DESCRIPTION
REMARKS
DATE TO COMPLETE
PS AD2 SNAGS
1
DEODORIZER
D
E
F
2.
3.
LIFTING BEAM
A
B
C
MCC
/var/www/apps/conversion/tmp/scratch_5/289585901.doc
Done
The H2S level is high in inlet
manholes. Hence not in Danways
scope
Done (Copy of calculations resubmitted)
Duct work not in PVC ( Mat. Specs
to be submitted)
Damper handle to be replaced
Condensate drain to add
DONE
30.11.05 YET TO DO
30.11.05 YET TO DO
30.11.05 IN PROGRESS
OK
OK
OK
Done
Done
To do
Provided as approved & accepted
by DA
1/11
SL NO
B
C
D
E
F
G
H
I
J
K
L
M
N
DESCRIPTION
PORTABLE EMERGENCY LAMP TO BE INSTALLED IN THE MCC
ROOM
DUTY LEVEL TO BE INDICATED ON THE MCC DOOR ON ENGRAVED
PLATE
THE WINDOW AIR CONDITIONING UNIT SEEMS TO BE OF LESS
CAPACITY. TO BE CLARIFIED.
THE MCC BUSBARS ARE TO BE SLEEVED.
HEAT SENSING WIRES TO BE RUN IN THE MCC COMPARTMENTS
AND CONNECTED TO THE FIRE ALARM AND SUPPLY SHOULD TRIP
IN CASE OF ALARM
CABLE JUNCTION TO BE MARKED
PUMP TRIPS EVERY DAY DUE TO IMPELLER BLOCKAGE, TO BE
CHECKED.
THE LIGHTING IN THE MCC ROOM IS VERY POOR
THE MCC SHOULD BE EXTENDED TO ACCOMMODATE THE
LIGHTING SMALL POWER SO THAT THE WALL MOUNTED
DISTRIBUTION BOARDS ARE AVOIDED.
REMARKS
To do
To do
Copy of calculations to be
submitted
Metallic shrouding provided as per
mfr standard as approved &
accepted by D.A
Not specified
2 Nos J.Bs in MCC room to be
marked
Done
Provided as specified.
Provided as approved & accepted
by D.A
Pressure sensors to be checked for
correct operation
/var/www/apps/conversion/tmp/scratch_5/289585901.doc
2/11
DATE TO COMPLETE
30.12.05
IN PROGRESS TO DO
30.11.05
IN PROGRESS TO DO
OK
30.11.05
IN PROGRESS TO DO
IN PROGRESS - TO DO
IN PROGRESS TO DO
30.12.05
IN PROGRESS TO DO
30.11.05
IN PROGRESS TO DO
DONE
DONE
SL NO
DESCRIPTION
REMARKS
To be improved by Kahraamaa as it
is affecting pump performance.
