DAFTAR HARGA SATUAN UPAH DAN BAHAN

PEKERJAAN PEMBANGUNAN GEDUNG NEGARA


TAHUN ANGGARAN 2008
NO.
1
1
2
3
4
5
6
7
8
9
10
11

URAIAN HARGA UPAH


2
Pekerja
Mandor

HARGA

SATUAN

4
Org/Hari
OH
OH
OH
OH
OH
OH
OH
OH
OH
OM

@Rp.
-"-"-"-"-"-"-"-"-"-"-

Tukang Batu
Tukang Kayu
Tukang Besi
Tukang Keramik
Tukang Plafond
Tukang Pasang Pipa
Tukang Cat

Kepala Tukang
Jaga Malam

49,500.00
60,500.00
71,500.00

71,500.00
71,500.00
71,500.00
71,500.00
71,500.00
71,500.00
82,500.00
38,500.00

NO.

URAIAN HARGA BAHAN-BAHAN

HARGA

SATUAN

A.
1
2
3
4
5
6
B.
1
2
3
4
5
6
C.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

TIMBUNAN / GALIAN
Tanah Timbun/Merah
Pasir Timbun / urug
Pasir Pasang
Pasir Beton
Sirtu
Tanah Humus
BAHAN PEREKAT
Portland Cement (PC)
Cement Putih
Lem Kayu
Lem Vinyl / Karet
Perekat Kaca
Waterfroof
BATU / BATU CETAKAN
Batu Kerikil/koral 3 - 5 cm
Batu Kerikil/koral 5 - 7 cm
Batu Kerikil/Koral 7 - 10 cm
Batu Belah/Kali 10 - 15 cm
Batu Belah/Kali 15 - 20 cm
Batu Pecah 1 - 2 cm
Batu Pecah 2 - 3 cm
Batu Pecah 3 - 5 cm
Batu Pecah 5 - 7 cm
Batu Kacang/jagung 0,5 - 1 cm
Batu Splyt
Batu Bata Biasa 5x10x20 cm
Batu Bata Mesin 5x10x20 cm
Batu Bataco
6x12x24 cm

@Rp.
-"-"-"-"-"-

62,900.00

@Rp.
-"-"-"-"-"-

1,270.00

@Rp.
-"-"-"-"-"-"-"-"-"-"-"-"-"-

64,400.00
76,500.00
87,800.00
87,800.00
71,500.00

2,500.00
37,400.00
44,900.00

76,500.00
52,300.00
185,900.00
170,900.00
155,900.00
140,900.00
125,900.00
190,200.00
177,700.00
165,200.00
150,200.00
202,700.00
212,700.00
610.00
720.00
4,180.00

M3
M3
M3
M3
M3
M3
Kg
Kg
Kg
Kg
Kg
Kg
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
Bh
Bh
Bh

15
16
17
18
19
20
21
22
23
24
25
26
27

Batu Krawang 10x10x20 cm


Batu Krawang 10x15x15 cm
Batu Krawang 10x20x20 cm
Concrete Block (CB) 10
Concrete Block (CB) 15
Concrete Block (CB) 20
Bondbeam/Kanstin 60x30x20 cm
Con Block Warna type Hollan
tbl 6 cm
Con Block Warna type Uni Pave tbl 6 cm
Con Block Warna type Dosex Six tbl 6 cm
Con Block Warna type Hexagon tbl 6 cm
Con Block K 125
Con Block K 175

-"-"-"-"-"-"-"-"-"-"-"-"-"-

3,030.00
3,470.00
3,740.00
740.00
1,600.00
2,920.00
30,250.00
1,720.00
1,600.00
1,840.00
1,710.00
1,750.00
2,700.00

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

1
D.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48

2
KAYU / LANGIT-LANGIT
Balok Kayu Jati
Papan Kayu Jati
Balok Kayu Damar Laut
Papan Kayu Damar Laut
Balok Kayu Meranti Batu
Papan Kayu Meranti Batu
Balok Kayu Kapur
Papan Kayu Kapur
Balok Kayu Meranti Kls.II
Papan Kayu Meranti Kls.II
Kayu Sembarang/Bekisting
Kayu Bakar
Papan Lambsering/Rider
Kayu Lat Asbes 5x30x400 mm
Kayu Kaso 5 - 7 / 400 cm
Kayu Dolken / kayu laut 7,5 - 10 / 400 cm
Bambu 6 - 8 / 600 cm
Bilik bambu
Kayu Profil 1"
Kayu Profil 2"
Kayu Profil 3"
Kayu Profil 4"
Profil Gypsum 2"
Profil Gypsum 3"
Profil Gypsum 4"
Profil Gypsum 6"
Playwood 120 x 240 tbl.18 mm
Playwood 120 x 240 tbl.12 mm
Playwood 120 x 240 tbl. 9 mm
Playwood 120 x 240 tbl. 6 mm
Playwood 120 x 240 tbl. 4 mm
Teakwood 120 x 240 tbl. 3 mm
Triplek Jati 120 x 240 tbl. 3 mm
TriplekSungkai 120 x 240 tbl.3 mm
Formica 120 x 240 cm
Soft Board 120 x 240 tbl. 4 mm
Soft Board 120 x 240 tbl. 6 mm
Soft Board 120 x 240 tbl. 9 mm
Soft Board 120 x 240 tbl.12 mm
Gypsum 120 x 240 tbl. 6 mm
Gypsum 120 x 240 tbl. 9 mm
Gypsum 120 x 240 tbl.12 mm
Asbes Lokal 100 x 100 cm
Asbes Atrisco 100 x 100 cm t= 4 mm
Asbes Atrisco 100 x 100 cm t= 5 mm
Asbes Atrisco 100 x 100 cm t= 6 mm
Akustik 30 x 30 cm
Akustik 30 x 60 cm

