Vous êtes sur la page 1sur 11

SL NO

DESCRIPTION

REMARKS

DATE TO COMPLETE

PS AD2 SNAGS
1

DEODORIZER

CONNECT EARTH TAPE WITH CABLE BACK TO MCC

H2S LEVEL IS HIGH

CHECK CALCS FOR AIR INLET (COWL)

D
E
F

DUCTWORK IN PVC IS NOT ACCEPTABLE (Between Fan & Vessel)


VALVES IN PVC ARE NOT ACCEPTABLE
NO CONDENSATE DRAIN FOR PREFILTER

2.

PUMP JUNCTION BOXES

CABLE TIES USED

3.

LIFTING BEAM

A
B
C

SIZE / WIDTH OF TRAVELING BEAM TO BE CHECKED


EXTRA LINK REQUIRED ON MAIN CHAIN
HOIST TO BE OVERHAULED

MCC

DB IS NOT IN THE PANEL, IS BURIED TYPE AND IS NOT LABELED.

/var/www/apps/conversion/tmp/scratch_5/289585901.doc

Done
The H2S level is high in inlet
manholes. Hence not in Danways
scope
Done (Copy of calculations resubmitted)
Duct work not in PVC ( Mat. Specs
to be submitted)
Damper handle to be replaced
Condensate drain to add

PVC trunking to fix inside J.B

DONE

30.11.05 YET TO DO
30.11.05 YET TO DO

30.11.05 IN PROGRESS

OK
OK
OK

Done
Done
To do
Provided as approved & accepted
by DA
1/11

NOT IN DANWAY SCPE

SL NO
B
C
D
E
F
G
H
I
J
K
L
M
N

DESCRIPTION
PORTABLE EMERGENCY LAMP TO BE INSTALLED IN THE MCC
ROOM
DUTY LEVEL TO BE INDICATED ON THE MCC DOOR ON ENGRAVED
PLATE
THE WINDOW AIR CONDITIONING UNIT SEEMS TO BE OF LESS
CAPACITY. TO BE CLARIFIED.
THE MCC BUSBARS ARE TO BE SLEEVED.
HEAT SENSING WIRES TO BE RUN IN THE MCC COMPARTMENTS
AND CONNECTED TO THE FIRE ALARM AND SUPPLY SHOULD TRIP
IN CASE OF ALARM
CABLE JUNCTION TO BE MARKED
PUMP TRIPS EVERY DAY DUE TO IMPELLER BLOCKAGE, TO BE
CHECKED.
THE LIGHTING IN THE MCC ROOM IS VERY POOR
THE MCC SHOULD BE EXTENDED TO ACCOMMODATE THE
LIGHTING SMALL POWER SO THAT THE WALL MOUNTED
DISTRIBUTION BOARDS ARE AVOIDED.

REMARKS
To do
To do
Copy of calculations to be
submitted
Metallic shrouding provided as per
mfr standard as approved &
accepted by D.A
Not specified
2 Nos J.Bs in MCC room to be
marked
Done
Provided as specified.
Provided as approved & accepted
by D.A
Pressure sensors to be checked for
correct operation

PRESSURE GAUGES TO BE CALIBRATED


THE PUMP CAPACITY RATING NAME PLATE SHALL BE FIXED IN
EACH OF THE SUBMERSIBLE PUMP COMPARTMENTS.
To do
IN THE MCC ROOM THE CABLE TRAYS FIXED TO THE WALL SHOULD
BE PROVIDED WITH COVERS UPTO A HEIGHT OF 1 MTR FROM THE
FLOOR.
Done
SHROUDING OF TERMINATIONS TO BE DONE IN MCC MAIN
INCOMER AND GENERATOR SECTION.
Done

/var/www/apps/conversion/tmp/scratch_5/289585901.doc

2/11

DATE TO COMPLETE
30.12.05
IN PROGRESS TO DO
30.11.05
IN PROGRESS TO DO
OK

30.11.05
IN PROGRESS TO DO
IN PROGRESS - TO DO
IN PROGRESS TO DO
30.12.05
IN PROGRESS TO DO
30.11.05
IN PROGRESS TO DO
DONE
DONE

SL NO

DESCRIPTION

REMARKS
To be improved by Kahraamaa as it
is affecting pump performance.

MAIN INCOMING VOLTAGE WAS LESS (400 VOLT)

STORE / TOILET

NO THOUGH AIRFLOW

WET WELL

A
B

NO WET WELL WASHDOWN FACILITY


CABLE DUCT BETWEEN WET WELL AND PUMP JUNCTION BOX
SMALL. TO BE ENLARGED WITH A DUCT THREE TIMES TOTAL
CABLE DIAMETER.

