INDIAN SCHOOL OF MINES

AJM & WJM


DEPARTMENT OF MECHANICAL ENGINEERING
(Spl. In manufacturing engg.)
Presented By:Shabbir Ali
Kanhaiya Saw
Vikas kumar
Dharmendra kr.
Prasad
Rachit Ranjan

2.
=894m/s
diameter of orifice=0.3mm

Take

Problem 3 : Material removal rate in AJM is 0.5


mm3/sec, mass flow rate of abrasive is 3gm/min, density
is 3 gm/CC and grit size is 60 microns . calculate the
indentation radius.
Data Given:
Material removal rate = 0.5 mm3/sec.
Abrasive grain size = 60 microns = 6x10-3 mm
Mass flow rate of abrasives,= 3gm/min = 3x 10-3/60
kg/sec

Density of the grit


=3gm/cc
mass of grit
mg 6 d g 3

mrr=vol. of material removal


(mass flow rate /
(mass of abrasive
of abrasive)
grit)

0.5 10

2
r 3 147440.4
3

3 0.5 10 6

2 147440.4

1.62 10 12
r 1.17 104 m