CRONOGRAMA DE

PROYECTO: "MANTENIMIENTO DEL SISTEMA DE TRANSMISION DE LA PLANTA DE TRATAM


LOACLIDAD: ANCASH-SANTA CHIMBOTE
FECHA: AGOSTO 2,015
NOMBRE DE TAREA

SISTEMA DE TRANSMISION
OBRAS PROVISIONALES
TRANSPORTE DE MAQUINARIAS, EQUIPOS Y HERRAMIENTAS
IMPLEMENTOS DE SEGURIDAD
SEALIZACIN Y SEGURIDAD EN OBRA
OBRAS PRELIMINARES
INSTALACION Y LIMPIEZA DE AREA EN PLANTA-REPARACION Y MANTENIMIENTO
TOLVA RECEPTORA
LIMPIEZA GENERAL RASQUETEO, LIJADO Y SOLDADURA, PINTADO CON ANTICORROSIVO
Y ESMALTE
MOTOREDUCTOR
DESMONTAJE Y CAMBIO DE RODAMIENTOS, ACEITE, REBOBINADO DE MOTOR, PINTADO
Y MONTAJE
TENSORES
CAMBIO DE TENSORES EN DUCTO DE TOLVA
ANGULARES DE ARRASTRE
COLOCACION DE NUEVOS ANGULARES DE ARRASTRE
FAJA TRANSPORTADORA DE TOLVA
CAMBIO DE FAJA DE ARRASTRE NUEVA
DUCTO DE ELEVACION
LIMPIEZA Y REPARACION GENERAL,RASQUETEO, PLANCHADO, ALINEAMIENTO, PINTADO
CON ANTICORROSIVO Y ESMALTE
POLINES DE DESLIZAMIENTO
DESMONTAJE, LIMPIEZA GENERAL, ALINEAMIENTO, CAMBIO DE RODAMIENTOS Y
ENGRASE GENERAL, MONTAJE
BABEROS ANTDERRAME
COLOCACION DE NUEVOS BABEROS D/V
TENSOR SUPERIOR
CAMBIO DE TENSORES, LIMPIEZA DE SOPORTES Y REGULACIONES
BABEROS RASCADORES
COLOCACION DE NUEVOS BABEROS TASCADORES TIPO D/V
FAJA TRANSPORTADORA CLASIFICADOR
COLOCADO DE NUEVA FAJA EN UN TRAMO, REGULACION GENERAL, MANTENIMIENTO
DE POLINES Y SIST. ELECTRICO
POLINES GUIAS EN FAJA CLASIFICADOR
LIMPIEZA GENERAL, ENGRASE, SINCRONIZADOR, SEGURIDAD, CAMBIO DE
RODAMIENTOS Y PINTADO
DESGARRADORA DE BOLSAS
LIMPIEZA GENERAL CAMARA DE RECEPCION, RASQUETEO Y LIJADO, AJUSTE DE
CUCHILLAS HELICOIDALES Y PINTADO C/ANTIC.+ESMALTE

MOTO REDUCTOR PARA DESGARRADORA DE BOLSAS


DESMONTAJE Y CAMBIO DE RODAJES Y CONTACTOS, REGULACION Y MONTAJE
SISTEMA ELECTRICO
REVISION SISTEMA ELECTRICO TOTAL DE CONEXIONES DE ALIMENTACION Y CONTROL
TABLERO DE FUERZA
MANTENIMIENTO GENERAL Y REGULACION
TABLERO DE FUERZA Y MANDO CLASIFICADOR
MANTENIMIENTO DE MOTO REDUCTOR PRINCIPAL, SIST. SEGURIDAD, CAMBIO FUSIBLES
DE 100Amp
PRENSA VERTICAL
LIMPIEZA GENERAL, MANT. TABLERO ELECTRICO Y SIST. HIDRAULICO, CAMBIO DE
ACEITE, REGULACION , ENGRASE Y PINTADO
PRENSA HORIZONTAL
LIMPIEZA GENERAL, MANT. TABLERO ELECTRICO Y SIST. HIDRAULICO, CAMBIO DE
ACEITE, REGULACION , ENGRASE Y PINTADO
TRITURADOR DE PLASTICO
MANTENIMIENTO TABLERO FUERZA Y CONTROL, MAN. TRANSFORMADOR Y
REGULACION DE CUCHILLAS TROZADORAS, MANT. SIST. CENTRIFUGA AL VACIO, MANT.
MOTO REDUCTOR, CAMBIO DE ACEITE Y PINTADO
MOTO REDUCTOR DE TOLVA DESGARRADORA DE ORGANICOS
DESMONTAJE, MANT. DE MOTOR, REGULACION DE POLINES DE DESLIZAMIENTO,
LIMPIEZA DE DUCTOS Y PINTADO
TANQUE DE DEORIZACION
DESMONTAJEY CAMBIO DE TANQUE NUEVO PVC BLANCO PAVONADO, MANT. DE BOMBA
HIDRAULICA Y REPARACION SIST. ELECTRICO
MANTENIMIENTO DE TABLERO DE ENTRADA
CAMBIO DE LLAVE TERMICA DE 400 AMP. TRIFASICO
TOLVA DE DESCARGA
MANTENIMIENTO GENERAL RASQUETEO Y PINTADO CON ANTICORROSIVO Y ESMALTE
CARRO VOLTEADOR
MANTENIMIENTO GENERAL, MANTENIMIENTO ELECTRICO MECANICO, SISTEMA DE
VOLTEO Y PINTADO
COSTO DIRECTO
GASTOS GENERALES
(8%)
SUB TOTAL
IMPUESTO GENERAL ALAS VENTAS
PRESUPUESTO TOTAL
PORCENTAJE DE AVANCE
AVANCE ACUMULADO