3
@Rp.
-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-

23,925,000.00
24,104,440.00
9,350,000.00

9,650,000.00
9,075,000.00

9,375,000.00
6,490,000.00

6,790,000.00
5,225,000.00

5,475,000.00
3,107,500.00

187,000.00
225,000.00
7,430.00
87,780.00
19,250.00
13,750.00
16,340.00
6,270.00
12,540.00
18,810.00
25,080.00
4,600.00
5,450.00
6,660.00
7,870.00
233,640.00
155,760.00
116,820.00
77,880.00
51,920.00
54,450.00
85,250.00
79,750.00
74,250.00
55,990.00
84,150.00
126,230.00
168,250.00
59,950.00
71,500.00
93,500.00
9,350.00
11,550.00
14,440.00
17,330.00
8,540.00
17,070.00

M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M2
Btg
Btg
Btg
Btg
M2
M'
M'
M'
M'
M'
M'
M'
M'
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr

49
50
51
52
53

Akustik 60 x 120 cm
Rangka Furing Ceiling Gypsum
Rangka Furing Dinding Gypsum
Tepung Dempul
Kain Kasa/Paper Tape

-"-"-"-"-"-

68,290.00
52,250.00
63,800.00
10,450.00
57,750.00

Lbr
M2
M2
Kg
Roll

E.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

BESI / ALLUMINIUM
Besi Beton Polos
Besi Beton Ulir
Besi Profil WF/INP
Besi Siku
Besi CNP
Besi Plat Strip
Besi Plat Polos
Kawat Besi Beton
Kawat Licin / seng polos
Kawat Duri
Kawat Nyamuk
Kawat Kasa
Kawat Harmonika # 1"
Kawat Burung
Pagar Kawat BRC 120 polos
Pintu Besi
Pintu Gulung Besi
Pintu Lipat Besi

20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48

Pintu Rolling Door


Jerajak Besi Bermotif
Jerajak Besi Strip
Rangka Baja Ringan
Kosen Pintu Alluminium ( 80 x 210 ) Coklat
Kosen Pintu Alluminium ( 80 x 210 ) putih
Kosen Jendela Alluminium ( 120 x 60 ) coklat
Kosen Jendela Alluminium ( 120 x 60 ) putih
Pintu Alluminium ( 80 x 210 ) Coklat
Pintu Alluminium ( 80 x 210 ) putih
Jendela Alluminium + Kaca 5 mm ( 120 x 60 ) coklat
Jendela Alluminium + Kaca 5 mm ( 120 x 60 ) putih
Kosen Pintu / Jendela Alluminium Coklat
Kosen Pintu / Jendela Alluminium putih
Daun Jendela Alluminium coklat
Daun Jendela Alluminium putih
Profil Alluminium T
Vention Blinds
Verticals Blinds
Bingkai Naco Niki hitam
Bingkai Naco Niki putih
Paku Beton 0,5 - 2"
Paku Beton 2" - 5"
Paku Biasa 0,5 - 2"
Paku Biasa 2 - 5"
Sekrup macam Ukuran
Sekrup 0,5 - 2"
Sekrup fisher
Bout 5/8" - 8"

3
@Rp.
-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-

14,410.00
14,580.00
15,950.00
11,990.00
13,090.00
11,880.00
13,630.00
16,830.00
22,530.00
4,030.00
11,980.00
13,920.00
23,600.00
12,710.00
235,950.00
816,750.00
828,850.00
837,320.00
465,850.00
347,270.00
312,180.00
177,870.00
405,350.00
371,470.00
287,380.00
248,050.00
711,480.00
609,840.00
304,920.00
261,360.00
78,650.00
66,550.00
54,450.00
48,400.00
8,470.00
163,350.00
175,450.00
201,660.00
168,060.00
310.00
530.00
16,940.00
14,520.00
21,180.00
420.00
360.00
19,970.00

Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
M'
M2
M2
M2
M2
Lbr
M2
M2
M2
M2
M2
M2
M2
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M'
M'
M'
M'
M'
M2
M2
M2
M2
Bh
Bh
Kg
Kg
Kg
Bh
Bh
Bh

