
Investigation.

S.No.

Client

Major Study Components/ Features

4.

PFC
Consulting Ltd.

4000 MW
Odisha
UMPP
(Odisha )

5.

PFC
Consulting Ltd.

1320 (2x660)
MW Rajpura
TPP
(Punjab)

6.

MAHAGENCO

3300 (5x660) EIA Studies and


Report
MW
Dondaicha
TPP
(Maharashtra)

Feasibility Report, Project Report 10.04.08


(Bankable), EIA and SIA Studies,
Topographical Survey,
Area
Drainage Study and Geo-Technical
Investigation.

03.10.08

Detailed Project 13.05.11 Awaiting


&
Coal
03.12.13 block
reallocation
11

COMPOSITION OF TEAM
TEAM LEADER (TL) / TEAM MEMBERS (TM) TO BE DEPLOYED

S.N
o.

Name

Designati Qualificatio
on
n

Area of
Specialization

Position/
Experienc
e

Consulta B.E.
nt
(Mech.)

Feasibility
Report &
Detailed Project
Report

TL /
42Yrs

Dr. P. C.
2.
Jha

Executiv
e
Director

Environment
Management

TM / 30
Yrs.

Mr. S.
3.
Das

Executiv
e
Director

Mechanical
Engg. Boiler&
Air Pollution

TM / 36
Yrs.

1.

Mr. P.
Dutt

4.

Mr. S. K.
Dandona

5.

Mr. K. K.
Singh

Ph.D
(Ecology)
M.Tech
(Thermal
Engg.)

Consulta
Electrical Engg.
B.E. (Elec.)
nt
Executiv Mineral
e
Engg.
Mineral Engg.
Director
& MBA

TM / 53
Yrs.
TM / 37
Yrs.
12

COMPOSITION OF TEAM
TEAM LEADER (TL) / TEAM MEMBERS (TM) TO BE DEPLOYED
contd...
S.N
Position/

o.

Name

Designati Qualificatio
on
n

9. Mr.
Mukesh
K.
Sharma

Manager PGD
(Ecology &
Environmen
t)
Sr.
B. Tech.
10. Mr. N. Ali
Manager (Civil)
Sr.
Mr.
B.E.
11.
Engineer
C.Mishra
(Mech.)
.
12.
B. E.
Mr. D.
Consulta
(Metallurgy
Dasgupta nt
)
13.

Mr. S. C.
Jain

14. Dr. P. G.

Consulta AMIE
nt
(Chem.)
Consulta Ph.D (Ag.

Area of
Specialization

Experienc
e

Environment
Management

TM / 27
Yrs.

Civil related
activities

TM / 13
Yrs.

DPR & Power


Tarif

TM / 9
Yrs.

Environmental
Enginnering
Water System/
Waste
Management
Landuse/ Soil

TM / 50
Yrs.
TM / 49
Yrs.
TM / 50

13

SITE LOCATION MAP

14

SCOPE OF WORK
PROPONENT
BIDDER

ACQUISITION OF LAND AND


TECHNICAL STUDIES (PLANT,
TOWNSHIP, ASH DISPOSAL AND
VARIOUS CORRIDORS)

SITE MOBILISATION,
PFR & FORM-1,
ToR FROM MoEF&CC
BASELINE DATA GENERATION
TOPOGRAPHICAL SURVEY
AREA DRAINAGE STUDY
GEO-TECHNICAL INVESTIGATION,
SOCIO-ECONOMIC STUDY
PROJECT INFORMATION REPORT
EIA STUDIES
DETAILED PROJECT REPORT,
LAND ACQUISITION
COMPREHENSIVE SIA, R&R PLAN AND
CSR PLAN

STATUTORY CLEARANCES
(AS APPLICABLE)