(18%)

GRAMA DE OBRA PROGRAMADA

LANTA DE TRATAMIENTO DE RESIDUOS SOLIDOS, DISTRITO DE CHIMBOTEI, PROVINCIA DEL SANTA

COSTO

TIEMPO DE EJECUCION
SEMANA 2
SEMANA 3
S/. 27,166.29
S/. 21,229.44

S/. 87,056.39
S/. 2,469.16
S/. 1,166.16
S/. 720.00
S/. 583.00
S/. 3,086.16

SEMANA 1
S/. 10,985.53
S/. 2,469.16
S/. 1,166.16
S/. 720.00
S/. 583.00
S/. 3,086.16

S/. 3,086.16

S/. 3,086.16

S/. 4,028.70

S/. 2,182.21

S/. 1,846.49

S/. 4,028.70

S/. 2,182.21

S/. 1,846.49

S/. 2,115.76

S/. 2,115.76

S/. 2,115.76

S/. 2,115.76

S/. 1,406.40
S/. 1,406.40
S/. 3,660.00
S/. 3,660.00
S/. 5,029.75
S/. 5,029.75
S/. 10,029.75

S/.
S/.
S/.
S/.
S/.
S/.
S/.

1,406.40
1,406.40
3,660.00
3,660.00
5,029.75
5,029.75
5,850.69

S/. 4,179.06

S/. 10,029.75

S/. 5,850.69

S/. 4,179.06

S/. 4,508.40

S/. 4,508.40

S/. 4,508.40

S/. 4,508.40

S/. 4,517.40
S/. 4,517.40
S/. 913.20
S/. 913.20
S/. 1,002.40
S/. 1,002.40
S/. 3,015.00

S/. 4,517.40
S/. 4,517.40
S/. 913.20
S/. 913.20
S/. 1,002.40
S/. 1,002.40
S/. 3,015.00

S/. 3,015.00

S/. 3,015.00

S/. 5,063.50

S/. 2,215.28

S/. 5,063.50

S/. 2,215.28

S/. 3,012.70

S/. 878.70

S/. 3,012.70

S/. 878.70

S/. 2,534.00
S/. 2,534.00
S/. 2,926.00

S/. 2,926.00

S/. 2,926.00

S/. 2,926.00

S/. 1,545.60
S/. 1,545.60
S/. 4,104.00

S/. 322.00
S/. 322.00

S/. 4,104.00

S/. 1,223.60
S/. 1,223.60
S/. 4,104.00
S/. 4,104.00

S/. 6,150.80
S/. 6,150.80
S/. 2,061.70
S/. 2,061.70
S/. 4,583.00
S/. 4,583.00
S/. 1,527.45
S/. 1,527.45
S/. 2,527.20
S/. 2,527.20
S/. 1,929.60
S/. 1,929.60
S/. 2,079.66

S/. 1,929.60
S/. 1,929.60

S/. 2,079.66
S/. 1,229.10
S/. 1,229.10
S/. 87,056.39
S/. 6,964.51
=========
S/. 94,020.90
S/. 16,923.76
=========
S/. 110,944.66

S/. 10,985.53
S/. 878.84
=========
S/. 11,864.37
S/. 2,135.59
=========
S/. 13,999.96
12.62%
12.62%

S/. 27,166.29
S/. 2,173.30
=========
S/. 29,339.59
S/. 5,281.13
=========
S/. 34,620.72
31.21%
43.82%

S/. 21,229.44
S/. 1,698.36
=========
S/. 22,927.80
S/. 4,127.00
=========
S/. 27,054.80
24.39%
68.21%

OTEI, PROVINCIA DEL SANTA - ANCASH"

EJECUCION
SEMANA 4
S/. 21,540.82

S/. 2,848.22
S/. 2,848.22
S/. 2,134.00
S/. 2,134.00

SEMANA 5
S/. 6,134.31

S/. 2,534.00
S/. 2,534.00

S/. 6,150.80
S/. 6,150.80
S/. 2,061.70
S/. 2,061.70
S/. 4,583.00
S/. 4,583.00
S/. 1,527.45
S/. 1,527.45
S/. 2,527.20
S/. 2,527.20

S/. 2,079.66
S/. 2,079.66
S/. 1,229.10
S/. 1,229.10
S/. 21,540.82
S/. 1,723.27
=========
S/. 23,264.09
S/. 4,187.54
=========
S/. 27,451.62
24.74%
92.95%

S/. 6,134.31
S/. 490.74
=========
S/. 6,625.05
S/. 1,192.51
=========
S/. 7,817.56
7.05%
100.00%