STORE / TOILET
NO THOUGH AIRFLOW
WET WELL
A
B
VALVE CHAMBER
A
B
FLOWMETER CHAMBER
/var/www/apps/conversion/tmp/scratch_5/289585901.doc
TCC Scope
TCC scope
Accepted during site inspection
TCC Scope
3/11
DATE TO COMPLETE
SL NO
DESCRIPTION
GENERAL
PS AD2A SNAGS
DEODORIZER
A
B
B
C
D
E
F
D
SL NO
REMARKS
TCC Scope
DONE
Done
To do
30.11.05
TCC scope
30.11.05
TO BE CHECKED
DONE
To do
Done
TCC scope
Done
Done
Done (Copy of calculations to be
resubmitted)
Duct work not in PVC (Mat.Specs
to be submitted)
DESCRIPTION
/var/www/apps/conversion/tmp/scratch_5/289585901.doc
DATE TO COMPLETE
REMARKS
4/11
DONE
DONE
DONE
MAT.SPEC TO BE SUBMITTED
DATE TO COMPLETE
E
F
G
H
LIFTING BEAM
A
B
MCC
A
B
C
D
E
SL NO
TO DO & CHECKED
TO DO & CHECKED
TO DO
Done
Done
DONE
DONE
TO DO
30.12.05 TO DO
To do
30.11.05- TO DO
To do
Metalic shrouding provided as per
mfr standard, as approved &
accepted by D.A
Not specified
DESCRIPTION
/var/www/apps/conversion/tmp/scratch_5/289585901.doc
30.11.05
REMARKS
5/11
DATE TO COMPLETE
F
G
H
I
J
K
5
STORE / TOILET
NO THOUGH AIRFLOW
WET WELL
A
B
SL NO
30.11.05- TO DO
C
D
DONE
Done
To do
30.11.05 TO DO
TCC Scope
TCC Scope
Done
DESCRIPTION
/var/www/apps/conversion/tmp/scratch_5/289585901.doc
30.11.05 TO DO
To do
TCC scope
REMARKS
6/11
DATE TO COMPLETE
VALVE CHAMBER
A
B
C
FLOWMETER CHAMBER
GENERAL
SL NO
DESCRIPTION
B
C
/var/www/apps/conversion/tmp/scratch_5/289585901.doc
30.11.05 TO DO
TCC Scope
TCC scope
DONE
DONE
Done
Done
TCC Scope
Done
RESUBMITTED
REMARKS
7/11
DATE TO COMPLETE
F
G
LOCKING SYSTEM FOR THE WET WELL COVERS & VALVE COVERS
ARE NOT WORKING.
WATER PUMP DELIVERY LINE IS LEAKING.
TCC Scope
TCC Scope
PS AD2B SNAGS
1
GENERATOR BOX
DEODORIZER
A
B
D
E
F
G
Done
To Do
Done (copy of calculations to be
CHECK CALCS FOR AIR INLET (COWL)
resubmitted)
Ductwork not in PVC(Mat specs to
DUCTWORK IN PVC IS NOT ACCEPTABLE (BETWEEN FAN & VESSEL) be submitted)
VALVES IN PVC ARE NOT ACCEPTABLE
Damper handle to be replaced
TRAP REQUIRED ON DRAIN SUMP
TCC Scope
NO CONDENSATE DRAIN FOR DRAIN
To do
SL NO
30.11.05
30.11.05
Done
DESCRIPTION
/var/www/apps/conversion/tmp/scratch_5/289585901.doc
REMARKS
8/11
DATE TO COMPLETE
LIFTING BEAM
A
B
MCC
B
C
D
E
F
G
H
SL NO
DONE
DONE
Done
Done
DESCRIPTION
/var/www/apps/conversion/tmp/scratch_5/289585901.doc
TO DO - 30.11.05
REMARKS
9/11
DATE TO COMPLETE
IN THE MCC ROOM THE CABLE TRAYS FIXED TO THE WALL SHOULD
BE PROVIDED WITH COVERS UPTO A HEIGHT OF 1 MTR FROM THE
FLOOR.
To do
SHROUDING OF TERMINATIONS TO BE DONE IN MCC MAIN
INCOMER AND GENERATOR SECTION.
Done
STORE / TOILET
NO THOUGH AIRFLOW
7
A
B
C
D
WET WELL
WARNING SIGN TO BE BOTH IN ARABIC & ENGLISH
NO WET WELL WASHDOWN FACILITY
THE ACCESS LADDER TO THE PUMP IS SLANTED & TO BE MADE
STRAIGHT.
PUMPS CABLE TO BE REMOVED.
VALVE CHAMBER
A
B
FLOWMETER CHAMBER
SL NO
TO DO -30.11.05
TCC Scope
TCC Scope
Done
DESCRIPTION
/var/www/apps/conversion/tmp/scratch_5/289585901.doc
TO DO - 30.11.05
To do
TCC Scope
REMARKS
10/11
DATE TO COMPLETE
10
GENERAL
B
C
D
E
/var/www/apps/conversion/tmp/scratch_5/289585901.doc
TCC Scope
TCC Scope
Done
Done
TCC Scope
TCC Scope
11/11