MINISTERIO DE TRANSPORTES Y COMUNICACIONES

PROYECTO ESPECIAL DE INFRAESTRUCTURA DE TRANSPORTE NACIONAL


CONSORCIO SAN MARTIN
- H e H - ARAMSA

CONTRATISTA

SUPERVISION
LABORATORIO DE MECNICA DE SUELOS, CONCRETO Y PAVIMENTOS

ANLISIS GRANULOMTRICO POR TAMIZADO


MTC E 107, E 204 - ASTM D 422 - AASHTO T-11, T-27 Y T-88
OBRA

: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA TARAPOTO - JUANJUI

N REGISTRO :

TRAMO

: CASPIZAPA - JUANJUI

TCNICO

: L.GORDILLO

MATERIAL

: ARENA NATURAL PARA CONCRETO

ING RESP.

CALICATA

FECHA

MUESTRA

HECHO POR

: G.RAMIREZ

PROFUND.

DEL KM

CANTERA

: LIMON

AL KM

CARRIL

UBICACIN : KM 90+360 Lado / Izquierdo

4/10/2009

TAMIZ

ABERT. mm.

%RET. PARC.

%RET. AC.

% Q' PASA

3"

76.200

0.0

0.0

100.0

PESO TOTAL

500.0

gr

2 1/2"

63.500

0.0

0.0

100.0

PESO LAVADO

477.7

gr

2"

50.800

0.0

0.0

100.0

PESO FINO

498.2

gr

1 1/2"

38.100

0.0

0.0

100.0

LMITE LQUIDO

N.P.

1"

25.400

0.0

0.0

100.0

LMITE PLSTICO

N.P.

3/4"

19.050

0.0

0.0

100.0

NDICE PLSTICO

N.P.

1/2"

12.700

0.0

0.0

100.0

Ensayo Malla #200

3/8"

9.525

0.00

0.0

0.0

100.0

100

#4

4.760

1.80

0.36

0.36

99.6

95 - 100

MDULO DE FINURA

=
=

PESO RET.

DESCRIPCIN DE LA MUESTRA

ESPECIFICACIN

P.S.Seco.
500.0

P.S.Lavado

% 200

477.7
1.869

4.45
%

#8

2.360

2.35

0.47

0.83

99.2

80 - 100

EQUIV. DE ARENA

# 16

1.180

13.03

2.61

3.44

96.6

50 - 85

PESO ESPECFICO:

# 30

0.600

84.21

16.84

20.28

79.7

25 - 60

P.E. Bulk (Base Seca)

gr/cm3

# 50

0.300

249.30

49.86

70.14

29.9

10 - 30

P.E. Bulk (Base Saturada)

gr/cm3

# 100

0.150

108.68

21.74

91.88

8.1

2 - 10

P.E. Aparente (Base Seca

gr/cm3

# 200

0.075

18.36

3.67

95.55

4.5

0-5

Absorcin

< # 200

FONDO

22.3

4.45

100.00

0.0

PESO UNIT. SUELTO

kg/m3

FINO

498.2

PESO UNIT. VARILLADO

TOTAL

500.0

% HUMEDAD

kg/m3

P.S.H.

P.S.S

% Humedad

800.0

781.0

2.4%

OBSERVACIONES:

CURVA GRANULOMTRICA

100
90

Porcentaje que pasa (%)

80
70
60
50
40
30
20
10
0
100.000

1.000

Abertura (mm)

0.010

MINISTERIO DE TRANSPORTES Y COMUNICACIONES


PROYECTO ESPECIAL DE INFRAESTRUCTURA DE TRANSPORTE NACIONAL - CONCESIONES

PROVAS NACIONAL

LABORATORIO DE MECNICA DE SUELOS, CONCRETO Y PAVIMENTOS

LMITES DE ATTERBERG
MTC E 110 Y E 111 - ASTM D 4318 - AASHTO T-89 Y T-90
OBRA

: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA TARAPOTO - JUANJUI

N REGISTRO

TRAMO

: CASPIZAPA - JUANJUI

TCNICO

: L.GORDILLO

MATERIAL

: ARENA NATURAL PARA CONCRETO

ING RESP.

CALICATA

FECHA

: 4/10/2009

MUESTRA

HECHO POR

: G.RAMIREZ

PROFUND.

