Vous êtes sur la page 1sur 20

Drawing Log Report : Structural

Project Name : Adibatla - SEZ


Project ID : 1009058
Data Date : 31-May-2013

Phase 1
G1 Block
Activity
Id

Drawing Title

R0 Planned

R0 Actual

A9930

General Notes

31-May-13

13-Aug-12

A9980

Staircase Details

31-May-13

13-Aug-12

A9970

Column schedule

31-May-13

13-Aug-12

A10140

Slab Top & Bottom Steel Layout Plan

31-May-13

08-Aug-12

A9960

Lift, shear wall details

31-May-13

13-Aug-12

A10150

Beam schedule

31-May-13

13-Aug-12

A9920

Structural Design Basis Report

31-May-13

13-Aug-12

A9950

Tie Beam & Raft Details

31-May-13

13-Aug-12

A10160

PT Slab Tendon Layout Plan

31-May-13

01-Aug-12

A10170

PT Beam tendon Layout Plan

31-May-13

08-Aug-12

A10180

PT Beam Profile Details

31-May-13

08-Aug-12

A10130

Beam & Slab Framing Plan.

31-May-13

08-Aug-12

A9940

Column & footing layout plan

31-May-13

08-Aug-12

Report Print Date : 26-Aug-2013

R1 Actual

R2 Actual

Page 1 of 20

R3 Actual

R4 Actual

R5 Actual

R6 Actual

R7 Actual

G2 Block
Activity
Id

Drawing Title

A10010

R0 Planned

R0 Actual

Column & footing layout plan

31-May-13

08-Aug-12

A10000

General Notes

31-May-13

13-Aug-12

A10200

Slab Top & Bottom Steel Layout Plan

31-May-13

08-Aug-12

A10210

Beam schedule

31-May-13

13-Aug-12

A10030

Lift, shear wall details

31-May-13

13-Aug-12

A9990

Structural Design Basis Report

31-May-13

13-Aug-12

A10190

Beam & Slab Framing Plan.

31-May-13

08-Aug-12

A10240

PT Beam Profile Details

31-May-13

08-Aug-12

A10230

PT Beam tendon Layout Plan

31-May-13

08-Aug-12

A10020

Tie Beam & Raft Details

31-May-13

13-Aug-12

A10220

PT Slab Tendon Layout Plan

31-May-13

01-Aug-12

A10050

Staircase Details

31-May-13

13-Aug-12

A10040

Column schedule

31-May-13

13-Aug-12

R0 Planned

R0 Actual

R1 Actual

R2 Actual

R3 Actual

R4 Actual

R5 Actual

R6 Actual

R7 Actual

R1 Actual

R2 Actual

R3 Actual

R4 Actual

R5 Actual

R6 Actual

R7 Actual

G3 Block
Activity
Id

Drawing Title

A10270

Beam schedule

31-May-13

13-Aug-12

A10100

Lift, shear wall details

31-May-13

13-Aug-12

A10070

General Notes

31-May-13

13-Aug-12

A10120

Staircase Details

31-May-13

13-Aug-12

A10260

Slab Top & Bottom Steel Layout Plan

31-May-13

08-Aug-12

A10090

Tie Beam & Raft Details

31-May-13

13-Aug-12

A10280

PT Slab Tendon Layout Plan

31-May-13

01-Aug-12

A10110

Column schedule

31-May-13

13-Aug-12

A10300

PT Beam Profile Details

31-May-13

08-Aug-12

Report Print Date : 26-Aug-2013

Page 2 of 20

Activity
Id

Drawing Title

R0 Planned

R0 Actual

A10250

Beam & Slab Framing Plan.(G3)