49 Bout Angker 3/4" - 10"


50 Bout Ramset / Dina bolt
51 Rangka Atap Twin light

-"-"-"-

45,380.00
720.00
302,500.00

Bh
Bh
M2

1
F.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47

2
PENUTUP LANTAI DAN DINDING
Ubin granito 30 x 30 cm
Ubin granito 40 x 40 cm
Ubin granito 60 x 60 cm
Ubin Mosaik 30 x 30 cm
Ubin Marmer Ex.DN
Ubin teralux marmer 30 x 30 cm
Ubin teralux marmer 40 x 40 cm
Ubin teralux marmer 60 x 60 cm
Ubin keramik 10 x 20 cm
Ubin keramik 15 x 15 cm
Ubin keramik 20 x 20 cm
Ubin keramik 20 x 25 cm
Ubin keramik 25 x 25 cm
Ubin keramik 30 x 30 cm
Ubin keramik 30 x 30 cm anti slip
Ubin keramik 40 x 40 cm
Ubin keramik artistik 5 x 20 cm
Ubin keramik artistik 10 x 10 cm
Ubin keramik artistik 10 x 20 cm
Ubin keramik Essenza 30 x 30 cm
Ubin keramik Essenza 40 x 40 cm
Porselin 11 x 11 cm putih
Porselin 11 x 11 cm, warna
Porselin 15 x 15 cm, putih
Porselin 15 x 15 cm, warna
Plint ubin teralux marmer 10 x 30 cm
Plint ubin teralux marmer 10 x 40 cm
Plint ubin teralux marmer 10 x 60 cm
Plint ubin granito 10 x 30 cm
Plint ubin granito 10 x 40 cm
Plint ubin granito 10 x 60 cm
Plint ubin keramik 10 x 30 cm
Plint ubin keramik 10 x 40 cm
Plint ubin keramik 10 x 60 cm
Plint ubin keramik 15 x 30 cm
Plint ubin keramik 15 x 40 cm
Plint ubin keramik 15 x 60 cm
Batu Lapis Dinding 7x3x24
Batu tempel hitam
Batu Poros
Carpet
Carpet 80 % wool, 20 % nylon
Feltex carpet 100 % wool-T-21
Underlyer tebal 6 mm / rubber corrugated
Vynil asbes 30 x 30 cm
Vynil karet 30 x 30 cm KL I
Vynil karet 30 x 30 cm KL II

3
@Rp.
-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-

26,260.00
46,590.00
104,670.00
13,920.00
261,970.00
27,230.00
48,400.00
109,510.00
1,210.00
1,400.00
2,490.00
3,150.00
3,870.00
5,570.00
6,290.00
9,680.00
910.00
910.00
1,760.00
21,180.00
37,630.00
1,210.00
1,450.00
2,300.00
2,540.00
16,340.00
29,040.00
65,700.00
27,950.00
62,800.00
157,180.00
4,110.00
5,690.00
8,110.00
5,810.00
7,740.00
11,620.00
2,040.00
104,500.00
114,680.00
90,750.00
87,450.00
85,250.00
104,500.00
8,230.00
9,800.00
9,080.00

Bh
Bh
Bh
Bh
M2
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M2
M2
M2
M2
M2
M2
Bh
Bh
Bh

48
49
50
51
52
53
54

Vynil motif kembang ex DN 30 x 30 cm


Vynil wall covering lebar 50 cm
Perquet Jati
Gymfloor
Paku Pancing 60 - 230
Sekrup 3,5"
Sekrup 3,5"

-"-"-"-"-"-"-"-

9,440.00
63,250.00
368,500.00
79,750.00
720.00
410.00
20,350.00

Bh
M2
M2
M2
Bh
Kg
Kg

1
G.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48

2
PENUTUP ATAP
Atap Genteng Palentong
Atap Genteng Palentong super
Atap Genteng Kodok
Atap Genteng Beton
Atap Genteng Keramik
Atap Genteng Aspal
Atap Sirap
Atap Genteng Metal/Multi Roof 35 Uk.77x80
Atap Genteng Asbes Cement 0,35
Atap Aluminium gelombang tebal 0,55
Atap Seng Alumi Zinc warna 0,35
Atap Twin Light
Atap Seng gelombang 3' x 6' bjls 35
Atap Seng Super Deck 3' x 6' tbl.0,30
Roof light fibreglass gelombang 180
Atap Asbes gelombang 1,8 x 1,05 tbl.4 mm
Atap Asbes gelombang 2,1 x 1,05 tbl.4 mm
Atap Asbes gelombang 2,4 x 1,05 tbl.4 mm
Atap Asbes gelombang 2,7 x 1,05 tbl.4 mm
Atap Asbes gelombang 1,8 x 0,92 tbl.5 mm
Atap Asbes gelombang 2,1 x 0,92 tbl.5 mm
Atap Asbes gelombang 2,4 x 0,92 tbl.5 mm
Atap Asbes gelombang 2,7 x 0,92 tbl.5 mm
Atap Asbes gelombang 1,8 x 1,08 tbl.6 mm
Atap Asbes gelombang 2,1 x 1,08 tbl.6 mm
Atap Asbes gelombang 2,4 x 1,08 tbl.6 mm
Atap Asbes gelombang 2,7 x 1,08 tbl.6 mm
Genteng bubung palentong
Genteng bubung palentong super
Genteng bubung kodok
Nok genteng Beton
Nok genteng Keramik
Nok genteng Aspal
Nok genteng Metal/Multi Roof (Decra bond)
Nok genteng Asbes gelomang Cement 0,35
Nok Alluminium standard 40 cm 18 swg 22
Bubung/Nok Stel Gelombang 0,92 m' tbl.5 mm
Bubung/Nok Stel Gelombang 1,05 m' tbl.4 mm
Bubung/Nok Stel Gelombang 1,08 m' tbl.6 mm
Bubung/Nok Paten 0,92 m' tbl.5 mm
Bubung/Nok Paten 1,05 m' tbl.4 mm
Bubung/Nok Paten 1,08 m' tbl.6 mm
Bubung/Nok Stel Rata 0,92 m' tbl.5 mm
Bubung/Nok Stel Rata 1,05 m' tbl.4 mm
Bubung/Nok Stel Rata 1,08 m' tbl.6 mm
Seng plat 3" x 6" bjls 35
Seng plat 3" x 6" bjls 30
Plastic aerator