DEL KM

CANTERA

: LIMON

AL KM

CARRIL

UBICACIN : KM 90+360 Lado / Izquierdo

LMITE LQUIDO
N TARRO
TARRO + SUELO HMEDO
TARRO + SUELO SECO
AGUA
PESO DEL TARRO
PESO DEL SUELO SECO
% DE HUMEDAD
N DE GOLPES

LMITE PLSTICO
N TARRO
TARRO + SUELO HMEDO
TARRO + SUELO SECO
AGUA
PESO DEL TARRO
PESO DEL SUELO SECO

CONTENIDO DE HUM EDAD (% )

% DE HUMEDAD

DIAGRAMA DE FLUIDEZ

35.00

34.00

33.00

32.00

31.00

30.00

29.00

28.00

27.00

20.0
10

CONSTANTES FSICAS DE LA MUESTRA

40.0

50.0

60.0

70.0

80.0

90.0
100

OBSERVACIONES

LMITE LQUIDO

N.P.

LMITE PLSTICO

N.P.

NDICE DE PLASTICIDAD

N.P.

CONTRATISTA:

TEC. RESPONSABLE

30.0
N DE GOLPES

SUPERVISIN

ING. RESPONSABLE

TEC. RESPONSABLE

ING. RESPONSABLE

MINISTERIO DE TRANSPORTES Y COMUNICACIONES


PROYECTO ESPECIAL DE INFRAESTRUCTURA DE TRANSPORTE NACIONAL

CONSORCIO SAN MARTIN


- H e H - ARAMSA

CONTRATISTA

SUPERVISION
LABORATORIO DE MECNICA DE SUELOS, CONCRETO Y PAVIMENTOS

EQUIVALENTE DE ARENA
MTC E 114 - ASTM D 2419 - AASHTO T-176
OBRA

: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA TARAPOTO - JUANJUI

N REGISTRO

TRAMO II

: CASPIZAPA - JUANJUI

TCNICO

: L.GORDILLO

MATERIAL

: ARENA NATURAL PARA CONCRETO

ING. RESP.

CALICATA

FECHA

: 4/10/2009

MUESTRA

HECHO POR

: G.RAMIREZ

PROFUND.

DEL KM

CANTERA

: LIMON

AL KM

UBICACIN

: KM 90+360 Lado / Izquierdo

CARRIL

CANTERA

IDENTIFICACIN

MUESTRA

Hora de entrada a saturacin

9:45

9:47

9:49

Hora de salida de saturacin (ms 10' )

9:55

9:57

9:59

Hora de entrada a decantacin

9:57

9:59

10:01

Hora de salida de decantacin (ms 20' )

10:17

10:19

10:21

Altura mxima de material fino

cm

5.00

4.90

4.90

Altura mxima de la arena

cm

3.70

3.60

3.40

Equivalente de arena

74

74

70

Equivalente de arena promedio

72.7

Resultado equivalente de arena

73

Observaciones:

MINISTERIO DE TRANSPORTES Y COMUNICACIONES


PROYECTO ESPECIAL DE INFRAESTRUCTURA DE TRANSPORTE NACIONAL
CONSORCIO SAN MARTIN
- H e H - ARAMSA

CONTRATISTA

SUPERVISION
LABORATORIO DE MECNICA DE SUELOS, CONCRETO Y PAVIMENTOS

ANLISIS GRANULOMTRICO POR TAMIZADO


MTC E 107, E 204 - ASTM D 422 - AASHTO T-11, T-27 Y T-88
OBRA

: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA TARAPOTO - JUANJUI

N REGISTRO :

TRAMO

: CASPIZAPA - JUANJUI

TCNICO

: L.GORDILLO

MATERIAL

: ARENA NATURAL PARA CONCRETO

ING RESP.

CALICATA

FECHA

MUESTRA

HECHO POR

: G.RAMIREZ

PROFUND.

DEL KM

CANTERA

: LIMON

AL KM

CARRIL

UBICACIN : KM 90+360 Lado / Izquierdo

4/11/2009

TAMIZ

ABERT. mm.

%RET. PARC.

%RET. AC.

% Q' PASA

3"

76.200

0.0

0.0

100.0

PESO TOTAL

1,021.0

gr

2 1/2"

63.500

0.0

0.0

100.0

PESO LAVADO

940.0

gr

2"

50.800

0.0

0.0

100.0

PESO FINO

767.5

gr

1 1/2"

38.100

0.0

0.0

100.0

LMITE LQUIDO

N.P.

1"

25.400

0.0

0.0

100.0

LMITE PLSTICO

N.P.

3/4"

19.050

0.0

0.0

100.0

NDICE PLSTICO

N.P.

