ESTRUCTURAS

VIGAS

LOSAS

COLUMNAS
VIGAS CIMENTACION
ZAPATAS

PLACAS

TECHO METALICO
ARRIOSTRES METALICOS
BANDAS DE CONTRACCIN EN ENCOFRADOS
CAJA DE ASCENSORES
MOV. DE TIERRAS

ESCALERAS

MURO PANTALLA

SOTANO 3
SOTANO 2
SOTANO 1
SEMISOTANO
PISO 1
PISO 2
PISO 3
PISO 4
SOTANO 3
SOTANO 2
SOTANO 1
SEMISOTANO
PISO 1
PISO 2
PISO 3
PISO 4
TODOS LOS NIVELES
SUB-BASE
SUB-BASE
SOTANO 3
SOTANO 2
SOTANO 1
SEMISOTANO
PISO 1
PISO 2
PISO 3
PISO 4
COBERTURA
NIVELES EN GENERAL
TODOS LOS NIVELES
GENERAL
#1
#2
#3
#4
#5
#6
#7
GENERAL

ENCARGADO
FER
----JORGE
JORGE
JEAN
PERCY
---

10-Aug
10%
----80.00%
--10.00%
10.00%
---

ENTREGA
ANTERIOR

100.00%

JEAN
PERCY
PERCY
FER
PERCY

100.00%
100.00%
100.00%
100.00%
100.00%

HILTON
HILTON
--------------------------------------FER

---------------------------------------

11-Aug
30% ----------95% --5% --20% --25% ------100.00%

AVANCE
12-Aug

13-Aug
-----------------

100.00%

100% --100% --100% --100% --100% --POR DEFINIR


10%
20% --100%
100% ------------------------------------------POR DEFINIR
------------------------------------100%
100%
---

14-Aug
-----------------

100.00%

100.00%

-----------

-----------

-------------------------

-------------------------

-------------------

---------------------

---

15-Aug

17-Aug

18-Aug

19-Aug

20-Aug

21-Aug

ESTRUCTURAS

VIGAS

LOSAS

COLUMNAS
VIGAS CIMENTACION
ZAPATAS

PLACAS

TECHO METALICO
ARRIOSTRES METALICOS
BANDAS DE CONTRACCIN EN ENCOFRADOS
CAJA DE ASCENSORES
MOV. DE TIERRAS

ESCALERAS

MURO PANTALLA

SOTANO 3
SOTANO 2
SOTANO 1
SEMISOTANO
PISO 1
PISO 2
PISO 3
PISO 4
SOTANO 3
SOTANO 2
SOTANO 1
SEMISOTANO
PISO 1
PISO 2
PISO 3
PISO 4
TODOS LOS NIVELES
SUB-BASE
SUB-BASE
SOTANO 3
SOTANO 2
SOTANO 1
SEMISOTANO
PISO 1
PISO 2
PISO 3
PISO 4
COBERTURA
NIVELES EN GENERAL
TODOS LOS NIVELES
GENERAL
#1
#2
#3
#4
#5
#6
#7
GENERAL

ENCARGADO
FER
FER
--JORGE
JORGE
JEAN
PERCY
---

14-Aug
15-Aug
100%
100% ------95.00%
30.00%
70.00%
55.00%
-----

ENTREGA
ANTERIOR

100.00%

JEAN
PERCY
PERCY
FER/MARCO
PERCY

100.00%
100.00%
100.00%
70.00%
100.00%

HILTON
HILTON
--------------------------------------FER

---------------------------------------

100.00%

AVANCE
16-Aug
-----------------

17-Aug
-----------------

100.00%

----------POR DEFINIR
100%
----100%
--------------------------------------------POR DEFINIR
------------------------------------100%
100%
---

100.00%
-------------------------------------------------------

18-Aug
----------------100.00%
-------------------------------------------------------