31-May-13

08-Aug-12

A10060

Structural Design Basis Report

31-May-13

13-Aug-12

A10080

Column & footing layout plan

31-May-13

08-Aug-12

A10290

PT Beam tendon Layout Plan

31-May-13

08-Aug-12

R0 Planned

R0 Actual

R1 Actual

R2 Actual

R3 Actual

R4 Actual

R5 Actual

R6 Actual

R7 Actual

R1 Actual

R2 Actual

R3 Actual

R4 Actual

R5 Actual

R6 Actual

R7 Actual

R1 Actual

R2 Actual

R3 Actual

R4 Actual

R5 Actual

R6 Actual

R7 Actual

Kiosk 1Block
Activity
Id

Drawing Title

A9910

PT Beam Profile Details

31-May-13

08-Aug-12

A9800

Excavation Plan & Details

31-May-13

13-Aug-12

A9820

Column & footing layout plan

31-May-13

08-Aug-12

A9860

First Floor Slab And Beam Framing

31-May-13

08-Aug-12

A9900

PT Beam tendon Layout Plan

31-May-13

08-Aug-12

A9840

Column schedule

31-May-13

13-Aug-12

A9890

PT Slab Tendon Layout Plan

31-May-13

01-Aug-12

A9850

Staircase Details

31-May-13

13-Aug-12

A9870

Slab Top & Bottom Steel Layout Plan

31-May-13

08-Aug-12

A9830

Tie Beam Details

31-May-13

08-Aug-12

A9880

Beam schedule

31-May-13

13-Aug-12

A9810

General Notes

31-May-13

13-Aug-12

R0 Planned

R0 Actual

OTHERS
Activity
Id

Drawing Title

A9760

STP DETAILS

31-May-13

01-Aug-12

A10310

DETAILS OF HSD

31-May-13

01-Aug-12

A9750

STP DETAILS

31-May-13

01-Aug-12

A9770

STP DETAILS

31-May-13

01-Aug-12

Report Print Date : 26-Aug-2013

Page 3 of 20

Activity
Id

Drawing Title

R0 Planned

R0 Actual

A9700

Tunnel Section Details

31-May-13

01-Aug-12

A9680

Tunnel Layout Plan

31-May-13

01-Aug-12

A9690

Tunnel Section Details

31-May-13

01-Aug-12

A9780

STP DETAILS

31-May-13

01-Aug-12

A9670

Tunnel Layout Plan

31-May-13

01-Aug-12

A9730

Excavation Plan & Details - STP

31-May-13

01-Aug-12

A10340

SWITCHING YARD STRUCTURAL


DETAILS

31-May-13

01-Aug-12

A10320

BIO GAS PLANT LAYOUIT PLAN

31-May-13

01-Aug-12

A9790

STP TOP SLAB FRAMING PLAN

31-May-13

01-Aug-12

A9710

EXHAUST ROOM DETAILS

31-May-13

01-Aug-12

A9740

ROCK ANCHOR LAYOUT PLAN (STP)

31-May-13

01-Aug-12

A9720

Insert Plate Details For Services In Tunnel

31-May-13

01-Aug-12

A10350

HT PANEL ROOM STRUCTURAL


DETAILS

31-May-13

01-Aug-12

A10330

BIO GAS PLANT SECTIONAL DETAILS

31-May-13

01-Aug-12

R0 Planned

R0 Actual

R1 Actual

R2 Actual

R3 Actual

R4 Actual

R5 Actual

R6 Actual

R7 Actual

R1 Actual

R2 Actual

R3 Actual

R4 Actual

R5 Actual

R6 Actual

R7 Actual

P1 Block
Activity
Id

Drawing Title

A9210

Beam Schedule For Terrace Floor

31-May-13

13-Aug-12

A9520

Terrace Floor Layout Plan

31-May-13

08-Aug-12

A9660

Top Reinforcement Layout (Terrace)

31-May-13

08-Aug-12

A9650

Top Reinforcement Layout (Ground Floor)

31-May-13

08-Aug-12

A9120

Bar Bending Schedule (Beam) - Ground


Floor

31-May-13

13-Aug-12

A9420

Ground Floor Slab Reinft. Section Details

31-May-13

08-Aug-12

A9280

Combined Footing Details

31-May-13

13-Aug-12

A9600

Terrace Floor Tendon Layout

31-May-13

08-Aug-12

A9360

Ground Floor Layout Plan

31-May-13

08-Aug-12

Report Print Date : 26-Aug-2013

Page 4 of 20

Activity
Id

Drawing Title

R0 Planned

R0 Actual

A9380

Ground Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A35970

1st Basement PT Beam Reinf. Details

31-May-13

08-Aug-12

A9570

Terrace Floor Slab Reinf. Section Details

31-May-13

08-Aug-12

A35770

Framing Plan (Basement 1)

31-May-13

08-Aug-12

A9410

Ground Floor Reinft. Details

31-May-13

08-Aug-12

A9260

Column & Footing Layout Plan (2 Sheets)

31-May-13

08-Aug-12

A9140

Bar Bending Schedule (Slab) - Basement 1

31-May-13

13-Aug-12

A35960

1st Basement PT Beam Reinf. Details

31-May-13

08-Aug-12

A9330

General Notes

31-May-13

13-Aug-12

A9510

Standard Beam Sections

31-May-13

08-Aug-12

A9130

Bar Bending Schedule (Beam) - Terrace

31-May-13

13-Aug-12

A9200

Beam Schedule For Ground Floor Slab

31-May-13

13-Aug-12

A35870

First Floor Typ. Shear Links Details.

31-May-13

13-Aug-12

A9590

Terrace Floor Tendon Layout

31-May-13

08-Aug-12

A9630

Top Reinforcement Layout (Basement 1)

31-May-13

08-Aug-12

A35820

1st Floor Reinft. Details

31-May-13

08-Aug-12

A9190

Beam Schedule For First Floor Slab

31-May-13

13-Aug-12

A35880

1st Floor Layout Plan

31-May-13

08-Aug-12

A35930

1st Basement Floor Tendon Layout (Grid


1 TO 13)

31-May-13

08-Aug-12

A9390

Ground Floor Reinft. Details

31-May-13

08-Aug-12

A36010

1st Basement Reinf. Section Details

31-May-13

08-Aug-12

A9560

Terrace Floor Slab Reinf. Section Details

31-May-13

08-Aug-12

A35840

1st Floor Reinft. Section Details

31-May-13

08-Aug-12

A9500

Staircase Details

31-May-13

13-Aug-12

A9370

Ground Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A9480

Raft Layout Plan & DetailS (2 Sheets)