1/2"

12.700

0.0

0.0

100.0

Ensayo Malla #200

3/8"

9.525

69.5

6.8

6.8

93.2

100

#4

4.760

184.0

18.0

24.8

75.2

95 - 100

MDULO DE FINURA

=
=

PESO RET.

DESCRIPCIN DE LA MUESTRA

ESPECIFICACIN

P.S.Seco.
1021.0

P.S.Lavado

% 200

940.0
2.852

7.93
%

#8

2.360

83.0

8.1

33.0

67.0

80 - 100

EQUIV. DE ARENA

# 16

1.180

54.0

5.3

38.3

61.8

50 - 85

PESO ESPECFICO:

# 30

0.600

62.5

6.1

44.4

55.6

25 - 60

P.E. Bulk (Base Seca)

gr/cm3

# 50

0.300

121.0

11.9

56.2

43.8

10 - 30

P.E. Bulk (Base Saturada)

gr/cm3

# 100

0.150

261.0

25.6

81.8

18.2

2 - 10

P.E. Aparente (Base Seca

gr/cm3

# 200

0.075

105.0

10.3

92.1

7.9

0-5

Absorcin

< # 200

FONDO

81.0

7.9

100.0

0.0

PESO UNIT. SUELTO

kg/m3

PESO UNIT. VARILLADO

FINO

767.5

TOTAL

1,021.0

% HUMEDAD

kg/m3

P.S.H.

P.S.S

% Humedad

766.0

745.0

2.8%

OBSERVACIONES:

CURVA GRANULOMTRICA

100
90

Porcentaje que pasa (%)

80
70
60
50
40
30
20
10
0
100.000

1.000

Abertura (mm)

0.010

MINISTERIO DE TRANSPORTES Y COMUNICACIONES


PROYECTO ESPECIAL DE INFRAESTRUCTURA DE TRANSPORTE NACIONAL

CONSORCIO SAN MARTIN


- H e H - ARAMSA

CONTRATISTA

SUPERVISION
LABORATORIO DE MECNICA DE SUELOS, CONCRETO Y PAVIMENTOS

EQUIVALENTE DE ARENA
MTC E 114 - ASTM D 2419 - AASHTO T-176
OBRA

: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA TARAPOTO - JUANJUI

N REGISTRO

TRAMO II

: CASPIZAPA - JUANJUI

TCNICO

: L.GORDILLO

MATERIAL

: ARENA NATURAL PARA CONCRETO

ING. RESP.

CALICATA

FECHA

: 4/11/2009

MUESTRA

HECHO POR

: G.RAMIREZ

PROFUND.

DEL KM

CANTERA

: LIMON

AL KM

UBICACIN

: KM 90+360 Lado / Izquierdo

CARRIL

CANTERA

IDENTIFICACIN

MUESTRA

Hora de entrada a saturacin

14:20

14:22

14:24

Hora de salida de saturacin (ms 10' )

14:30

14:32

14:34

Hora de entrada a decantacin

14:32

14:34

14:36

Hora de salida de decantacin (ms 20' )

14:52

14:54

14:56

Altura mxima de material fino

cm

4.90

5.10

5.00

Altura mxima de la arena

cm

3.50

3.50

3.50

Equivalente de arena

72

69

70

Equivalente de arena promedio

70.3

Resultado equivalente de arena

71

Observaciones:

MINISTERIO DE TRANSPORTES Y COMUNICACIONES


PROYECTO ESPECIAL DE INFRAESTRUCTURA DE TRANSPORTE NACIONAL
CONSORCIO SAN MARTIN
- H e H - ARAMSA

CONTRATISTA

SUPERVISION
LABORATORIO DE MECNICA DE SUELOS, CONCRETO Y PAVIMENTOS

ANLISIS GRANULOMTRICO POR TAMIZADO


MTC E 107, E 204 - ASTM D 422 - AASHTO T-11, T-27 Y T-88
OBRA

: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA TARAPOTO - JUANJUI

N REGISTRO :

TRAMO

: CASPIZAPA - JUANJUI

TCNICO

: L.GORDILLO

MATERIAL

: ARENA NATURAL PARA CONCRETO

ING RESP.

CALICATA

FECHA

MUESTRA

HECHO POR

: G.RAMIREZ

PROFUND.

DEL KM

CANTERA

: LIMON

AL KM

CARRIL

UBICACIN : KM 90+000

4/12/2009

TAMIZ

ABERT. mm.

%RET. PARC.

%RET. AC.