19-Aug

20-Aug

21-Aug

22-Aug

23-Aug

24-Aug

REVISION PLANOS

MARCO SARMIENTO

BRYAN ASTETE

PERCY ROMERO

FERNANDO COLLANTES

E-09, E-10 PLANTA DE CIMENTACIN (SECTORES 1 Y 2)_REV_03


E-11 DETALLES DE CIMENTACIN_REV_02
E-100, E-200 ENCOFRADO DE TECHO 3ER STANO (SECTORES 1 Y 2)_REV_07
E-101, E-201 ENCOFRADO DE TECHO 2DO STANO (SECTORES 1 Y 2)_REV_07
E-102,
E-103,
E-104,
E-105,

E-202
E-203
E-204
E-205

ENCOFRADO
ENCOFRADO
ENCOFRADO
ENCOFRADO

DE
DE
DE
DE

TECHO
TECHO
TECHO
TECHO

1ER STANO (SECTORES 1 Y 2)_REV_07


SEMISTANO (SECTORES 1 Y 2)_REV_08
1ER PISO (SECTORES 1, 2A Y 2B)_REV_05
2DO PISO (SECTORES 1 Y 2)_REV_04

E-106, E-206 ENCOFRADO DE TECHO 3ER PISO (SECTORES 1 Y 2)_REV_04


E-107, E-207 ENCOFRADO DE TECHO 4TO PISO (SECTORES 1 Y 2)_REV_07
E-108 AL E-112 ELEVACIN DE VIGAS DE CONCRETO DE (SECTORES 1)_REV_03
E-113
E-208
E-213
E-218

TECHO METLICO Y DETALLES (SECTOR 1)_REV_01


AL E-212- ELEVACIN DE VIGAS DE CONCRETO STANOS (SECTORES 2)_REV_03
AL E-217- ELEVACIN DE VIGAS DE CONCRETO AEREOS (SECTORES 2)_REV_04
TECHO METLICO Y DETALLES (SECTOR 2)_REV_01

EJES
EJES
EJES
EJES
EJES
EJES
EJES
EJES
EJES
EJES
EJES
EJES
EJES
EJES
EJES
EJES

1-3 Y A-B
6-7 Y A-B
19-20 Y A-B
6-7 Y B-C
2-3 Y C-D
6 Y C-D
6-7 Y D
6-7 Y C-D
8-9 Y C-D
9-10 Y C-D
10-11 Y C-D
11-12 Y C-D
12 Y C-D
14 -15-16-17 Y C-D
1-2 Y D-E
1-2 Y D-E

E-102, E-202 ENCOFRADO DE TECHO 1ER SOTANO (SECTORES 1 Y 2)_REV_06


VE1-2(0.30x0.50)
NO HAY CODIGO DE VIGA
(0.30x0.70)
V1-(0.30x0.70)
SIN CODIGO (0.30x0.70)
SIN CODIGO (0.30x0.70)
SIN CODIGO (0.30x0.70)
SIN VIGAS
SIN CODIGO (0.30x0.70)
SIN CODIGO (0.30x0.70)
SIN CODIGO (0.30x0.70)
SIN CODIGO (0.30x0.70)
SIN CODIGO (0.30x0.70)
SIN CODIGO (0.30x0.70)
V1 - (0.45x0.50) NO ESPECIFICA TIPO DE VIGA
V1 - (0.30x0.70) NO ESPECIFICA TIPO DE VIGA

E-102, E-202 ENCOFRADO DE TECHO 1ER SOTANO (SECTORES 1 Y 2)_REV_07


VE-2(0.30x0.50)
VE-2A(0.30x0.70)
VE6-1(0.30x0.50)
VE-2(0.25x0.50)
SIN CODIGO (0.30x0.70)
SIN CODIGO (0.30x0.70)
SIN CODIGO (0.30x0.70)
AGREGARON DOS VIGAS - VS-26B(0.25x0.60)
SIN CODIGO (0.30x0.70)
SIN CODIGO (0.30x0.70)
SIN CODIGO (0.30x0.70)
SIN CODIGO (0.30x0.70)
SIN CODIGO (0.30x0.70)
SIN CODIGO (0.30x0.70)
V1- (0.45x0.50) NO ESPECIFICA TIPO DE VIGA
V1 - (0.30x0.70) NO ESPECIFICA TIPO DE VIGA