GTS BENCH MARK


AIRPORTS AUTHORITY OF INDIA
MINISTRY OF DEFENCE
ARCHAEOLOGICAL SURVEY OF INDIA
MINERALOGICAL MAP
SATELLITE IMAGERY
NHAI/SH FOR APPROACH ROAD
GRAM SABHA
CHANGE IN LANDUSE
PUBLIC HEARING
ENVIRONMENTAL CLEARANCE
FOREST CLEARANCE Stage -I

15

TOOLS & TECHNIQUES

DETAIL STUDIES WITHIN SCOPE OF WORK WILL


BE
CARRIED
OUT
AS
PER
TECHNICAL
SPECIFICATIONS.
BASED ON DATA/INFORMATION COLLECTED, A
SITE SELECTION MATRIX WILL BE PREPARED.
RANKING OF ALL POTENTIAL SITES WILL
FOLLOW
SUIT
FOR
THE
PURPOSE
OF
EVALUATION.
MAJOR SETTLEMENTS, HOUSEHOLD NUMBERS,
LAND USE CATEGORIES AS PER REVENUE DATA
AND EXISTING INDUSTRIES WILL BE INCLUDED
IN ASSESSMENT.
A PRE-FEASIBILITY REPORT CONTAINING SITE
SELECTION,
BRIEF
PROJECT
DETAILS
AND
ENVIRONMENTAL CONCERNS.
16

ASSIGNMENT EXECUTION SEQUENCE


TASK 100

KICK- OFF MEETING WITH PFCCL:

OBTAINING SITE DETAILS AND ALTERNATE SITES IDENTIFIED


OBTAINING REPORTS/ DOCUMENTS AVAILABLE WITH CLIENT
DETAILING WORK PLAN
DEPLOYMENT SCHEDULE

AND

INCLUDING

BROAD

RECONNAISSANCE SURVEY OF SITE, SURROUNDING


AREAS, ALTERNATE SITES, WATER AND OTHER CORRIDORS
IN TERMS OF TECHNICAL, ENVIRONMENTAL AND SOCIAL
ASPECTS.
THE STUDY AREA WILL COVER BOTH CORE AND BUFFER
ZONES AROUND THE PROJECT SITE(S).

17

ASSIGNMENT EXECUTION SEQUENCE


TASK 100

KICK- OFF MEETING WITH PFCCL:

Contd

COLLECTION OF SECONDARY DATA ON LAND USE


PATTERN, SETTLEMENTS, ROAD/RAIL CONNECTIVITY,
METEOROLOGY, GEOLOGY, CENSUS DATA ETC.
PRELIMINARY DISCUSSION WITH LOCAL OFFICIALS
AND PEOPLE ON THE PROPOSED PROJECT AND ITS
IMPLICATION AT THE LOCAL AND DISTRICT LEVELS.
PREPARATION OF PRE-FEASIBILITY REPORT
FORM-1
AND
SUBMISSION
TO
MOEF&CC
OBTAINING TOR.

AND
FOR

18

ASSIGNMENT EXECUTION SEQUENCE


TASK 200

BASELINE STUDY

SITE SURVEY AND PREPARATION OF LAYOUT FOR POWER


PLANT AND VARIOUS CORRIDORS:
ENVIRONMENTAL MONITORING (METEOROLOGY, AIR,
SURFACE & GROUND WATER, NOISE, SOIL ETC.)
SOCIO ECONOMIC SURVEY
LAND USE PATTERN, DETAILS OF LAND OWNERSHIP ETC.
TOPOGRAPHICAL SURVEY
AREA DRAINAGE STUDY
GEO- TECHNICAL SURVEY, SOIL INVESTIGATION ETC.
ECOLOGICAL AND OTHER RELEVANT STUDIES.
THE ABOVE STUDIES WILL BE CARRIED OUT AT THE POWER
PLANT SITE AND ITS VARIOUS CORRIDORS.
A SECOND TEAM WILL CARRY OUT STUDY OF THE COAL
BLOCK(S) LAND AS PER DETAILS PROVIDED BY THE CLIENT.
MEANWHILE SATELLITE IMAGERY OF PROJECT SITE AND
COAL BLOCK SITE WILL BE PROCURED.
19

