Project
Package
Originator
Discipline
Doc. Type
Unit n0
Serial n0
Rev
Page
RAPID
20C1
WCTB
QAC
PRC
0001
0016
1/11
________________________________________________________________________________________________
_
METHOD OF STATEMENT
TRAFFIC DIVERSION
OWNER
Approval:
Name:
Date (DD-MMMYY):
Signature:
Document class:
00
REV.
WRITTEN BY
(Name &
Designation)
CHECKED BY
(Name & Designation
APPROVED BY
(Name & Designation
Sections changed in last revision are identified by a vertical line in the margin
DOCUMENT NUMBER
Project
Package
Originator
Discipline
Doc. Type
Unit n0
Serial n0
Rev
Page
RAPID
20C1
WCTB
QAC
PRC
0001
0016
2/11
________________________________________________________________________________________________
_
DOCUMENT NUMBER
Project
Package
Originator
Discipline
Doc. Type
Unit n0
Serial n0
Rev
Page
RAPID
20C1
WCTB
QAC
PRC
0001
0016
3/11
________________________________________________________________________________________________
_
TABLE OF CONTENT
1.0
INTRODUCTION
2.0
OBJECTIVE
3.0
REFERENCE
4.0
5.0
MANPOWER REQUIREMENT
6.0
PROCEDURE
6.1
DEFINITION
6.2
PLANNING
6.3
WORK INSTRUCTION
6.4
4
6.5
6.6
6.7
6.8
6.9
6.11 SIGNAGE
7.0
8.0
QUALITY CONTROL
10
10
9.0
10
DOCUMENT NUMBER
Project
Package
Originator
Discipline
Doc. Type
Unit n0
Serial n0
Rev
Page
RAPID
20C1
WCTB
QAC
PRC
0001
0016
4/11
________________________________________________________________________________________________
_
1.0
INTRODUCTION
This method statement introduces the proposed activities to be undertaken
and acts as a general methodology for traffic diversion during road
construction in RAPID site. This has been prepared to identify the work stages
and the construction methodology for ensuring the works are carried out in
compliance with contract requirements.
2.0
OBJECTIVE
This method statement describes the overall sequence of the traffic diversion
that will carry out at RAPID site. It also outlines the materials used, machinery
and equipment involved for ensuring the works are carried out safely and in
compliance with contract requirements.
3.0
REFERENCE
Compliance to Local Authority Requirement
4.0
5.0
MAN POWER
Construction Manager
HSSE Manager
HSE Supervisor
Site Engineer
Supervisor
Skilled Workers
General Workers
Operator
Flagman
Traffic Controller
DOCUMENT NUMBER
Project
Package
Originator
Discipline
Doc. Type
Unit n0
Serial n0
Rev
Page
RAPID
20C1
WCTB
QAC
PRC
0001
0016
5/11
________________________________________________________________________________________________
_
6.0
PROCEDURE
6.1 Definition
LIGHT VEHICLES
HEAVY VEHICLES
SLOW VEHICLES
IN HOUSE
VEHICLES
DOCUMENT NUMBER
Project
Package
Originator
Discipline
Doc. Type
Unit n0
Serial n0
Rev
Page
RAPID
20C1
WCTB
QAC
PRC
0001
0016
6/11
________________________________________________________________________________________________
_
DOCUMENT NUMBER
Project
Package
Originator
Discipline
Doc. Type
Unit n0
Serial n0
Rev
Page
RAPID
20C1
WCTB
QAC
PRC
0001
0016
7/11
________________________________________________________________________________________________
_
Duration
< 1 day
< 1 month
>1 month
DOCUMENT NUMBER
Project
Package
Originator
Discipline
Doc. Type
Unit n0
Serial n0
Rev
Page
RAPID
20C1
WCTB
QAC
PRC
0001
0016
8/11
________________________________________________________________________________________________
_
Bridge
17 in
constru
ction
Bridge
progre
18ss
to
be
(Worki
constru
ng
cted
Area)
earlier
DOCUMENT NUMBER
Project
Package
Originator
Discipline
Doc. Type
Unit n0
Serial n0
Rev
Page
RAPID
20C1
WCTB
QAC
PRC
0001
0016
9/11
________________________________________________________________________________________________
_
For one side working condition, one lane will be opened and plastic barrier
or traffic cone will be placed at the work area. Proper signage will be
erected. Refer to Figure 3 for the detail work diversion.
DOCUMENT NUMBER
Project
Package
Originator
Discipline
Doc. Type
Unit n0
Serial n0
Rev
Page
RAPID
20C1
WCTB
QAC
PRC
0001
0016
10/11
________________________________________________________________________________________________
_
6.11 Signage
A proper signage which classified as advance warning area will be
placed according to the condition. Within the advance warning area,
approaching drivers are informed that they are entering a work zone,
and given an initial indication of any action to be taken ahead. If a
temporary reduce speed limit applies in the work zone, signing for this
is located in the advanced warning area.
DOCUMENT NUMBER
Project
Package
Originator
Discipline
Doc. Type
Unit n0
Serial n0
Rev
Page
RAPID
20C1
WCTB
QAC
PRC
0001
0016
11/11
________________________________________________________________________________________________
_
Quality Control
8.1 All the works to be carried out shall in accordance with the approved
Work Quality Plan and Material Quality Plan in the Project Quality Plan.
8.2
Work Quality Plan and Material Quality Plan are the documents that to
The related site personnel shall review all the test reports based on the
criteria set in the Work Quality Plan or Material Quality Plan for all
completed works and materials.
8.4
9.0
All the work to be carried out shall comply and in accordance to the
Equipment (PPE) such as safety helmets, safety shoes, safety vest, hand
gloves, goggles and etc. whichever suitable to the activity to be carried
out.
DOCUMENT NUMBER
Project
Package
Originator
Discipline
Doc. Type
Unit n0
Serial n0
Rev
Page
RAPID
20C1
WCTB
QAC
PRC
0001
0016
12/11
________________________________________________________________________________________________
_
9.4