3
@Rp.
-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-

4
1,670.00
3,980.00
2,170.00
5,970.00
11,390.00
11,320.00
1,030.00
64,130.00
66,790.00
98,180.00
62,040.00
74,250.00
59,640.00
68,750.00
46,390.00
59,380.00
93,170.00

108,130.00
113,300.00
70,950.00
88,770.00
97,020.00
106,810.00
103,620.00
120,450.00
128,370.00
155,430.00
9,350.00
12,740.00
9,560.00
13,440.00
15,040.00
29,350.00
41,140.00
33,770.00
47,890.00
19,590.00
25,990.00
28,510.00
36,810.00
30,950.00
42,960.00
36,080.00
30,250.00
40,600.00
115,500.00
103,950.00
27,500.00

Bh
Bh
Bh
Bh
Bh
Lbr
Bh
Lbr
Lbr
Lbr
M2
M2
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Lbr
M2
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
Lbr
M2

49
50
51
52

Sisalation / aluminium foil


Paku Seng + Ring karet
Paku Seng + Ring karet
Paku hak panjang 15 cm

-"-"-"-"-

77,200.00
20,350.00
410.00
30,530.00

M2
Kg
Bh
Kg

H.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33

KUNCI DAN KACA


Kunci tanam antik
Kunci tanam biasa
Kunci tanam kamar mandi
Kunci silinder
Kunci selot
Kunci lemari
Engsel pintu 4"
Engsel jendela 3"
Engsel angin
Kait angin
Rel pintu dorong
Sealent
Spring knip
Door closer
Door handle
Door stop
Espanyolet
Kaca Block 20 x 20 cm
Kaca Polos tbl. 3 mm
Kaca Polos tbl. 5 mm
Kaca Polos tbl. 8 mm
Kaca Reyben tbl. 5 mm
Kaca Reyben tbl. 8 mm
Kaca buram tbl.3 mm
Kaca buram tbl.5 mm
Kaca buram tbl.8 mm
Kaca cermin tebal 5 mm
Kaca cermin tebal 6 mm
Kaca cermin tebal 8 mm
Kaca patri
Kaca wireglass
Kaca Reyben Naco 30 x 60 cm tbl.5 mm
Kaca Bening Naco 30 x 60 cm tbl.5 mm

@Rp.
-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-

214,500.00

I.
1
2
3
4
5
6
7
8
9
10
11
12
13

CAT / MINYAK
Cat Dasar
Cat Tembok setara Vinilex
Cat Minyak untuk Kayu
Cat Minyak untuk Besi
Cat Menie Kayu
Cat Menie Besi
Cat Sending
Cat Melamix
Cat Vernis Jadi
Plamir
Dempul Gypsum
Dempul Cat
Minyak Cat

@Rp.
-"-"-"-"-"-"-"-"-"-"-"-"-

15,730.00

90,020.00
54,690.00
34,490.00
27,230.00
12,340.00
15,130.00
11,250.00
25,050.00
19,120.00
160,330.00
39,330.00
9,080.00
109,750.00
113,010.00
38,120.00
88,450.00
26,020.00
87,120.00
145,200.00
232,320.00
193,120.00
308,980.00
72,600.00
111,320.00
193,600.00
161,700.00
194,040.00
258,720.00
169,400.00
151,250.00
13,590.00
10,730.00

19,360.00
35,700.00
39,330.00
20,570.00
25,410.00
54,450.00
59,290.00
48,280.00
15,730.00
10,410.00
11,860.00
11,010.00

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Kg
Bh
Bh
Bh
Bh
Bh
Bh
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
Lbr
Lbr
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg

14
15
16
17
19
20
22

Minyak Bekisting
Residu / Kolter
Soda Api
Sabun
Kuas
Ampelas/Kertas Pasir
Wall paper

