Académique Documents
Professionnel Documents
Culture Documents
z
Pre Casting
Project:
Type of Structure:
Section Identification:
Date of Inspection:
Date of Proposed Casting:
Curing Proposed?
Yes/No
Curing Period
Days
Curing Type:
Water
Burlap (Wetted)
Sand/Water
Plastic
Yes/No
Yes/No
Yes/No
Yes/No
Yes/No
Type
Inspected by:
Witnessed by:
- 23 -
Specification
28 days
Cement
Type:
Content:
Content:
Other
Type:
Content:
Aggregates
Type
Coarse:
Fine:
Admixtures
Inspected by:
Witnessed by:
Date:
- 24 -
Post Casting
Volume of Concrete:
Cast Section Identification:
Date of Inspection:
Date of Casting:
Date of Formwork Removed:
Curing Applied? Yes/No
Curing Period
Days
Curing Type:
Water
Burlap (Wetted)
Plastic
Sand/Water
Chemical
Formwork
Condition Report:
Evidence of Honeycombing?
Yes/No/Photo
Evidence of Cracking?
Yes/No/Photo
Yes/No/Photo
Exposed rebar
Yes/No/Photo
Yes/No/Photo
Waterbar Installed
Yes/No
Cleaning required?
All defects to be described in detail, including location, extent, apparent depth, etc.
Inspected by:
Witnessed by:
- 25 -