ASSIGNMENT EXECUTION SEQUENCE


TASK 300

LAND ACQUISITION PLAN (PROJECT SITE)

PREPARATION AND SUBMISSION OF LAND ACQUISITION


APPLICATION FOR:
POWER PLANT AND CORRIDORS FOR WATER AND ASH
PIPELINE, SERVICE/APPROACH ROADS ETC.
SUBMISSION TO DISTRICT ADMINISTRATION FOR
NOTIFICATION OF SECTION-11 UNDER-RIGHT TO FAIR
COMPENSATION
AND
TRANSPARENCY
IN
LAND
ACQUISITION, REHABILITATION AND RESETTLEMENT
ACT, 2013.

20

ASSIGNMENT EXECUTION SEQUENCE


TASK 400

COAL BLOCK(S) LAND IDENTIFICATION

PROCUREMENT OF DOCUMENT OF THE TOTAL CAPTIVE


COAL BLOCK(S) LAND
TO IDENTIFY COAL BLOCK(S) LAND HAVING SUFFICIENT
COAL TO LAST AT LEAST 5 YEARS FROM THE COD OF 1ST
UNIT AT NORMATIVE CAPACITY, AND
TO PROCURE ITS DECLARATION FROM THE CENTRAL
GOVERNMENT
UNDER
SECTION-9
OF
THE
CBA
(ACQUISITION & DEVELOPMENT) ACT 1957

21

ASSIGNMENT EXECUTION SEQUENCE


TASK 500

RAIL CORRIDOR STUDY (COAL TRANSPORT)

FEASIBILITY STUDY FOR TRANSPORTATION OF COAL


BY RAIL FROM THE CAPTIVE COAL BLOCK(S), WILL
BE UNDERTAKEN.
AFTER SELECTION OF RAIL CORRIDOR, TO SUBMIT
APPLICATION FOR LAND ACQUISITION TO DISTRICT
ADMINISTRATION
FOR
NOTIFICATION
UNDER
SECTION-11
UNDER
LAND
ACQUISITION,
REHABILITATION AND RESETTLEMENT ACT, 2013

22

ASSIGNMENT EXECUTION SEQUENCE


TASK 600

FOREST CLEARANCE

FOR ANY FOREST LAND IN THE AREA, STUDY WILL BE


CARRIED OUT IN CONSULTATION WITH THE CONCERNED
DFO AND OTHER FOREST OFFICIALS, AS REQUIRED
UNDER THE FOREST CONSERVATION ACT,1980.
FOREST DIVERSION PROPOSAL WILL BE PREPARED FOR
ONLINE SUBMISSION TO THE FOREST DEPARTMENT.

23

ASSIGNMENT EXECUTION SEQUENCE


TASK 700

DRAFT RAPID EIA/EMP REPORT

PREPARATION OF PROJECT INFORMATION REPORT ON


COMPLETION OF SURVEY WORK.
AFTER ONE- SEASON BASELINE STUDY AND ASSESSMENT
OF POTENTIAL ENVIRONMENTAL AND SOCIAL IMPACTS
OF THE PROPOSED UMPP RAPID EIA AND EMP REPORT
WILL BE SUBMITTED TO THE SPCB FOR PUBLIC HEARING.
THE STUDY WILL COVER POWER PLANT LAND, ASH AND
WATER PIPELINE CORRIDORS AND FUEL TRANSPORTATION
CORRIDORS.
A COMPREHENSIVE SIA, R&R PLAN AND CSR PLAN WILL
ALSO BE PREPARED AND SUBMITTED.
24

ASSIGNMENT EXECUTION SEQUENCE


TASK 800

PUBLIC HEARING

ASSISTANCE WILL BE PROVIDED TO THE CLIENT IN


CONDUCTING PUBLIC HEARING
BASED ON OBSERVATION/SUGGESTION IN THE PUBLIC
HEARING THE DRAFT EIA REPORT WILL BE FINALISED
FOR SUBMISSION TO MOEF & CC
TASK 900

COMPREHENSIVE EIA, SIA ETC.