31-May-13

13-Aug-12

A9490

Rock Anchor Layout Plan

31-May-13

13-Aug-12

A35980

1st Basement Reinf. Details

31-May-13

08-Aug-12

Report Print Date : 26-Aug-2013

R1 Actual

R2 Actual

Page 5 of 20

R3 Actual

R4 Actual

R5 Actual

R6 Actual

R7 Actual

Activity
Id

Drawing Title

R0 Planned

R0 Actual

A9150

Bar Bending Schedule (Slab) - First Floor

31-May-13

13-Aug-12

A9160

Bar Bending Schedule (Slab) - Ground


Floor

31-May-13

13-Aug-12

A35920

1st Basement Floor Layout Plan

31-May-13

08-Aug-12

A9530

Terrace Floor Layout Plan

31-May-13

08-Aug-12

A35790

1st Floor Layout Plan

31-May-13

08-Aug-12

A36040

Bar Bending Schedule (Beam) - First Floor

31-May-13

13-Aug-12

A9350

Ground Floor Layout Plan

31-May-13

08-Aug-12

A9240

Bottom Reinforcement Layout (Ground


Floor)

31-May-13

08-Aug-12

A35950

1st Basement Floor Tendon Layout (Grid


25 TO 31)

31-May-13

08-Aug-12

A35900

1st Basement Floor Layout Plan

31-May-13

08-Aug-12

A9340

Ground Floor Layout Plan

31-May-13

08-Aug-12

A9640

Top Reinforcement Layout (First Floor)

31-May-13

08-Aug-12

A35990

1st Basement Reinf. Details

31-May-13

08-Aug-12

A9290

Excavation Plan & Details (2 Sheets)

31-May-13

13-Aug-12

A9170

Bar Bending Schedule (Slab) - Terrace

31-May-13

13-Aug-12

A9300

Framing Plan (First Floor)

31-May-13

08-Aug-12

A9540

Terrace Floor Slab Reinf. Details

31-May-13

08-Aug-12

A35810

1st Floor Reinft. Details

31-May-13

08-Aug-12

A9610

TerraceFloor Layout Plan

31-May-13

08-Aug-12

A35780

1st Floor Layout Plan

31-May-13

08-Aug-12

A9620

TerraceFloor Slab Reinf. Details

31-May-13

08-Aug-12

A9270

Column Schedule (2 Sheets)

31-May-13

13-Aug-12

A9310

Framing Plan (Ground Floor)

31-May-13

08-Aug-12

A9320

Framing Plan (Terrace)

31-May-13

08-Aug-12

A9250

Bottom Reinforcement Layout (Terrace)

31-May-13

08-Aug-12

A35830

1st Floor Reinft. Details

31-May-13

08-Aug-12

A9460

Ground Floor Typ. Shear Links Details.

31-May-13

13-Aug-12

Report Print Date : 26-Aug-2013

R1 Actual

R2 Actual

Page 6 of 20

R3 Actual

R4 Actual

R5 Actual

R6 Actual

R7 Actual

Activity
Id

Drawing Title

A9180

R0 Planned

R0 Actual

Beam Schedule For B1 Slab

31-May-13

13-Aug-12

A9220

Bottom Reinforcement Layout (Basement


1)

31-May-13

08-Aug-12

A35910

1st Basement Floor Layout Plan

31-May-13

08-Aug-12

A9230

Bottom Reinforcement Layout (First Floor)

31-May-13

08-Aug-12

A35850

1st Floor Tendon Layout (Grid 1 TO 13)

31-May-13

08-Aug-12

A9550

Terrace Floor Slab Reinf. Details

31-May-13

08-Aug-12

A9470

Lift & Shear Wall Details

31-May-13

13-Aug-12

A9580

Terrace Floor Tendon Layout

31-May-13

08-Aug-12

A35890

1st Floor Tendon Layout (Grid 25 TO 31)

31-May-13

08-Aug-12

A9430

Ground Floor Tendon Layout Tendon


Layout (Grid 1 TO 13)

31-May-13

08-Aug-12

A35940

1st Basement Floor Tendon Layout (Grid


13 TO 25)

31-May-13

08-Aug-12

A9400

Ground Floor Reinft. Details

31-May-13

08-Aug-12

A36000

1st Basement Reinf. Details

31-May-13

08-Aug-12

A35800

1st Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A9440

Ground Floor Tendon Layout Tendon


Layout (Grid 13 TO 25)

31-May-13

08-Aug-12

A9450

Ground Floor Tendon Layout Tendon


Layout (Grid 25 to 31)

31-May-13

08-Aug-12

A35860

1st Floor Tendon Layout (Grid 13 TO 25)

31-May-13

08-Aug-12

A36030

Bar Bending Schedule (Beam) - Basement


1

31-May-13

13-Aug-12

R0 Planned

R0 Actual

R1 Actual

R2 Actual

R3 Actual

R4 Actual

R5 Actual

R6 Actual

R7 Actual

R1 Actual

R2 Actual

R3 Actual

R4 Actual

R5 Actual

R6 Actual

R7 Actual

S1 Block
Activity
Id

Drawing Title

A32690

Beam & Slab Framing Plan (First floor)

31-May-13

08-Aug-12

A32820

Bottom Reinforcement Layout (Mezzanine)