% Q' PASA

3"

76.200

0.0

0.0

100.0

PESO TOTAL

1,012.0

gr

2 1/2"

63.500

0.0

0.0

100.0

PESO LAVADO

939.5

gr

2"

50.800

0.0

0.0

100.0

PESO FINO

764.5

gr

1 1/2"

38.100

0.0

0.0

100.0

LMITE LQUIDO

N.P.

1"

25.400

0.0

0.0

100.0

LMITE PLSTICO

N.P.

3/4"

19.050

0.0

0.0

100.0

NDICE PLSTICO

N.P.

1/2"

12.700

0.0

0.0

100.0

Ensayo Malla #200

3/8"

9.525

81.0

8.0

8.0

92.0

100

#4

4.760

166.5

16.5

24.5

75.6

95 - 100

MDULO DE FINURA

=
=

PESO RET.

DESCRIPCIN DE LA MUESTRA

ESPECIFICACIN

P.S.Seco.
1012.0

P.S.Lavado

% 200

939.5
2.857

7.16
%

#8

2.360

81.0

8.0

32.5

67.6

80 - 100

EQUIV. DE ARENA

# 16

1.180

56.5

5.6

38.0

62.0

50 - 85

PESO ESPECFICO:

# 30

0.600

67.0

6.6

44.7

55.4

25 - 60

P.E. Bulk (Base Seca)

gr/cm3

# 50

0.300

121.5

12.0

56.7

43.3

10 - 30

P.E. Bulk (Base Saturada)

gr/cm3

# 100

0.150

251.0

24.8

81.5

18.5

2 - 10

P.E. Aparente (Base Seca

gr/cm3

# 200

0.075

115.0

11.4

92.8

7.2

0-5

Absorcin

< # 200

FONDO

72.5

7.2

100.0

0.0

PESO UNIT. SUELTO

kg/m3

PESO UNIT. VARILLADO

FINO

764.5

TOTAL

1,012.0

% HUMEDAD

kg/m3

P.S.H.

P.S.S

% Humedad

825.0

802.0

2.87%

OBSERVACIONES:

CURVA GRANULOMTRICA

100
90

Porcentaje que pasa (%)

80
70
60
50
40
30
20
10
0
100.000

1.000

Abertura (mm)

0.010

MINISTERIO DE TRANSPORTES Y COMUNICACIONES


PROYECTO ESPECIAL DE INFRAESTRUCTURA DE TRANSPORTE NACIONAL

CONSORCIO SAN MARTIN


- H e H - ARAMSA

CONTRATISTA

SUPERVISION
LABORATORIO DE MECNICA DE SUELOS, CONCRETO Y PAVIMENTOS

EQUIVALENTE DE ARENA
MTC E 114 - ASTM D 2419 - AASHTO T-176
OBRA

: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA TARAPOTO - JUANJUI

N REGISTRO

TRAMO

: CASPIZAPA - JUANJUI

TCNICO

: L.GORDILLO

MATERIAL

: ARENA NATURAL PARA CONCRETO

ING. RESP.

CALICATA

FECHA

: 4/12/2009

MUESTRA

HECHO POR

: G.RAMIREZ

PROFUND.

DEL KM

CANTERA

: LIMON

AL KM

UBICACIN

: KM 90+360 Lado / Izquierdo

CARRIL

CANTERA

IDENTIFICACIN

MUESTRA

Hora de entrada a saturacin

15:30

15:32

15:34

Hora de salida de saturacin (ms 10' )

15:40

15:42

15:44

Hora de entrada a decantacin

15:42

15:44

15:46

Hora de salida de decantacin (ms 20' )

16:02

16:04

16:06

Altura mxima de material fino

cm

5.10

4.90

5.00

Altura mxima de la arena

cm

3.60

3.70

3.50

Equivalente de arena

71

76

70

Equivalente de arena promedio

72.3

Resultado equivalente de arena

73

Observaciones:

MINISTERIO DE TRANSPORTES Y COMUNICACIONES


PROYECTO ESPECIAL DE INFRAESTRUCTURA DE TRANSPORTE NACIONAL - CONCESIONES

PROVAS NACIONAL

LABORATORIO DE MECNICA DE SUELOS, CONCRETO Y PAVIMENTOS

GRAVEDAD ESPECFICA Y ABSORCIN DE LOS AGREGADOS


(NORMA AASHTO T-84, T-85)
LABORATORIO MECNICA DE SUELOS, CONCRETO Y PAVIMENTOS
OBRA

: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA TARAPOTO - JUANJUI

N REGISTRO

TRAMO

: CASPIZAPA - JUANJUI

TCNICO

: L.GORDILLO

MATERIAL

: ARENA NATURAL PARA CONCRETO

ING RESP.