VALVE CHAMBER

A
B

SUITABLE ACCESS OPENINGS WITH COVER RIGHT ABOVE THE


VALVES AND NRVS TO BE MADE IN THE VALVE CHAMBER OR SMALL
LIFTING BEAMS REQUIRED. ALSO THE CHAMBER SUMP IS
PARTIALLY BLOCKED BY THE LADDER.
TCC Scope
VENTILATION OPENING REQUIRED IN ROOF.
TCC Scope

FLOWMETER CHAMBER

ACCESS OPENING WITH COVER TO BE MADE ABOVE THE FLOW


METER SENSOR IN THE FLOW METER CHAMBER. ALSO HOLDING
HANDLE RAIL TO BE PROVIDED TO ENTER THE LADDER ACCESS.

/var/www/apps/conversion/tmp/scratch_5/289585901.doc

TCC Scope

TCC scope
Accepted during site inspection

TCC Scope
3/11

DATE TO COMPLETE

SL NO

DESCRIPTION

GENERAL

WATER METER SERVICE CABINET IS NOT INSTALLED


ALL OUT SIDE CABLES TO BE COVERED BY METAL TRAY,
ESPECIALLY OVER THE BENDS.
PUMP OUT PUT TO BE CHECKED AND CORRECTED IF NECESSARY.
DRAWINGS IN O & M MANUALS REQUIRED FOR RISING MAIN
PROFILE AND PUMP DESIGN CALCULATIONS, TOGETHER WITH AIR
VALVE CHAMBERS, WASHOUT (IF FITTED) AND DISCHARGE
CHAMBER.
THE MANUALS PUMP DETAILS AND SPEC IS NOT MATCHING WITH
THE PUMP AT THE SITE TO BE CLARIFIED.
NO OFFICIAL REPLY FOR O & M SNAGS REF. (OM/25 DATED ON
16/02/05).
LOCKING SYSTEM FOR THE WET WELL COVERS & VALVE COVERS
ARE NOT WORKING.

PS AD2A SNAGS
DEODORIZER

A
B

CONNECT EARTH TAPE WITH CABLE BACK TO MCC


EXHAUST STACK TO BE RAISED ABOVE ROOF

CHECK CALCS FOR AIR INLET (COWL)


DUCTWORK IN PVC IS NOT ACCEPTABLE (BETWEEN FAN &
VESSEL)

B
C

D
E
F

D
SL NO

REMARKS

TCC Scope
DONE
Done
To do

30.11.05

TCC scope
30.11.05
TO BE CHECKED
DONE

To do
Done
TCC scope

Done
Done
Done (Copy of calculations to be
resubmitted)
Duct work not in PVC (Mat.Specs
to be submitted)

DESCRIPTION

/var/www/apps/conversion/tmp/scratch_5/289585901.doc

DATE TO COMPLETE

REMARKS
4/11

DONE
DONE
DONE
MAT.SPEC TO BE SUBMITTED
DATE TO COMPLETE

E
F
G
H

VALVES IN PVC ARE NOT APPLICABLE


TRAP REQUIRED ON DRAIN SUMP
NO CONDENSATE DRAIN FOR PREFILTER
REGENERATION PIPEWORK TO BE EXTENDED TO THE DRAIN PIT

PUMP JUNCTION BOXES

CABLE TIES USED

LIFTING BEAM

A
B

SIZE / WIDTH OF TRAVELING BEAM TO BE CHECKED


EXTRA LINK REQUIRED ON MAIN CHAIN

MCC

A
B
C
D
E
SL NO

DB IS NOT IN THE PANEL, IS BURIED TYPE AND IS NOT LABELED.


PORTABLE EMERGENCY LAMP TO BE INSTALLED IN THE MCC
ROOM
DUTY LEVEL TO BE INDICATED ON THE MCC DOOR ON ENGRAVED
PLATE
THE MCC BUSBARS ARE TO BE SLEEVED.
HEAT SENSING WIRES TO BE RUN IN THE MCC COMPARTMENTS
AND CONNECTED TO THE FIRE ALARM AND SUPPLY SHOULD TRIP
IN CASE OF ALARM

TO DO & CHECKED
TO DO & CHECKED

PVC trunking to fix inside J.B

TO DO

Done
Done

DONE
DONE

Provided as approved & accepted


by D.A

TO DO
30.12.05 TO DO

To do
30.11.05- TO DO
To do
Metalic shrouding provided as per
mfr standard, as approved &
accepted by D.A

AS APPROVED & ACCEPTED.

