Vous êtes sur la page 1sur 2

C ******COSTO BASE

C ******CLCULO PLATOS REALES*****


EFICIE=0.42
NP=(NSTAGE-2)/EFICIE

C ******CLCULO DE LA ALTURA DE LA COLUMNA*****


C ******SEPARACI PLATO (SP):24 IN
SP=24
H=NP*SP
C *********CLCULO DEL RADIO INTERNO********
RIN=DIAM/2
C MATERIAL DE CONTRUCCIN SA515 GRADO 55
C DENSIDAD (LB/IN3)
C http://www.suppliersonline.com/propertypages/A51555.asp#top
RHO=0.284
C MODULO DEFORMACIN (PSI)
S=13700
C EFICIENCIA DE SOLDADURA
E=0.85
C PRESIN DE OPERACIN
P=(PDOMO+10)/2
C PRESIN DE DISEO
PD=P*1.2
C ESPESOR A LA PRESION DE DISEO
ESP=(P*RIN)/(S*E-0.6*PD)
C ESPESOR A LA PRESION REBOILER
PREB=P+10
ESPREB=(PREB*RIN)/(S*E-0.6*PREB)
C *********** CALCULO DEL PESO DEL MATERIAL DE CONTRS******
PI=3.1416

VIN=(PI*RIN**2*H)
VEXT=(PI*(RIN+ESP)**2*H)
W=RHO*(VEXT-VIN)
C *********** CALCULO COSTO BASE***********
A1=7.123
A2=0.1478*alog(W)
A3=0.02488*(alog(W))**2
A4=0.01580*(H/DIAM)*alog(ESPREB/ESP)
CB=1.218*exp(A1+A2+A3+A4)
C ******* COSTO ANUALIZADO ************
1I=0.2
1N=5
COSTOF=CB*(1I*(1+1I)**1N)/((1+1I)**1N-1)
C ******COSTO ENERGA *********************
COSTOE=(QR/1000000)*1.75+(QC/1000000)*0.28
C ****** COSTO SUBPRODUCTO*******
CSP=BENZ*4.48+TOLUEN*3.98+XYLEN*4.10
C **** COSTO TOTAL ******
TIME=24*360
COSTO=COSTOF+COSTOE*TIME*(402/394.3)-CSP*TIME

Vous aimerez peut-être aussi