Vous êtes sur la page 1sur 1

9/11/2015

::BuildingPermitOrder::

Home

BUILDINGPERMISSIONDETAILS
To

ViewOSRTImage

SMT.G.NAGASHOBA

82272/65,SHOUKATNAGAR,BANJARAHILL,ROADNO.3,HYDERABAD
MobileNo:9849033239

FileNo:
PermitNo:
Date:

33113/21/07/2015/C10
44036/DC/CZ/Cir10/2015
12AUG2015

Sir/Madam,
Sub:BuildingPermissionSanctionedReg.
Ref:YourApplicationdated:21JUL2015.u/s388,428&433ofHMCAct,1955andA.P.UrbanAreas(Dev),Act,1975.
***************************
Yourapplicationsubmittedinthereferencehasbeenexaminedwithreferencetotherulesandregulationsinforceandpermissionisherebysanctioned
conditionallyasdetailedbelow:
A.ApplicantAndLicensedpersonnelDetails
1.ApplicantName:

SMT.G.NAGASHOBA

2.Developer/Builder/Owner:

Lic.No.:

3.Architecture/Surveyor/CivilEngg:

SriMirAsadAliKamran

Lic.No.:

50/Eng/TP10/GHMC/20142019

4.StructuralEngineer:

Lic.No.:

5.Others:

B.SiteDetails
1.Sy.No.:

2.Door.No.:

82272/65

3.PlotNo.:

4.Loacality:

BANJARAHILLS,10

C.DetailsofPermissionSanctioned:Usage=ResidentialParking=+GroundFloors=GOtherFloors=1
1.Floors:

G+1

2.TotalBuiltupArea:

3.ParkingFloors:

4.Areaofparkingfloors:

Front

Rear

SideI

SideII

3.00

6.SiteArea(m2):

102.22

7.TotlotArea(m2):

8.Roadaffectedarea(m2):

28.04

9.Height(m):

10.NetSiteArea(m2):

74.18

11.Others:

5.Setbacks(m):

52.26
0

D.DetailsofFeesPaid(Rs.):
1.BuildingPermitFee:

1660

2.Citylevelinfrastructureimpactfee:

3.Developmentcharges:

9204

4.CDACharges:

5.Bettermentcharges(builtuparea):

5600

6.OpenspaceConstributionCharges:

7.R.W.Hcharges:

448

8.Others:

9.V.L.Tcharges:

20186

10.Ext.BettermentCharges(onsitearea):

11.SubDivisioncharges:

12.Impactfee:

13.CompoundingFee:

14.Layoutregulationcharges:

15.ChallanNo:

974/94&974/97

16.ChallanDate:

03AUG2015

17.TotalFee:

37098

E.OtherDetails
1.Contractor'sallRiskPolicyNo.:

Date:

12AUG2015

ValidUpto:

12AUG2015

2.NotarisedAffidavitNo.:

Date:

12AUG2015

FloorHandedOver:

3.EnteredinPPWRSl.No.:

Date:

12AUG2015

S.R.O:

F.ConstructiontobeCommencedBefore

Wednesday,August12,2015

G.ConstructiontobeCompletedBefore

Sunday,August12,2018

Note:PleaseobtainOccupencyCertificatefromGHMCbeforeoccupationofthebuilding.

MortigageArea(m2):

PlanNotavaliable

SiteBestviewedin1024*768/IE7(Designed,Developed&MaintainedbyITDepartment,GHMC.)

http://www.ghmc.gov.in/approvedplans_1/buildingpermitorder_ins1.asp?finid=33113/21/07/2015/C10

1/1

Vous aimerez peut-être aussi