Vous êtes sur la page 1sur 1
Woe] F al zaae ea ey te BAANRABSA Applicable Code Atesnces WELDING PROCEDURE SPECIFICATION ASME 1, 831.1 8 1X neReS wh SAS =m WPS No. AcM.0606-824 Date __2007.0502 _Rev.No.__0 Dato wena ISupporting POR No.s) QA-TM.0408-008, legwe aa 35 ane WS 7 Atfanwal_COSemi-Aulo Auto Machine [2g 71 POSTWELD HEAT TREATMENTIOW-407 z= wat) N Temp, Range one aera None ALL GROOVES & FILLETS SER Eamon ase. jo Rae 2 _—_— [= BASE METAL(QW-403) DISA TECHNIOUETGW 410 PANO 4 GrNo, 1.2 ‘0P-No_6 Gr.No_12 | ep ea Ss SRA ae yA 29) Wa or Spee and. __sacnrcnit sanattorea | Gin atin Gaeta lems iat] © hee ae Thick Rennsten Contact Tuba to Work Distancetmmmy _N’A 24 5-16 as WA Base Metal Groove {S09 Nolo 2). Filet __unimteg | Osciation 8 ocied Wold ee Upto 16(Se0hot0 2) | {HRS Re te aa a Deposited Weld Metat Groove SiiaererWeneGeag Stings, i Wene age wag ae aeoig Filet ___Troativi::upin 13} Meted of clearing EI Brushing Borne Srna aad a ga ae cs cs Pins Dia (nm) limites SraiorMil Ewcrode = Shale Nut, Ray ha 5 aed eeteee gases Taide Max. Thick per Passion) 5 Methed of Back BIATAr Gong — &Ginding [iz_M PoSiON(GW.405 Ge ae caeag) ae es Mult or Single Passioe sido) Muth RE Siglo zi og 28 2 Positonis) Grove___al Filet __at_| Paring aver Bho Salhh OMe s, ae Se ee Nua Progression efVerical Positon Up C0 _| Usp of Thermal Procossos AME I= 83) FILLERELECTSO fawn (by Qasaa ge om ee WA Proneat Tema. tAn. 20/004 lal Transfor Mode for GMAWIFCAW Sor Bae @5(t) gad dae Stig) 39) WA interpass Temp. Msc ww ‘Tungsten Electrode Type and Size agen gona eue 8a NA Pronest Maintenance None Flux & Fix Type ze ways WA Ohare None Supp Powder Fler aus | oe SIV Filer Mata SH CurentPolaity [GSA] ENA] TT Layer | Process [FNOT ASFA] = [SH] Sa | gHosa] Vol tw.speed) Other No, No. | No. | AWS Class |Size(mm)} Type Amp. Range | Range | fem/min.) fat TE SMA | aS] SIT] ENCES | Saw | DORE | EET Ra] SS bal. NOTE F) I. This WPS sail aot he applied where impact ests reqared 2. ASME: Upto 6am, ASME BR. I : Upto [3mm A Fa tyra PH Ape omg to Reviewed by HVE Team” | Approved by HVE Team Manager ‘General Manager Doosan Heavy Industries & Construction Co,, Lid.

Vous aimerez peut-être aussi