Not specified

DESCRIPTION

/var/www/apps/conversion/tmp/scratch_5/289585901.doc

30.11.05

Damper handle to be replaced


TCC Scope
To do
To do

REMARKS
5/11

DATE TO COMPLETE

F
G
H

CABLE JUNCTION TO BE MARKED


THE MCC SHOULD BE EXTENDED TO ACCOMMODATE THE
LIGHTING SMALL POWER SO THAT THE WALL MOUNTED
DISTRIBUTION BOARDS ARE AVOIDED.
THE PUMP CAPACITY RATING NAME PLATE SHALL BE FIXED IN
EACH OF THE SUBMERSIBLE PUMP COMPARTMENTS.
IN THE MCC ROOM THE CABLE TRAYS FIXED TO THE WALL
SHOULD BE PROVIDED WITH COVERS UPTO A HEIGHT OF 1 MTR
FROM THE FLOOR.

I
J
K
5

STORE / TOILET

NO THOUGH AIRFLOW

WET WELL

A
B

WARNING SIGN TO BE BOTH IN ARABIC & ENGLISH


NO WET WELL WASHDOWN FACILITY
THE ACCESS LADDER TO THE PUMP IS SLANTED & TO BE MADE
STRAIGHT.
PUMPS CABLE TO BE REMOVED.

SL NO

30.11.05- TO DO

Provided as approved & accepted


by D.A
30.11.05 TO DO
To do
30.11.05 TO DO
To do

SHROUDING OF TERMINATIONS TO BE DONE IN MCC MAIN


INCOMER AND GENERATOR SECTION.
Pump J.Bs to be labeled

C
D

2 Nos j.Bs in MCC room to be


marked

DONE
Done
To do

30.11.05 TO DO

TCC Scope

TCC Scope
Done

DESCRIPTION

/var/www/apps/conversion/tmp/scratch_5/289585901.doc

30.11.05 TO DO

To do
TCC scope

REMARKS
6/11

DATE TO COMPLETE

VALVE CHAMBER

A
B
C

SUITABLE ACCESS OPENINGS WITH COVER RIGHT ABOVE THE


VALVES AND NRVS TO BE MADE IN THE VALVE CHAMBER OR SMALL
LIFTING BEAMS REQUIRED. ALSO THE CHAMBER SUMP IS
PARTIALLY BLOCKED BY THE LADDER.
TCC Scope
VENTILATION OPENING REQUIRED IN ROOF
TCC Scope
SURGE VESSEL AIR INLET VALVE TO BE CLEANED
To do

FLOWMETER CHAMBER

ACCESS OPENING WITH COVER TO BE MADE ABOVE THE FLOW


METER SENSOR IN THE FLOW METER CHAMBER. ALSO HOLDING
HANDLE RAIL TO BE PROVIDED TO ENTER THE LADDER ACCESS.

GENERAL

WATER METER SERVICE CABINET IS NOT INSTALLED


ALL OUT SIDE CABLES TO BE COVERED BY METAL TRAY,
ESPECIALLY OVER THE BENDS.
PUMP OUT PUT TO BE CHECKED AND CORRECTED IF NECESSARY.
DRAWINGS IN O & M MANUALS REQUIRED FOR RISING MAIN
PROFILE AND PUMP DESIGN CALCULATIONS, TOGETHER WITH AIR
VALVE CHAMBERS, WASHOUT (IF FITTED) AND DISCHARGE
CHAMBER.
NO OFFICIAL REPLY FOR O & M SNAGS REF. (OM/25 DATED ON
18/02/05).

SL NO

DESCRIPTION

B
C

/var/www/apps/conversion/tmp/scratch_5/289585901.doc

30.11.05 TO DO

TCC Scope

TCC scope
DONE
DONE

Done
Done

TCC Scope
Done

RESUBMITTED
REMARKS

7/11

DATE TO COMPLETE

F
G

LOCKING SYSTEM FOR THE WET WELL COVERS & VALVE COVERS
ARE NOT WORKING.
WATER PUMP DELIVERY LINE IS LEAKING.

TCC Scope
TCC Scope

PS AD2B SNAGS
1

GENERATOR BOX

GENERATOR JUNCTION BOX TO BE RELOCATED.

DEODORIZER

A
B

CONNECT EARTH TAPE WITH CABLE BACK TO MCC


EXHAUST STACK TO BE RAISED ABOVE ROOF

Provided in approved location

D
E
F
G

Done
To Do
Done (copy of calculations to be
CHECK CALCS FOR AIR INLET (COWL)
resubmitted)
Ductwork not in PVC(Mat specs to
DUCTWORK IN PVC IS NOT ACCEPTABLE (BETWEEN FAN & VESSEL) be submitted)
VALVES IN PVC ARE NOT ACCEPTABLE
Damper handle to be replaced
TRAP REQUIRED ON DRAIN SUMP
TCC Scope
NO CONDENSATE DRAIN FOR DRAIN
To do

PUMP JUNCTION BOXES

CABLES NOT CONNECTED

SL NO

30.11.05

30.11.05

Done
DESCRIPTION

/var/www/apps/conversion/tmp/scratch_5/289585901.doc

REMARKS
8/11

DATE TO COMPLETE

CABLE TIES USED

LIFTING BEAM

A
B

SIZE / WIDTH OF TRAVELING BEAM TO BE CHECKED


EXTRA LINK REQUIRED ON MAIN CHAIN

MCC

DB IS NOT IN THE PANEL, IS BURIED TYPE AND IS NOT LABELED.