31-May-13

08-Aug-12

Report Print Date : 26-Aug-2013

Page 7 of 20

Activity
Id

Drawing Title

R0 Planned

R0 Actual

A32570

Bar Bending Schedule (Beam) - 6th Floor

31-May-13

08-Aug-12

A33060

First Floor Slab Reinft. Details

31-May-13

08-Aug-12

A33530

Sixth Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A33700

Third Floor Layout Plan

31-May-13

08-Aug-12

A33500

Sixth Floor PT Beam Profiles

31-May-13

08-Aug-12

A33770

Third Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A33170

Fourth Floor Slab Reinft. Section Details

31-May-13

08-Aug-12

A33580

STAIRCASE DETAILS

31-May-13

13-Aug-12

A33300

Second Floor Layout Plan

31-May-13

08-Aug-12

A33230

Lift Pit Level PT Beam Profiles

31-May-13

08-Aug-12

A33890

Top Reinforcement Layout (6th Floor)

31-May-13

08-Aug-12

A33290

Mezzanine Floor Slab Beam Schedule

31-May-13

08-Aug-12

A32550

Bar Bending Schedule (Beam) - 4th Floor

31-May-13

08-Aug-12

A33130

Fourth Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A33460

SECTION DETAILS(SECOND FLOOR)

31-May-13

08-Aug-12

A32870

Combined Footing Details

31-May-13

08-Aug-12

A33690

Terrace Floor Tendon Layout

31-May-13

08-Aug-12

A33140

Fourth Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A33680

Terrace Floor Slab Reinft. Section Details

31-May-13

08-Aug-12

A33350

Second Floor Slab Beam Schedule

31-May-13

08-Aug-12

A32860

Column Schedule (4 Sheets)

31-May-13

08-Aug-12

A33210

Lift Pit Level Plan

31-May-13

08-Aug-12

A32670

Bar Bending Schedule (Slab) - Terrace


Floor

31-May-13

08-Aug-12

A33050

First Floor Slab Beam Schedule

31-May-13

08-Aug-12

A32620

Bar Bending Schedule (Slab) - 3rd Floor

31-May-13

08-Aug-12

A33160

Fourth Floor Slab Reinft. Details

31-May-13

08-Aug-12

A32580

Bar Bending Schedule (Beam) - Mezzanine


Floor

31-May-13

08-Aug-12

Report Print Date : 26-Aug-2013

R1 Actual

R2 Actual

Page 8 of 20

R3 Actual

R4 Actual

R5 Actual

R6 Actual

R7 Actual

Activity
Id

Drawing Title

R0 Planned

R0 Actual

A33270

LIFT WALL CUTOUT DETAILS

31-May-13

01-Aug-12

A33450

SECTION DETAILS(Fourth Floor)

31-May-13

08-Aug-12

A33490

Sixth Floor Layout Plan

31-May-13

08-Aug-12

A33390

Second Floor Slab Tendon Profiles

31-May-13

01-Aug-12

A33660

Terrace Floor Slab Beam Schedule

31-May-13

08-Aug-12

A33780

Third Floor Slab Beam Schedule

31-May-13

08-Aug-12

A33420

Second Floor Slab Tendon Profiles

31-May-13

01-Aug-12

A32830

Bottom Reinforcement Layout (Terrace)

31-May-13

08-Aug-12

A33800

Third Floor Slab Reinft. Section Details

31-May-13

08-Aug-12

A32540

Bar Bending Schedule (Beam) - 3rd Floor

31-May-13

08-Aug-12

A33840

Top Reinforcement Layout (1st Floor)

31-May-13

08-Aug-12

A32810

Bottom Reinforcement Layout (6th Floor)

31-May-13

08-Aug-12

A33030

First Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A33040

First Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A33280

M.S. FEATURE STAIRCASE DETAILS


(2nd TO 5th FLOOR)

31-May-13

13-Aug-12

A32660

Bar Bending Schedule (Slab) - Mezzanine


Floor

31-May-13

08-Aug-12

A32760

Bottom Reinforcement Layout (1st Floor)

31-May-13

08-Aug-12

A33470

SECTION DETAILS(Sixth Floor)

31-May-13

08-Aug-12

A33850

Top Reinforcement Layout (2nd Floor)

31-May-13

08-Aug-12

A33180

Fourth Floor Tendon Layout

31-May-13

08-Aug-12

A32780

Bottom Reinforcement Layout (3rd Floor)

31-May-13

08-Aug-12

A33430

SECTION DETAILS (FIRST FLOOR)

31-May-13

08-Aug-12

A32730

Beam & Slab Framing Plan (Sixth floor)

31-May-13

08-Aug-12

A33090

First Floor Tower Crane Reinft. Details

31-May-13

08-Aug-12

A33070

First Floor Slab Reinft. Section Details

31-May-13

08-Aug-12

A33480

SECTION DETAILS(THIRD FLOOR)

31-May-13

08-Aug-12

A32840

BRIDGE SECTION DETAILS (FIRST


FLOOR)

31-May-13

08-Aug-12

Report Print Date : 26-Aug-2013

R1 Actual

R2 Actual

Page 9 of 20

R3 Actual

R4 Actual

R5 Actual

R6 Actual

R7 Actual

Activity
Id

Drawing Title

R0 Planned

R0 Actual

A33080

First Floor Slab Tendon Layout

31-May-13

08-Aug-12

A32520

Bar Bending Schedule (Beam) - 1st Floor

31-May-13

08-Aug-12

A33120

Fourth Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A32980

Fifth Floor Slab Reinft. Section Details

31-May-13

08-Aug-12

A32880

Excavation Plan & Details

31-May-13

08-Aug-12

A33320

Second Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A33760

Third Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A32650

Bar Bending Schedule (Slab) - 6th Floor

31-May-13

08-Aug-12

A33720

Third Floor PT Beam Profiles

31-May-13

08-Aug-12

A33900

Top Reinforcement Layout (Mezzanine)

