Académique Documents
Professionnel Documents
Culture Documents
Consumption Figures
of Raw Materials and Additives
and of Energies and Utilities
Project No
Project
Acetic acid
sol.
TiO2
solution
name
605520
Thailand 1
Nitrogen
revision
Chilled
Water
date
page
created
Mller
31.05.2012
checked
Bauer
31.05.2012
1 of 2
Documentation No.
2. Process
Cooling
Water
date
all
Steam
8 bar
Steam
4 bar
2.1.3
Condensate Instrument
Air
battery limit
Lactam
Demin.
Water
Warm
Water
Electric
Power
35
AF 90 2
RF
AF 6 10%
0,3 - 0,6
380/220V5%
outlet
intermediate tank
Operating Conditions
Temperature C
35
25
30
atm.
atm.
4 10%
TemperatureC
Pressure bar g
50
16
50
16
Consumption
120
kg/h
kg/h
13,75
37,50
Pressure bar g
AF 32
RF 40
AF 6 10%
RF 3
AF 7
RF 14
AF 3 10%
0,1 - 0,3
170
145
170
30
88
50
6
100
8
100
8
180
10
160
5
180
5
50
8
100/300
25
50
8
100
8
Nm/h
m/h
m/h
kg/h
kg/h
kg/h
Nm/h
kg/h
kg/h
m/h
7 5%
4 10%
50 Hz
Design Conditions
18.6 m
10,0
kW
3,3
130
6.6 m
12.6 m
18.6 m
24.6 m
30.6 m
3
10
5,5
4
1
1
1
2491
34,6
500
6,7
6,2
140
0.6 m
6.6 m
150
0.6 m
12.6 m
18.6 m
24.6 m
30.6 m
36.6 m
340
370
340
370
1
0,5
1
1
0,5
1
40
0,25
3
3
18
0,2
160
0.6 m
24.6 m
30.6 m
36.6 m
12
40
30
0,5
0,5
0,5
45
0,37
27
215
180
0.6 m
6.6 m
12.6 m
18.6 m
24.6 m
30.6 m
36.6 m
sum
12
0,5
12,5
0,01
200
3700
1
13,75
37,5
51
276
297,5
40
710+?
3912
200
3700
0,5
3
2,5
1
17
3,5
60
49
0,1
2491
60,2
2,1
979
process section
Consumption Figures
of Raw Materials and Additives
and of Energies and Utilities
Project No
Project
Acetic acid
sol.
TiO2
solution
name
605520
Thailand 1
Nitrogen
revision
Chilled
Water
date
page
created
Mller
31.05.2012
checked
Bauer
31.05.2012
2 of 2
Documentation No.
2. Process
Cooling
Water
date
all
Steam
8 bar
Steam
4 bar
2.1.3
Condensate Instrument
Air
battery limit
Lactam
Demin.
Water
Warm
Water
Electric
Power
35
AF 90 2
RF
AF 6 10%
0,3 - 0,6
380/220V5%
outlet
intermediate tank
Operating Conditions
Temperature C
Pressure bar g
35
25
30
atm.
atm.
4 10%
AF 32
RF 40
AF 6 10%
RF 3
AF 7
RF 14
AF 3 10%
0,1 - 0,3
170
145
170
50
16
50
16
kg/h
kg/h
20
50
30
88
50
6
100
8
100
8
180
10
160
5
180
5
50
8
100/300
25
50
8
100
8
Nm/h
m/h
m/h
kg/h
kg/h
kg/h
Nm/h
kg/h
kg/h
m/h
7 5%
4 10%
50 Hz
Design Conditions
TemperatureC
Pressure bar g
Min. supply
120
18.6 m
kW
60
130
6.6 m
12.6 m
18.6 m
24.6 m
30.6 m
23
10
8
10
2
2
2
4000
50
50
40
800
12
12
140
0.6 m
6.6 m
150
*1)
0.6 m
1,5
3000
12.6 m
18.6 m
24.6 m
30.6 m
0,75
1,5
1,5
0,75
4000*2)
1,5
7000*1)
36.6 m
380
440
380
440
10
60
0,37
5
5
25
160
0.6 m
24.6 m
30.6 m
36.6 m
15
?
60
50
50
0,5
35
0,75
0,75
1000*1)
0,75
260
180
sum
0,6 m
6,6 m
18,6 m
50
24.6 m
30.6 m
36.6 m
10
40
1000
10
*1
20
20
193
50
*1) initial filling
*2) by deficiency of extract water
5
310
350
60
820+?
500
500
5200
5200
5710
6520+?
6
5
5
50
7
1000*1)
100
2
4000
5000
1500