PORTABLE EMERGENCY LAMP TO BE INSTALLED IN THE MCC
ROOM
DUTY LEVEL TO BE INDICATED ON THE MCC DOOR ON ENGRAVED
PLATE

B
C
D
E
F
G
H
SL NO

PVC trunking to fix inside pump J.B

THE MCC BUSBARS ARE TO BE SLEEVED.


HEAT SENSING WIRES TO BE RUN IN THE MCC COMPARTMENTS
AND CONNECTED TO THE FIRE ALARM AND SUPPLY SHOULD TRIP
IN CASE OF ALARM
CABLE JUNCTION TO BE MARKED
THE MCC SHOULD BE EXTENDED TO ACCOMMODATE THE
LIGHTING SMALL POWER SO THAT THE WALL MOUNTED
DISTRIBUTION BOARDS ARE AVOIDED.
THE PUMP CAPACITY RATING NAME PLATE SHALL BE FIXED IN
EACH OF THE SUBMERSIBLE PUMP COMPARTMENTS.

DONE
DONE

Done
Done

Provided as approved & accepted


by D.A
TO DO - 30.12.05
To do
TO DO - 30.11.05
To do
Metallic shrouding provided as per
mfr standard, approved & accepted
by D.A
Not specified
2 Nos J.Bs in MCC room to be
marked.
Provided as approved & accepted
by D.A
TO DO - 30.11.05
To Do

DESCRIPTION

/var/www/apps/conversion/tmp/scratch_5/289585901.doc

TO DO - 30.11.05

REMARKS
9/11

DATE TO COMPLETE

IN THE MCC ROOM THE CABLE TRAYS FIXED TO THE WALL SHOULD
BE PROVIDED WITH COVERS UPTO A HEIGHT OF 1 MTR FROM THE
FLOOR.
To do
SHROUDING OF TERMINATIONS TO BE DONE IN MCC MAIN
INCOMER AND GENERATOR SECTION.
Done

STORE / TOILET

NO THOUGH AIRFLOW

7
A
B
C
D

WET WELL
WARNING SIGN TO BE BOTH IN ARABIC & ENGLISH
NO WET WELL WASHDOWN FACILITY
THE ACCESS LADDER TO THE PUMP IS SLANTED & TO BE MADE
STRAIGHT.
PUMPS CABLE TO BE REMOVED.

VALVE CHAMBER

A
B

SUITABLE ACCESS OPENINGS WITH COVER RIGHT ABOVE THE


VALVES AND NRVS TO BE MADE IN THE VALVE CHAMBER OR SMALL
LIFTING BEAMS REQUIRED. ALSO THE CHAMBER SUMP IS
PARTIALLY BLOCKED BY THE LADDER.
TCC scope
VENTILATION OPENING REQUIRED IN ROOF
TCC Scope

FLOWMETER CHAMBER

SL NO

TO DO -30.11.05

TCC Scope

TCC Scope
Done

DESCRIPTION

/var/www/apps/conversion/tmp/scratch_5/289585901.doc

TO DO - 30.11.05

To do
TCC Scope

REMARKS
10/11

DATE TO COMPLETE

ACCESS OPENING WITH COVER TO BE MADE ABOVE THE FLOW


METER SENSOR IN THE FLOW METER CHAMBER. ALSO HOLDING
HANDLE RAIL TO BE PROVIDED TO ENTER THE LADDER ACCESS.

10

GENERAL

WATER METER SERVICE CABINET IS NOT INSTALLED


ALL OUT SIDE CABLES TO BE COVERED BY METAL TRAY,
ESPECIALLY OVER THE BENDS.

B
C

D
E

PUMP OUT PUT TO BE CHECKED AND CORRECTED IF NECESSARY.


DRAWINGS IN O & M MANUALS REQUIRED FOR RISING MAIN
PROFILE AND PUMP DESIGN CALCULATIONS, TOGETHER WITH AIR
VALVE CHAMBERS, WASHOUT (IF FITTED) AND DISCHARGE
CHAMBER.
LOCKING SYSTEM FOR THE WET WELL COVERS & VALVE COVERS
ARE NOT WORKING.

/var/www/apps/conversion/tmp/scratch_5/289585901.doc

TCC Scope

TCC Scope
Done
Done

TCC Scope
TCC Scope

11/11