CALICATA

FECHA

: 4/10/2009

MUESTRA

HECHO POR

: G.RAMIREZ

PROFUND. :

DEL KM

CANTERA

AL KM

CARRIL

: LIMON

UBICACIN : KM 90+360 Lado / Izquierdo

DATOS DE LA MUESTRA

AGREGADO FINO
A

Peso material saturado superficialmente seco ( en Aire ) (gr)

Peso frasco + agua (gr)

Peso frasco + agua + A (gr)

Peso del material + agua en el frasco (gr)

Volumen de masa + volumen de vaco = C-D (cm3)

Peso de material seco en estufa (105C) (gr)

Volumen de masa = E - ( A - F ) (cm3)


Pe bulk ( Base seca ) = F/E
Pe bulk ( Base saturada ) = A/E
Pe aparente ( Base seca ) = F/G
% de absorcin = ((A - F)/F)*100

OBSERVACIONES:

CONTRATISTA:

TEC. RESPONSABLE

SUPERVISIN:

ING. RESPONSABLE

TEC. RESPONSABLE

ING. RESPONSABLE

S
CONCESIONES

PROVAS NACIONAL

VIMENTOS

REGADOS

MENTOS

PROMEDIO

ING. RESPONSABLE

MINISTERIO DE TRANSPORTES Y COMUNICACIONES


PROYECTO ESPECIAL DE INFRAESTRUCTURA DE TRANSPORTE NACIONAL - CONCESIONES

PROVAS NACIONAL

LABORATORIO DE MECNICA DE SUELOS, CONCRETO Y PAVIMENTOS

PESO UNITARIO DE LOS AGREGADOS


MTC E 203 - ASTM C 29 - ASSHTO T-19
OBRA

: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA TARAPOTO - JUANJUI

N REGISTRO

TRAMO

: CASPIZAPA - JUANJUI

TCNICO

: L.GORDILLO

MATERIAL

: ARENA NATURAL PARA CONCRETO

ING RESP.

CALICATA

FECHA

: 4/10/2009

MUESTRA

HECHO POR

: G.RAMIREZ

PROFUND.

DEL KM

CANTERA

: LIMON

AL KM

UBICACIN

: KM 90+360 Lado / Izquierdo

CARRIL

AGREGADO FINO
PESO UNITARIO SUELTO
DESCRIPCIN

Und.

Peso del recipiente + muestra

(gr)

Peso del recipiente

(gr)

Peso de la muestra

(gr)

Volumen

(cm3)

Peso unitario suelto hmedo

(kg/m3)

Peso unitario suelto promedio

(kg/m3)

IDENTIFICACIN
1

8709
3922

PESO UNITARIO VARILLADO


DESCRIPCIN

Und.

Peso del recipiente + muestra

(gr)

Peso del recipiente

(gr)

Peso de la muestra

(gr)
(cm3)

Volumen
Peso unitario compactado hmedo

(kg/m3)

Peso unitario compactado promedio

(kg/m3)

IDENTIFICACIN
1

8709
3922

OBS.:

CONTRATISTA:

TEC. RESPONSABLE

SUPERVISIN:

ING. RESPONSABLE

TEC. RESPONSABLE

ING. RESPONSABLE

MINISTERIO DE TRANSPORTES Y COMUNICACIONES


PROYECTO ESPECIAL DE INFRAESTRUCTURA DE TRANSPORTE NACIONAL - CONCESIONES

PROVAS NACIONAL

LABORATORIO DE MECNICA DE SUELOS, CONCRETO Y PAVIMENTOS

CONTENIDO DE SALES SOLUBLES EN AGREGADOS


MTC 219 - 2000
OBRA

: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA TARAPOTO - JUANJUI

N REGISTRO

TRAMO

: CASPIZAPA - JUANJUI

TCNICO

: L.GORDILLO

MATERIAL

: ARENA NATURAL PARA CONCRETO

ING. RESP.

CALICATA

FECHA

: 4/10/2009

MUESTRA

HECHO POR

: G.RAMIREZ

PROFUND.