-"-"-"-"-"-"-"-

6,290.00
6,530.00
12,100.00
10,290.00
7,870.00
1,820.00
30,610.00

Ltr
Ltr
Kg
Kg
Bh
Lbr
M2

1
J.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48

2
SANITASI / PIPA
Kloset duduk / monoblok Lengkap tangki
Kloset duduk / monoblok tanpa tangki
Kloset jongkok porselin
Bakkif Porselen
Wastafel
Urinoir
Kran air 1/2" - 3/4"
Kran air leher angsa 1/2"
Kran Shower
Kran Cebok
Bak fibreglass 0,3 M3
Bak fibreglass 1 M3
Bak cuci piring steinless 2 Lobang
Bak cuci piring teraso 2 Lobang
Tempat sabun keramik
Floor Drain 4" steinlees
Stop Kran 3/4"
Tutup Bak air 1" Kuningan
Instalasi air Bersih
Instalasi air Kotor/Limbah
Buis Beton 1/2 15 cm
Buis Beton 1/2 20 cm
Buis Beton 1/2 30 cm
Buis Beton 15 cm
Buis Beton 20 cm
Buis Beton 30 cm
Buis Beton 40 cm
Buis Beton 50 cm
Buis Beton 60 cm
Buis Beton 80 cm
Buis Beton 100 cm
Bodem 30 x 60 cm
Pipa PVC Tipe AW 1/2"
Pipa PVC Tipe AW 3/4"
Pipa PVC Tipe AW 1"
Pipa PVC Tipe AW 11/2"
Pipa PVC Tipe AW 2"
Pipa PVC Tipe AW 21/2"
Pipa PVC Tipe AW 3"
Pipa PVC Tipe AW 4"
Pipa Besi Hitam 1/2"
Pipa Besi Hitam 3/4"
Pipa Besi Hitam 1"
Pipa Besi Hitam 11/2"
Pipa Besi Hitam 2"
Pipa Besi Hitam 21/2"
Pipa Galvanis 1/2"
Pipa Galvanis 3/4"

3
@Rp.
-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-

1,931,600.00
1,391,500.00
225,280.00
3,025,000.00
526,350.00
557,480.00
27,350.00
77,200.00
92,570.00
72,240.00
181,500.00
522,720.00
466,700.00
272,250.00
56,270.00

15,000.00
27,500.00
12,500.00
100,000.00
125,000.00
11,250.00
17,790.00
20,090.00
19,240.00
27,350.00
56,270.00
63,400.00
95,950.00
136,000.00
201,100.00
345,820.00
25,300.00
5,540.00
7,440.00
13,620.00
19,670.00
23,190.00
26,620.00
29,840.00
49,920.00
14,770.00
20,140.00
29,520.00
37,580.00
47,600.00
50,220.00
14,770.00
20,140.00

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Ttk
Ttk
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
Bh
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'
M'

49
50
51
52
53
54
55
56
57
58
59
60
1
K.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36

Pipa Galvanis 1"


Pipa Galvanis 11/4"
Pipa Galvanis 11/2"
Pipa Galvanis 2"
Pipa Galvanis 21/2"
Fitting Pipa AW 1" yang terdiri dari :
Fitting Knee AW 1"
Fitting Tee AW 1"
Fitting Socht AW 1"
Bocht LL-D 1"
Union Socht 1"
D-Nipple 1"

-"-"-"-"-"-

29,520.00

-"-"-"-"-"-"-

5,230.00

2
LISTRIK / ACSESORIES
Lampu TL 1 x 20 W Lengkap kotak
Lampu TL 1 x 40 W Lengkap kotak
Lampu TL 2 x 20 W Lengkap kotak
Lampu TL 2 x 40 W Lengkap kotak
Lampu TL Bambu 1 x 20 W Lengkap
Lampu TL Bambu 1 x 40 W Lengkap
Lampu XL 5 W + Fitting
Lampu XL 8 W + Fitting
Lampu XL10 W + Fitting
Lampu XL14 W + Fitting
Lampu XL18 W + Fitting
Lampu XL24 W + Fitting
Lampu Downlight 5 W Lengkap
Lampu Pijar 5 w + Fitting
Lampu Pijar 10 w + Fitting
Lampu Pijar 15 w + Fitting
Lampu Pijar 20 w + Fitting
Lampu Pijar 25 w + Fitting
Lampu Pijar 40 w + Fitting
Stop Kontak Tanam
Saklar Tunggal
Saklar Ganda
Saklar Triple
Zekring box 1 grup
Zekring box 2 grup
Zekring box 3 grup
Zekring box 4 grup
MCB 2 Ampere
MCB 4 Ampere
MCB 6 Ampere
MCB 8 Ampere
Kabel Listrik NYA 1,5 mm
Kabel Listrik NYA 2,5 mm
Kabel Listrik NYA 4 mm
Kabel Listrik NYM 2 1,5 mm
Kabel Listrik NYM 2 2,5 mm