31-May-13

08-Aug-12

A32970

Fifth Floor Slab Reinft. Details

31-May-13

08-Aug-12

A33790

Third Floor Slab Reinft. Details

31-May-13

08-Aug-12

A32920

Fifth Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A32850

Column & Footing Layout Plan

31-May-13

08-Aug-12

A33600

Standard Beam Sections

31-May-13

08-Aug-12

A32590

Bar Bending Schedule (Beam) - Terrace


Floor

31-May-13

08-Aug-12

A33200

Lift & Shear Wall Details

31-May-13

08-Aug-12

A33870

Top Reinforcement Layout (4th Floor)

31-May-13

08-Aug-12

A32960

Fifth Floor Slab Beam Schedule

31-May-13

08-Aug-12

A33360

Second Floor Slab Reinft. Details

31-May-13

08-Aug-12

A33550

Sixth Floor Slab Reinft. Details

31-May-13

08-Aug-12

A32770

Bottom Reinforcement Layout (2nd Floor)

31-May-13

08-Aug-12

A33100

Fourth Floor Layout Plan

31-May-13

08-Aug-12

A33310

Second Floor PT Beam Profiles

31-May-13

08-Aug-12

A32750

Beam & Slab Framing Plan (Third floor)

31-May-13

08-Aug-12

A33410

Second Floor Slab Tendon Profiles

31-May-13

01-Aug-12

A33510

Sixth Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A33370

Second Floor Slab Reinft. Section Details

31-May-13

08-Aug-12

Report Print Date : 26-Aug-2013

R1 Actual

R2 Actual

Page 10 of 20

R3 Actual

R4 Actual

R5 Actual

R6 Actual

R7 Actual

Activity
Id

Drawing Title

R0 Planned

R0 Actual

A33440

SECTION DETAILS(Fifth Floor)

31-May-13

08-Aug-12

A32720

Beam & Slab Framing Plan (second floor)

31-May-13

08-Aug-12

A32910

Fifth Floor PT Beam Profiles

31-May-13

08-Aug-12

A33860

Top Reinforcement Layout (3rd Floor)

31-May-13

08-Aug-12

A33610

Terrace Floor Layout Plan

31-May-13

08-Aug-12

A33880

Top Reinforcement Layout (5th Floor)

31-May-13

08-Aug-12

A33630

Terrace Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A33750

Third Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A32630

Bar Bending Schedule (Slab) - 4th Floor

31-May-13

08-Aug-12

A32710

Beam & Slab Framing Plan (Mezzanine)

31-May-13

08-Aug-12

A33240

Lift Pit Level PT Beam Reinft. Details

31-May-13

08-Aug-12

A33220

Lift Pit Level PT Beam Profiles

31-May-13

08-Aug-12

A32890

Fifth Floor PT Beam Profiles

31-May-13

08-Aug-12

A33340

Second Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A33520

Sixth Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A32950

Fifth Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A33560

Sixth Floor Slab Reinft. Section Details

31-May-13

08-Aug-12

A32610

Bar Bending Schedule (Slab) - 2nd Floor

31-May-13

08-Aug-12

A32740

Beam & Slab Framing Plan (Terrace)

31-May-13

08-Aug-12

A33000

First Floor Layout Plan

31-May-13

08-Aug-12

A33190

General Notes

31-May-13

08-Aug-12

A32990

Fifth Floor Tendon Layout

31-May-13

08-Aug-12

A32640

Bar Bending Schedule (Slab) - 5th Floor

31-May-13

08-Aug-12

A32900

Fifth Floor Layout Plan

31-May-13

08-Aug-12

A33910

Top Reinforcement Layout (Terrace)

31-May-13

08-Aug-12

A33620

Terrace Floor PT Beam Profiles

31-May-13

08-Aug-12

A32930

Fifth Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A33380

Second Floor Slab Tendon Layout

31-May-13

08-Aug-12

Report Print Date : 26-Aug-2013

R1 Actual

R2 Actual

Page 11 of 20

R3 Actual

R4 Actual

R5 Actual

R6 Actual

R7 Actual

Activity
Id

Drawing Title

R0 Planned

R0 Actual

A32600

Bar Bending Schedule (Slab) - 1st Floor

31-May-13

08-Aug-12

A33330

Second Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A33740

Third Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A32680

Beam & Slab Framing Plan (Fifth floor)

31-May-13

08-Aug-12

A33110

Fourth Floor PT Beam Profiles

31-May-13

08-Aug-12

A33710

Third Floor PT Beam Profiles

31-May-13

08-Aug-12

A33730

Third Floor PT Beam Profiles

31-May-13

08-Aug-12

A32940

Fifth Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A33260

Lift pit Lvl Framing Plan

31-May-13

08-Aug-12

A32790

Bottom Reinforcement Layout (4th Floor)

31-May-13

08-Aug-12

A32800

Bottom Reinforcement Layout (5th Floor)