DEL KM

CANTERA

: LIMON

AL KM

UBICACIN

: KM 90+360 Lado / Izquierdo

CARRIL

AGREGADO FINO

MUESTRA :
ENSAYO N

IDENTIFICACION
1

(1) Peso muestra (gr)

171.23

168.58

169.22

(2) Volumen aforo (ml)

500.00

500.00

500.00

(3) Volumen alicuota (ml)

50.00

50.00

50.00

(4) Peso masa cristalizada (gr)

0.02

0.01

0.02

(5) Porcentaje de sales (%) (100/((3)x(1)/(4)x(2)))

0.12

0.06

0.12

Observaciones :

CONTRATISTA

SUPERVISIN

Promedio
4

0.10%

MINISTERIO DE TRANSPORTES Y COMUNICACIONES


PROYECTO ESPECIAL DE INFRAESTRUCTURA DE TRANSPORTE NACIONAL - CONCESIONES

PROVAS NACIONAL

LABORATORIO DE MECNICA DE SUELOS, CONCRETO Y PAVIMENTOS

DURABILIDAD AL SULFATO DE SODIO Y MAGNESIO


MTC E 209 - ASTM C 88 - AASHTO T-104
OBRA

: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA TARAPOTO - JUANJUI

N REGISTRO :

TRAMO

: CASPIZAPA - JUANJUI

TCNICO

: L.GORDILLO

MATERIAL

: ARENA NATURAL PARA CONCRETO

ING. RESP.

CALICATA

FECHA

: 4/10/2009

MUESTRA

HECHO POR

: G.RAMIREZ

PROFUND.

DEL KM

CANTERA

: LIMON

AL KM

UBICACIN

: KM 90+360 Lado / Izquierdo

CARRIL

ANLISIS CUANTITATIVO
AGREGADO FINO
TAMAO
Pasa

Retiene

Gradacin
Original (%)

Peso mn.
requerido
(g)

Peso
fraccin
ensayada
(g)

N de
partculas

Peso ret.
despus de
ensayo (g)

Peso (gr)

Prdida
corregida
(%)

Prdida

3/8"

N 04

0.4

100

0.0

4.8

0.0

--

N 04

N 08

0.5

100

100

--

95.2

4.8

0.0

0.0

--

N 08

N 16

2.6

100

100

--

94.8

5.2

0.0

0.0

--

N 16

N 30

16.8

100

100

--

96.5

3.5

3.5

0.6

--

N 30

N 50

49.9

100

100

--

94.8

5.2

5.2

2.6

--

N 50

N 100

21.7

100

100

--

93.9

6.1

6.1

1.3

--

< N 100
TOTALES

OBSERVACIONES:

CONTRATISTA:

--

N de partculas

5.4
97.3

Solucin:

500.0

475.2

Sulfato de sodio

SUPERVISIN:

4.53

MINISTERIO DE TRANSPORTES Y COMUNICACIONES


PROYECTO ESPECIAL DE INFRAESTRUCTURA DE TRANSPORTE NACIONAL - CONCESIONES

PROVAS NACIONAL

LABORATORIO DE MECNICA DE SUELOS, CONCRETO Y PAVIMENTOS

MATERIA ORGNICA EN SUELOS (PRDIDA POR IGNICIN)


MTC 118 - 2000 - AASHTO T-267
OBRA

: REHABILITACION Y MEJORAMIENTO DE LA CARRETERA TARAPOTO - JUANJUI

N REGISTRO

TRAMO

: CASPIZAPA - JUANJUI

TCNICO

: L.GORDILLO

MATERIAL

: ARENA NATURAL PARA CONCRETO

ING. RESP.

CALICATA

FECHA

: 4/10/2009

MUESTRA

HECHO POR

: G.RAMIREZ

PROFUND.

DEL KM

CANTERA

: LIMON

AL KM

UBICACIN

: KM 90+360 Lado / Izquierdo

CARRIL

CONTENIDO ORGNICO

ENSAYO N

(A) Peso del crisol + suelo seco antes de la ignicin (gr)

146.55

145.53

143.68

(B) Peso del crisol + suelo seco despus de la ignicin (gr)

146.51

145.49

143.63

(C) Peso del crisol (gr)

107.07

108.53

107.54

(D) Prdida por ignicin (gr) (A-B)

0.04

0.04

0.05

(E) Peso suelo seco despus de la ignicin (gr) (B-C)

39.44

36.96

36.09

0.1

0.1

0.1

% Materia Orgnica (%) (D/E*100)

PROMEDIO

0.1%

Observaciones :

CONTRATISTA:

TEC. RESPONSABLE

SUPERVISION:

ING. RESPONSABLE

TEC. RESPONSABLE

ING. RESPONSABLE