Vous êtes sur la page 1sur 1

DATE : MAY 2007

PROJECT: NOZHA CITY CENTER


SUBJECT : ESTIMATE COOLING LOAD CALCULATIONS FOR SECOND FLOOR
AREA HEIGHT
SERIAL
1

NO. OF

REV.

F.A PER TOTAL F.A

COOLING

WATER

ZONE NAME
OFFICES

TOTAL
T.R./M2

M2

PERSONS PERSON CFM

70

4.0

16

CAPACITY T.R.

GPM

112

3.5

CFM

CFM
20.0

design data effected

F.A % ONE A/C

NOTES
PER T.R Lighting W/F2 EQ.KW EQ.W/F2

1770

165

506

4.0

0.7

1.0

TREATED F.A

MEETING ROOM

37

4.0

19

130

2.8

13.2

935

14

87

334

3.0

0.4

1.0

TREATED F.A

RECEPTION & POOL

161

4.0

81

596

6.4

11

25.2

1920

31

379

300

3.0

1.6

1.0

TREATED F.A

MECHANICAL ROOM

1100

5.0

25

100

38.0

63

28.9

21000

3235

553

2.0

59.0

1368

837

50.7

TOTAL FRESH AIR FOR THE SECOND FLOOR =

837

CFM

TOTAL TREATED FRESH AIR FOR THE SECOND FLOOR =

837

CFM

TOTAL LOAD TREATED FRESH AIR FOR THE SECOND FLOOR=


TOTAL LOAD OF THE SECOND FLOOR WITH OUT F/A =

TOTAL LOAD OF THE SECOND FLOOR =

56.3 TR

TR

56.3

TR

Vous aimerez peut-être aussi