33,560.00
37,580.00
47,600.00
52,440.00

7,150.00
4,680.00
24,750.00
7,430.00
18,150.00

3
@Rp.
-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-"-

M'
M'
M'
M'
M'
Bh
Bh
Bh
Bh
Bh
Bh
4

54,450.00
60,500.00
163,350.00
183,920.00
108,900.00
123,420.00
25,410.00
27,230.00
29,040.00
33,280.00
33,880.00
38,720.00
54,450.00
8,250.00
8,800.00
9,350.00
9,900.00
10,450.00
11,550.00
10,290.00
14,520.00
15,730.00
18,150.00
26,620.00
31,350.00
38,500.00
46,200.00
35,200.00
42,900.00
67,760.00
99,220.00
1,120.00
1,930.00
8,250.00
4,020.00
9,990.00

Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Bh
Bh
Bh
Bh
Unt
Unt
Unt
Unt
Unt
Unt
Unt
Unt
M'
M'
M'
M'
M'

37 Kabel Listrik NYM 2 4 mm


38 Instalasi listrik titik api / Lampu Nyala

-"-"Medan,

15,970.00
101,750.00

02 Juni 2008

M'
Ttk

DAFTAR HARGA SATUAN UPAH DAN BAHAN


PEKERJAAN PEMBANGUNAN GEDUNG NEGARA
TAHUN ANGGARAN ...
NO.

URAIAN HARGA UPAH

HARGA

1
1
2

Pekerja
Mandor

@Rp.
@Rp.

0.00
0.00

4
Org/Hari
OH

3
4
5

Tukang Batu
Tukang Kayu
Kepala Tukang

@Rp.
@Rp.
@Rp.

0.00
0.00
0.00

OH
OH
OH

NO.
1
A.

URAIAN HARGA BAHAN-BAHAN


2
TIMBUNAN / GALIAN

SATUAN

HARGA
3

SATUAN
4

1
2

Tanah Timbun
Pasir Timbun / urug

@Rp.
@Rp.

0.00
0.00

M3
M3

3
4

Pasir
Pasir Beton

@Rp.
@Rp.

0.00
0.00

M3
M3

Sirtu

@Rp.

0.00

M3

B.
1
2

BAHAN PEREKAT
Portland Cement (PC)
Cement Putih/ Warna

@Rp.
@Rp.

0.00
0.00

Kg
Kg

3
C.

Air kerja
BATU / BATU CETAKAN

@Rp.

0.00

Ltr

1
2

Batu Kerikil
Batu kali

@Rp.
@Rp.

0.00
0.00

M3
M3

3
4

Batu Bata Biasa 5x10x20 cm


Batu Bata Mesin 5x10x20 cm

@Rp.
@Rp.

0.00
0.00

Bh
Bh

D.
1

KAYU
Balok Kayu Damar Laut / Kelas I

@Rp.

0.00

M3

2
3

Papan Kayu Damar Laut / Kelas I


Balok Kayu Meranti / Kelas II

@Rp.
@Rp.

0.00
0.00

M3
M3

4
5

Papan Kayu Meranti / Kelas II


Kayu Sembarang/Bekisting / Kelas III

@Rp.
@Rp.

0.00
0.00

M3
M3

6
E.
1

Papan Sembarang
BESI / KAWAT / ALLUMINIUM
Besi Beton Polos

@Rp.

0.00

Kpg

@Rp.

0.00

Kg

2
3

Besi Beton Ulir


Kawat Beton

@Rp.
@Rp.

0.00
0.00

Kg
Kg

4
5

Paku Beton 0,5 - 2"


Paku Beton 2" - 5"

@Rp.
@Rp.

0.00
0.00

Bh
Bh

6
7

Paku Biasa 0,5 - 2"


Paku Biasa 2 - 5"

@Rp.
@Rp.

0.00
0.00

Kg
Kg

J.
1

SANITASI / PIPA
Buis Beton 1/2 15 cm

@Rp.

0.00

M'

2
3

Buis Beton 1/2 20 cm


Buis Beton 1/2 30 cm

@Rp.
@Rp.

0.00
0.00

M'
M'

4
5

Buis Beton 15 cm
Buis Beton 20 cm

@Rp.
@Rp.

0.00
0.00

M'
M'

6
7
8

Buis Beton 30 cm
Buis Beton 40 cm
Buis Beton 50 cm

@Rp.
@Rp.
@Rp.

0.00
0.00
0.00

M'
M'
M'

9
10

Buis Beton 60 cm
Buis Beton 80 cm

@Rp.
@Rp.

0.00
0.00

M'
M'

11
12

Buis Beton 100 cm


Bodem pracetak 1/2 30 cm

@Rp.
@Rp.

0.00
0.00

M'
Bh

DAFTAR ANALISA BIAYA KONSTRUKSI TAHUN ...

17

DINAS CIPTA KARYA DAN PERTAMBANGAN

SNI 03-2835-2002 PEKERJAAN PERSIAPAN


PA

PA

6.4

1 m' Pengukuran dan Pemasangan bouwplank


SNI 03-2835-2002
Bahan Kayu 5/7
0.012 M3 x Rp
Paku biasa 2" - 5"
0.020 Kg x Rp
Kayu papan 3/10
0.007 M3 x Rp
Jumlah (1)

0 =
0 =
0 =
=

Rp
Rp
Rp
Rp

0.00
0.00
0.00
0.00

Upah Tukang kayu


Pekerja
Kepala tukang
Mandor

0
0
0
0

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

0.00
0.00
0.00
0.00
0.00
0.00

0 =
0 =
=

Rp
Rp
Rp

0.00
0.00
0.00

0 = Rp.
0 = Rp.
= Rp.