31-May-13

08-Aug-12

A33650

Terrace Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A33810

Third Floor Tendon Layout

31-May-13

08-Aug-12

A33150

Fourth Floor Slab Beam Schedule

31-May-13

08-Aug-12

A32560

Bar Bending Schedule (Beam) - 5th Floor

31-May-13

08-Aug-12

A33820

Tie Beam Framing Plans (Ground Floor


Level)

31-May-13

08-Aug-12

A33400

Second Floor Slab Tendon Profiles

31-May-13

01-Aug-12

A33250

Lift Pit Level PT Beam Reinft. Details

31-May-13

08-Aug-12

A33640

Terrace Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A33540

Sixth Floor Slab Beam Schedule

31-May-13

08-Aug-12

A33010

First Floor PT Beam Profiles

31-May-13

08-Aug-12

A33590

STAIRCASE DETAILS (TYPICAL FLOOR)

31-May-13

13-Aug-12

A32700

Beam & Slab Framing Plan (Fourth floor)

31-May-13

08-Aug-12

A33570

Sixth Floor Tendon Layout

31-May-13

08-Aug-12

A33670

Terrace Floor Slab Reinft. Details

31-May-13

08-Aug-12

A33020

First Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A33830

Tie Beam Section Details

31-May-13

08-Aug-12

A32530

Bar Bending Schedule (Beam) - 2nd Floor

31-May-13

08-Aug-12

Report Print Date : 26-Aug-2013

R1 Actual

R2 Actual

Page 12 of 20

R3 Actual

R4 Actual

R5 Actual

R6 Actual

R7 Actual

S2 Block
Activity
Id

Drawing Title

R0 Planned

R0 Actual

A34280

Bottom Reinforcement Layout (1st Floor)

31-May-13

08-Aug-12

A34860

Sixth Floor Layout Plan

31-May-13

08-Aug-12

A35050

Third Floor Layout Plan

31-May-13

08-Aug-12

A34760

M.S. FEATURE STAIRCASE DETAILS


(2nd TO 5th FLOOR)

31-May-13

13-Aug-12

A34230

Beam Schedule For Mezzanine Floor

31-May-13

13-Aug-12

A34260

Beam Schedule For Terrace Floor

31-May-13

13-Aug-12

A34800

Second Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A33950

Bar Bending Schedule (Beam) - 1st Floor

31-May-13

13-Aug-12

A35250

Top Reinforcement Layout (Terrace)

31-May-13

08-Aug-12

A34990

Terrace Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A34010

Bar Bending Schedule (Beam) - Mezzanine


Floor

31-May-13

13-Aug-12

A34480

Fifth Floor Slab Reinft. Details

31-May-13

08-Aug-12

A34820

Second Floor Slab Reinft. Details

31-May-13

08-Aug-12

A34500

Fifth Floor Slab Tendon Layout

31-May-13

08-Aug-12

A35160

Tie Beam Framing Plans (Ground Floor


Level)

31-May-13

08-Aug-12

A34320

Bottom Reinforcement Layout (5th Floor)

31-May-13

08-Aug-12

A34840

Second Floor Slab Tendon Layout

31-May-13

08-Aug-12

A34100

Bar Bending Schedule (Slab) - Terrace


Floor

31-May-13

13-Aug-12

A35020

Terrace Floor Slab Reinft. Details

31-May-13

08-Aug-12

A34060

Bar Bending Schedule (Slab) - 4th Floor

31-May-13

13-Aug-12

A35230

Top Reinforcement Layout (6th Floor)

31-May-13

08-Aug-12

A34400

Excavation Plan & Details

31-May-13

13-Aug-12

A34520

First Floor PT Beam Profile

31-May-13

08-Aug-12

A34560

First Floor Slab Reinft. Details

31-May-13

08-Aug-12

Report Print Date : 26-Aug-2013

R1 Actual

R2 Actual

Page 13 of 20

R3 Actual

R4 Actual

R5 Actual

R6 Actual

R7 Actual

Activity
Id

Drawing Title

R0 Planned

R0 Actual

A34050

Bar Bending Schedule (Slab) - 3rd Floor

31-May-13

13-Aug-12

A34220

Beam Schedule For Fourth Floor

31-May-13

13-Aug-12

A34120

Beam & Slab Framing Plan (First Floor)

31-May-13

08-Aug-12

A34340

Bottom Reinforcement Layout (Mezzanine)

31-May-13

08-Aug-12

A34750

M.S. 'Y' SHAPE COLUMN DETAIL (1ST


TO 4TH FLOOR)

31-May-13

13-Aug-12

A34660

Fourth Floor Slab Tendon Layout

31-May-13

08-Aug-12

A34380

Column Schedule (4 Sheets)

31-May-13

13-Aug-12

A34540

First Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A34850

SECTION DETAILS (FIRST FLOOR)

31-May-13

08-Aug-12

A34150

Beam & Slab Framing Plan (Mezzanine)

31-May-13

08-Aug-12

A35080

Third Floor PT Beam Profile

31-May-13

08-Aug-12

A34310

Bottom Reinforcement Layout (4th Floor)

31-May-13

08-Aug-12

A34490

Fifth Floor Slab Reinft. Section Details

31-May-13

08-Aug-12

A34300

Bottom Reinforcement Layout (3rd Floor)

31-May-13

08-Aug-12

A34030

Bar Bending Schedule (Slab) - 1st Floor

31-May-13

13-Aug-12

A34600

Fourth Floor PT Beam Profile

31-May-13

08-Aug-12

A35060

Third Floor PT Beam Profile

31-May-13

08-Aug-12

A34350

Bottom Reinforcement Layout (Terrace)

31-May-13

08-Aug-12

A34110

Beam & Slab Framing Plan (Fifth floor)

31-May-13

08-Aug-12

A34410

Fifth Floor Layout Plan

31-May-13

08-Aug-12

A34970

Terrace Floor Layout Plan

31-May-13

08-Aug-12

A34390

Combined Footing Details

31-May-13

13-Aug-12

A34940

Staircase Details (Ground Floor)

31-May-13

13-Aug-12

A34140

Beam & Slab Framing Plan (Lift Pit LVL.)