AFTER FIELD MONITORING FOR THREE SEASONS A


COMPREHENSIVE EIA REPORT WILL BE PREPARED
ALONG WITH A CUMULATIVE IMPACT ASSESSMENT
REPORT, IF REQUIRED.

25

ASSIGNMENT EXECUTION SEQUENCE


TASK 1000

DETAILED PROJECT REPORT

THE POWER ENGINEERS OF THE STUDY TEAM WILL


WORK OUT VARIOUS OPTIONS IN CONSULTATION WITH
THE CLIENT AND FINALISE THE PROJECT COMPONENTS.
DETAILED PROJECT REPORT (DPR) WILL
PREPARED AND SUBMITTED TO THE CLIENT.

THEN

BE

THE DPR WILL PROVIDE TARIFF CALCULATION, LOANEQUITY RATIO, IRR, IDC ETC. TO ESTABLISH THE
VIABILITY OF THE PROJECT.
TASK 1100

ENVIRONMENTAL CLEARANCE

AFTER OBTAINING OTHER STATUTORY CLEARANCES THE


EIA / EMP REPORT WILL BE SUBMITTED TO MOEF & CC.
PRESENTATION BEFORE THE EAC WILL BE MADE FOR
OBTAINING ENVIRONMENTAL CLEARANCE.
26

ASSIGNMENT EXECUTION SEQUENCE


TASK 1200

PROJECT & COAL BLOCK(S) LAND ALLOCATION

OBTAINING AWARD OF THE POWER PLANT, CORRIDORS,


APPROACH ROADS ETC. IN FAVOUR OF THE SPV UNDER
SECTION-19 AND SECTION-23 OF L.A AND R&R ACT, 2013,
OR UNDER ANY OTHER RELEVANT ACT.
PROCURING DECLARATIONS OF THE GOVT. UNDER SECTION9 OF CBA (ACQUISITION & DEVELOPMENT) ACT 1957, FOR
THE CAPTIVE COAL BLOCK(S) LAND TO OPERATE THE POWER
STATION FOR AT LEAST FIVE YEARS FROM THE COD OF 1ST
UNIT AT NORMATIVE AVAILABILITY.
27

EXECUTION PLAN
AFTER THE KICK-OFF MEETING WORK PLAN WILL BE
FINALISED.
ARRANGEMENTS
WILL
BE
MADE
FOR
RECONNAISSANCE SURVEY AS WELL AS OPENING
OF SITE OFFICE AT KAKWARA OR BANKA IN
CONSULTATION WITH PFCCL.
PLANNING AND MANAGEMENT OF OPERATIONS WILL
BE CARRIED OUT FROM THE HEAD OFFICE IN DELHI.
FOR THE TASKS IDENTIFIED SEPARATE TEAMS WILL
BE DEPLOYED WITH TIME- FRAMES TO COMPLETE
THEM.
28

EXECUTION PLAN
Contd
MONITORING AND SURVEY DATA GENERATED AND
SECONDARY DATA COLLECTED WILL BE COLLATED
AND ANALYSED IN DELHI.
DOCUMENTATION AND GENERATION OF VARIOUS
DRAWINGS, MAPS, REPORTS WILL TAKE PLACE IN
DELHI.
ALL THROUGH THE STUDY, THE TEAM LEADER/
MEMBERS WILL HAVE REGULAR INTERACTION WITH
THE
PFCCL
TO
ENSURE
THAT
THE
STUDY
PROGRESSES AS PER THE PLAN FOR TIMELY
COMPLETION.

29

DESEIN PRIVATE LIMITED

Thank You

30

Vous aimerez peut-être aussi