0.00
0.00
0.00

0 = Rp.
0 = Rp.
= Rp.

0.00
0.00
0.00

x Rp.
x Rp.
Jumlah

0 = Rp.
0
Rp.
= Rp.

0.00
0.00
0.00

0.100
0.100
0.010
0.005

Oh
Oh
Oh
Oh

1 m Membersihkan lapangan dan perataan


SNI 03-2835-2002
Upah Pekerja
0.100 Oh
Mandor
0.005 Oh

x
x
x
x

Rp
Rp
Rp
Rp
Jumlah (2)
Jumlah (1) + (2)

6.8

x Rp
x Rp
Jumlah

SNI 2835:2008
PT

PT

PT

PT

PT

6.1.

Menggali 1 m3
SNI 2835:2008
Upah Pekerja
Mandor

tanah biasa sedalam 1 meter


0.750 Oh
0.025 Oh

x Rp.
x Rp.
Jumlah (1)

6.7.

Mengerjakan 1 m2 stripping tebing setinggi 1 meter


SNI 2835:2008
Upah Pekerja
0.050 Oh x Rp.
Mandor
0.005 Oh x Rp.
Jumlah
6.8.

Membuang 1 m3 tanah sejauh 15 meter


SNI 2835:2008
Upah Pekerja
0.330 Oh
Mandor
0.010 Oh

6.11.

Mengurug 1 m3 pasir urug


SNI 2835:2008
Bahan Pasir urug

1.200 M

x Rp.
Jumlah (1)

0 = Rp.
= Rp.

0.00
0.00

Upah Pekerja
Mandor

0.300 Oh
0.010 Oh

x Rp.
0 = Rp.
x Rp.
0 = Rp.
Jumlah (2)
= Rp.
Jumlah (1) + (2)
= Rp.

0.00
0.00
0.00
0.00

6.15a Menimbun 1 m3 tanah


SNI 2835:2008
Bahan Tanah timbun

1.200 M

x Rp.
Jumlah (1)

0 = Rp.
= Rp.

0.00
0.00

Upah Pekerja
Mandor

0.250 Oh
0.025 Oh

x Rp.
0 = Rp.
x Rp.
0 = Rp.
Jumlah (2)
= Rp.
Jumlah (1) + (2)
= Rp.

0.00
0.00
0.00
0.00

SNI 6897:2008
PD

PEKERJAAN DINDING

6.7.

Memasang 1m2 dinding bata merah tebal 1/2 bata, camp. 1PC : 2 PP
SNI 6897:2008
Bahan Bata merah
70.000 Bh x Rp.
0 = Rp
Semen portland
18.950 Kg x Rp.
0 = Rp
Pasir pasang
0.038 M x Rp.
0 = Rp
Jumlah (1)
= Rp
Upah Pekerja
Tukang batu
Kepala tukang
Mandor

PD

0.300
0.100
0.010
0.015

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)

0
0
0
0

=
=
=
=
=
=

0.00
0.00
0.00
0.00

Rp
Rp
Rp
Rp
Rp
Rp

0.00
0.00
0.00
0.00
0.00
0.00

Memasang 1m2 dinding bata merah tebal 1/2 bata, camp. 1PC : 3 PP
SNI 6897:2008
Bahan Bata merah
70.000 Bh x Rp.
0 = Rp
Semen portland (PC)
14.370 Kg x Rp.
0 = Rp
Pasir pasang
0.040 M x Rp.
0 = Rp
Jumlah (1)
= Rp

0.00
0.00
0.00
0.00

6.8.

Upah Pekerja
Tukang batu
Kepala tukang
Mandor

PD

18

0.300
0.100
0.010
0.015

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)

0
0
0
0

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

0.00
0.00
0.00
0.00
0.00
0.00

Memasang 1m2 dinding bata merah tebal 1/2 bata, camp. 1PC : 4 PP
SNI 6897:2008
Bahan Bata merah
70.000 Bh x Rp.
0 = Rp
Semen portland (PC)
11.500 Kg x Rp.
0 = Rp
Pasir pasang
0.043 M x Rp.
0 = Rp
Jumlah (1)
= Rp

0.00
0.00
0.00
0.00

6.9.

Upah Pekerja
Tukang batu
Kepala tukang
Mandor

0.300
0.100
0.010
0.015

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)

0
0
0
0

=
=
=
=
=
=

Rp
Rp
Rp
Rp
Rp
Rp

0.00
0.00
0.00
0.00
0.00
0.00

SNI 2837:2008

HARGA SATUAN PEKERJAAN PLESTERAN

19

PPL 6.1.

Memasang 1 m2 Plesteran 1 PC : 1 PP, tebal 15 mm


SNI 2837:2008
Bahan Semen portland (PC)
15.504 Kg
x Rp.
Pasir pasang
0.016 M
x Rp.
Jumlah (1)

0 = Rp.
0 = Rp.
= Rp.