31-May-13

08-Aug-12

A34980

Terrace Floor PT Beam Profile

31-May-13

08-Aug-12

A34720

Lift Pit Level PT Beam Reinft. Details

31-May-13

08-Aug-12

A34360

BRIDGE SECTION DETAILS (FIRST


FLOOR)

31-May-13

08-Aug-12

Report Print Date : 26-Aug-2013

R1 Actual

R2 Actual

Page 14 of 20

R3 Actual

R4 Actual

R5 Actual

R6 Actual

R7 Actual

Activity
Id

Drawing Title

R0 Planned

R0 Actual

A34680

Lift & Shear Wall Details

31-May-13

13-Aug-12

A35140

Third Floor Slab Reinft. Section Details

31-May-13

08-Aug-12

A33970

Bar Bending Schedule (Beam) - 3rd Floor

31-May-13

13-Aug-12

A34200

Beam Schedule For Fifth Floor

31-May-13

13-Aug-12

A35190

Top Reinforcement Layout (2nd Floor)

31-May-13

08-Aug-12

A34960

Standard Beam Sections

31-May-13

13-Aug-12

A34420

Fifth Floor PT Beam Profile

31-May-13

08-Aug-12

A34550

First Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A34630

Fourth Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A35030

Terrace Floor Slab Reinft. Section Details

31-May-13

08-Aug-12

A34670

General Notes

31-May-13

13-Aug-12

A34620

Fourth Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A35090

Third Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A34610

Fourth Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A34890

Sixth Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A35040

Terrace Floor Slab Tendon Layout

31-May-13

08-Aug-12

A34070

Bar Bending Schedule (Slab) - 5th Floor

31-May-13

13-Aug-12

A35150

Third Floor Slab Tendon Layout

31-May-13

08-Aug-12

A34090

Bar Bending Schedule (Slab) - Mezzanine


Floor

31-May-13

13-Aug-12

A34370

Column & Footing Layout Plan

31-May-13

08-Aug-12

A34190

Beam & Slab Framing Plan (Third floor)

31-May-13

08-Aug-12

A34470

Fifth Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A35120

Third Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A36930

LIFT WALL CUTOUT DETAILS

31-May-13

01-Aug-12

A35000

Terrace Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A35010

Terrace Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A34650

Fourth Floor Slab Reinft. Section Details

31-May-13

08-Aug-12

A34930

Sixth Floor Slab Tendon Layout

31-May-13

08-Aug-12

Report Print Date : 26-Aug-2013

R1 Actual

R2 Actual

Page 15 of 20

R3 Actual

R4 Actual

R5 Actual

R6 Actual

R7 Actual

Activity
Id

Drawing Title

R0 Planned

R0 Actual

A34770

Second Floor Layout Plan

31-May-13

08-Aug-12

A35070

Third Floor PT Beam Profile

31-May-13

08-Aug-12

A34460

Fifth Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A34130

Beam & Slab Framing Plan (Fourth floor)

31-May-13

08-Aug-12

A34590

Fourth Floor Layout Plan

31-May-13

08-Aug-12

A35200

Top Reinforcement Layout (3rd Floor)

31-May-13

08-Aug-12

A35100

Third Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A34040

Bar Bending Schedule (Slab) - 2nd Floor

31-May-13

13-Aug-12

A35210

Top Reinforcement Layout (4th Floor)

31-May-13

08-Aug-12

A34440

Fifth Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A34430

Fifth Floor PT Beam Profile

31-May-13

08-Aug-12

A34830

Second Floor Slab Reinft. Section Details

31-May-13

08-Aug-12

A34870

Sixth Floor PT Beam Profile

31-May-13

08-Aug-12

A34290

Bottom Reinforcement Layout (2nd Floor)

31-May-13

08-Aug-12

A34530

First Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A34810

Second Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A34000

Bar Bending Schedule (Beam) - 6th Floor

31-May-13

13-Aug-12

A34510

First Floor Layout Plan

31-May-13

08-Aug-12

A33990

Bar Bending Schedule (Beam) - 5th Floor

31-May-13

13-Aug-12

A34020

Bar Bending Schedule (Beam) - Terrace


Floor

31-May-13

13-Aug-12

A34210

Beam Schedule For First Floor

31-May-13

13-Aug-12

A34920

Sixth Floor Slab Reinft. Section Details

31-May-13

08-Aug-12

A34580

First Floor Slab Tendon Layout

31-May-13

08-Aug-12

A34780

Second Floor PT Beam Profile

31-May-13

08-Aug-12

A34270

Beam Schedule For Third Floor

31-May-13

13-Aug-12

A34170

Beam & Slab Framing Plan (Sixth floor)

