Vous êtes sur la page 1sur 2

process section

Consumption Figures
of Raw Materials and Additives
and of Energies and Utilities
Project No

Project

Acetic acid
sol.

TiO2
solution

name

Part of the documentation

605520

Thailand 1

Nitrogen

revision

Chilled
Water

date

page

created

Mller

31.05.2012

checked

Bauer

31.05.2012

1 of 2

Documentation No.

2. Process

Cooling
Water

date

all

Steam
8 bar

Steam
4 bar

2.1.3
Condensate Instrument
Air

battery limit

Lactam

Demin.
Water

Warm
Water

Electric
Power

35

AF 90 2
RF
AF 6 10%
0,3 - 0,6

380/220V5%

outlet
intermediate tank

Operating Conditions
Temperature C

35

25

30

atm.

atm.

4 10%

TemperatureC
Pressure bar g

50
16

50
16

Consumption
120

kg/h

kg/h

13,75

37,50

Pressure bar g

AF 32
RF 40
AF 6 10%
RF 3

AF 7
RF 14
AF 3 10%
0,1 - 0,3

170

145

170

30

88

50
6

100
8

100
8

180
10

160
5

180
5

50
8

100/300
25

50
8

100
8

Nm/h

m/h

m/h

kg/h

kg/h

kg/h

Nm/h

kg/h

kg/h

m/h

7 5%

4 10%

50 Hz

Design Conditions

18.6 m

10,0

kW
3,3

130
6.6 m
12.6 m
18.6 m
24.6 m
30.6 m

3
10

5,5
4

1
1
1

2491

34,6
500
6,7
6,2

140
0.6 m
6.6 m
150
0.6 m
12.6 m
18.6 m
24.6 m
30.6 m
36.6 m

340
370

340
370

1
0,5
1
1
0,5
1

40
0,25
3
3
18

0,2

160
0.6 m
24.6 m
30.6 m
36.6 m

12
40
30

0,5
0,5
0,5

45
0,37
27
215

180
0.6 m
6.6 m
12.6 m
18.6 m
24.6 m
30.6 m
36.6 m
sum

12

0,5

12,5

0,01

200
3700

1
13,75

37,5

51

276
297,5

40

710+?

3912

200
3700

0,5
3
2,5
1
17

3,5
60

49
0,1
2491

60,2

2,1

979

process section

Consumption Figures
of Raw Materials and Additives
and of Energies and Utilities
Project No

Project

Acetic acid
sol.

TiO2
solution

name

Part of the documentation

605520

Thailand 1

Nitrogen

revision

Chilled
Water

date

page

created

Mller

31.05.2012

checked

Bauer

31.05.2012

2 of 2

Documentation No.

2. Process

Cooling
Water

date

all

Steam
8 bar

Steam
4 bar

2.1.3
Condensate Instrument
Air

battery limit

Lactam

Demin.
Water

Warm
Water

Electric
Power

35

AF 90 2
RF
AF 6 10%
0,3 - 0,6

380/220V5%

outlet
intermediate tank

Operating Conditions
Temperature C
Pressure bar g

35

25

30

atm.

atm.

4 10%

AF 32
RF 40
AF 6 10%
RF 3

AF 7
RF 14
AF 3 10%
0,1 - 0,3

170

145

170

50
16

50
16

kg/h

kg/h

20

50

30

88

50
6

100
8

100
8

180
10

160
5

180
5

50
8

100/300
25

50
8

100
8

Nm/h

m/h

m/h

kg/h

kg/h

kg/h

Nm/h

kg/h

kg/h

m/h

7 5%

4 10%

50 Hz

Design Conditions
TemperatureC
Pressure bar g

Min. supply
120
18.6 m

kW

60

130
6.6 m
12.6 m
18.6 m
24.6 m
30.6 m

23
10

8
10

2
2
2

4000

50
50

40
800
12
12

140
0.6 m
6.6 m
150
*1)

0.6 m

1,5

3000

12.6 m
18.6 m
24.6 m
30.6 m

0,75
1,5
1,5
0,75

4000*2)

1,5

7000*1)

36.6 m

380
440

380
440

10

60
0,37
5
5
25

160
0.6 m
24.6 m
30.6 m
36.6 m

15
?

60
50

50
0,5
35

0,75
0,75
1000*1)

0,75

260

180

sum

0,6 m
6,6 m
18,6 m

50

24.6 m
30.6 m
36.6 m

10
40

1000

10

*1

20

20
193
50
*1) initial filling
*2) by deficiency of extract water

5
310
350

60

820+?

500

500
5200

5200

5710

6520+?

6
5
5
50

7
1000*1)

100
2

4000

5000

1500