0.00
0.00
0.00

Upah Pekerja
Tukang batu
Kepala tukang
Mandor

0
0
0
0

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
0.00
0.00
0.00
0.00

Memasang 1 m2 Plesteran 1 PC : 2 PP, tebal 15 mm


SNI 2837:2008
Bahan Semen portland (PC)
10.224 Kg
x Rp.
Pasir pasang
0.020 M
x Rp.
Jumlah (1)

0 = Rp.
0 = Rp.
= Rp.

0.00
0.00
0.00

Upah Pekerja
Tukang batu
Kepala tukang
Mandor

0
0
0
0

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
0.00
0.00
0.00
0.00

0
0
0
0
0

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
0.00
0.00
0.00
0.00

=
=
=
=
Jumlah (2)
=
Jumlah (1) +(2) =

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

0.00
0.00
0.00
0.00
0.00
0.00

0 = Rp.
0 = Rp.
0 = Rp.
= Rp.

0.00
0.00
0.00
0.00

0
0
0
0

0.00
0.00
0.00
0.00
0.00
0.00

0.300
0.150
0.015
0.015

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)

=
=
=
=
=
=

PPL 6.2.

PS

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.
Jumlah (2)
Jumlah (1) + (2)

6.15.

Memasang 1 m' pipa beton, diameter 30 cm - 100 cm


SNI T-15-2002
Bahan Pipa beton
1.100
M' x Rp.
Batu bata
55.000 Bh x Rp.
Semen portland
10.300 Kg x Rp.
Pasir pasang
0.061
M x Rp.
Pasir urug
0.069
M x Rp.
Jumlah (1)
Upah Pekerja
Tukang batu
Kepala tukang
Mandor

PS

0.300
0.150
0.015
0.015

Memasang 1 m' bodem 30 cm


SNI T-15-2002
Bahan Bodem
Semen portland
Pasir

0.380
0.190
0.019
0.019

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

1.100
2.575
0.015

bh x Rp.
kg x Rp.
M3 x Rp.

0
0
0
0

6.40

Jumlah (1)
Upah Pekerja
Tukang
Kepala tukang
Mandor

0.100
0.050
0.005
0.005

Oh
Oh
Oh
Oh

x
x
x
x

Rp.
Rp.
Rp.
Rp.

Jumlah (2)
Jumlah (1) +(2)

=
=
=
=

Rp.
Rp.
Rp.
Rp.

RENCANA ANGGARAN BIAYA


NAMA PEKERJAAN

: PEKERJAAN DRAINASE

LOKASI

: Desa Sialang Muda

TAHUN ANGGARAN

: ...

NO
1

URAIAN

ANALISA

VOLUME

SATUAN

HARGA SATUAN (
Rp )

JUMLAH ( Rp )

PEKERJAAN PENDAHULUAN

Bowplank

SNI 03-2835-2002

100.00

0.00

Stripping

SNI 2835:2008

180.00

0.00

Galian Tanah

SNI 2835:2008

132.60

0.00

II

PEKERJAAN DRAINASE

Pekerjaan Pas bata drainase

SNI 6897:2008

162.00

0.00

Pasir urug u/ alas bodem

SNI 2835:2008

3.50

0.00

Pasang bodem

SNI T-15-2002

100.00

0.00

Plaster dinding dalam drainase

SNI 2837:2008

192.00

0.00

IV

PEKERJAAN LAIN-LAIN

Pebersihan Akhir

1.00

Ls

350,000.00

Foto dokumentasi Proyek

1.00

Ls

320,000.00

350,000.00
320,000.00
670,000.00
TOTAL

#VALUE!

PPN 10 %

#VALUE!

GRAND TOTAL

#VALUE!

DIBULATKAN

#VALUE!

PEKERJAAN DRAINASE PANJANG 100m

Pekerjaan

Pekerjaan Drainase

Lokasi

Desa Sialang Muda

Tahun Aggaran

...

PEKERJAAN
I
1
2
3

PEKERJAAN PENDAHULUAN
Bowpalnk
Stripping
Galian Tanah

I
1

Pekejaan Drainase
Pekerjaan Pas bata drainase

PERHITUNGAN
Panjang

Lebar

100.00
100.00
100.00

1.00
1.80
1.30

100.00

0.81

Tinggi

1.02

Berat

Jumlah

Unit

Satuan

100.00
180.00
132.60

Total

162.00
162.00

m
m

3.50

Total

3.50
3.50

m
m

Total

100.00
100.00

m
m

2.00
Total

192.00
192.00

m
m

1.00
1.00

Ls
Ls

180.00
132.60

81.00

0.05

Volume

Pasir urug u/ alas bodem

100.00

0.70

Pasang bodem

100.00

100.00

Plaster dinding dalam drainase

100.00

0.96

96.00

II
1
2

PEKERJAAN LAIN-LAIN
Pebersihan Akhir
Foto dokumentasi Proyek

2.00

m
m