31-May-13

08-Aug-12

A35180

Top Reinforcement Layout (1st Floor)

31-May-13

08-Aug-12

A34180

Beam & Slab Framing Plan (Terrace)

31-May-13

08-Aug-12

Report Print Date : 26-Aug-2013

R1 Actual

R2 Actual

Page 16 of 20

R3 Actual

R4 Actual

R5 Actual

R6 Actual

R7 Actual

Activity
Id

Drawing Title

R0 Planned

R0 Actual

A34250

Beam Schedule For Sixth Floor

31-May-13

13-Aug-12

A34330

Bottom Reinforcement Layout (6th Floor)

31-May-13

08-Aug-12

A33980

Bar Bending Schedule (Beam) - 4th Floor

31-May-13

13-Aug-12

A34080

Bar Bending Schedule (Slab) - 6th Floor

31-May-13

13-Aug-12

A34950

STAIRCASE DETAILS (TYPICAL FLOOR)

31-May-13

13-Aug-12

A35130

Third Floor Slab Reinft. Details

31-May-13

08-Aug-12

A35240

Top Reinforcement Layout (Mezzanine)

31-May-13

08-Aug-12

A34240

Beam Schedule For Second Floor

31-May-13

13-Aug-12

A34160

Beam & Slab Framing Plan (second floor)

31-May-13

08-Aug-12

A34710

Lift Pit Level PT Beam Profile

31-May-13

08-Aug-12

A34730

Lift Pit Level PT Beam Reinft. Details

31-May-13

08-Aug-12

A34790

Second Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A35110

Third Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A33960

Bar Bending Schedule (Beam) - 2nd Floor

31-May-13

13-Aug-12

A34880

Sixth Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A34640

Fourth Floor Slab Reinft. Details

31-May-13

08-Aug-12

A34910

Sixth Floor Slab Reinft. Details

31-May-13

08-Aug-12

A34690

Lift Pit Level Layout Plan

31-May-13

08-Aug-12

A34450

Fifth Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A34900

Sixth Floor PT Beam Reinft. Details

31-May-13

08-Aug-12

A34700

Lift Pit Level PT Beam Profile

31-May-13

08-Aug-12

A35220

Top Reinforcement Layout (5th Floor)

31-May-13

08-Aug-12

A34570

First Floor Slab Reinft. Section Details

31-May-13

08-Aug-12

A35170

Tie Beam Section Details

31-May-13

08-Aug-12

R0 Planned

R0 Actual

R1 Actual

R2 Actual

R3 Actual

R4 Actual

R5 Actual

R6 Actual

R7 Actual

R1 Actual

R2 Actual

R3 Actual

R4 Actual

R5 Actual

R6 Actual

R7 Actual

Utility1 Block
Activity
Id

Drawing Title

Report Print Date : 26-Aug-2013

Page 17 of 20

Activity
Id

Drawing Title

R0 Planned

R0 Actual

A35470

Column & Footing Sections (2 Sheets)

31-May-13

08-Aug-12

A35380

3RD PT SLAB PT BEAM TENDON


PROFILE-01

31-May-13

08-Aug-12

A35660

Shear Wall Details

31-May-13

08-Aug-12

A35300

1ST PT SLAB PT BEAM TENDON


LAYOUT PLAN.

31-May-13

08-Aug-12

A35760

UG TANK TOP SLAB TOP STEEL


LAYOUT PLAN

31-May-13

08-Aug-12

A35320

2ND PT SLAB BEAM PROFILE-01

31-May-13

08-Aug-12

A35710

TYPICAL BEAM ANCHORAGE DETAILS

31-May-13

08-Aug-12

A35700

Terrace Slab And Beam Framing

31-May-13

08-Aug-12

A35410

4TH PT SLAB BEAM PROFILE-02

31-May-13

08-Aug-12

A35740

UG TANK TOP SLAB FRAMING PLAN

31-May-13

08-Aug-12

A35350

3RD PT SLAB FRAMING PLAN.(FIRST


FLOOR)

31-May-13

08-Aug-12

A35620

MEZZANINE FLOOR TOP STEEL


LAYOUT PLAN

31-May-13

08-Aug-12

A35400

4TH PT SLAB BEAM PROFILE-01

31-May-13

08-Aug-12

A35720

UG TANK TOP SLAB BEAM SCHEDULE

31-May-13

08-Aug-12

A35330

2ND PT SLAB BEAM PROFILE-02

31-May-13

08-Aug-12

A35690

STANDARD BEAM SECTIONS

31-May-13

08-Aug-12

A35500

FIRST FLOOR BEAM & SLAB FRAMING


PLAN

31-May-13

08-Aug-12

A35750

UG TANK TOP SLAB PT BEAM FRAMING


PLAN & PT BEAM TENDON LAYOUT
PLAN, PT BEAM PROFILE.

31-May-13

08-Aug-12

A35670

Slab Top & Bottom Steel Layout Plan

31-May-13

08-Aug-12

A35680

Staircase Details

31-May-13

13-Aug-12

A35600

MEZZANINE FLOOR SLAB BEAM


SCHEDULE

31-May-13

08-Aug-12

A35280

1ST PT SLAB BEAM PROFILE-03

31-May-13

08-Aug-12

A35540

General Notes

31-May-13

08-Aug-12

Report Print Date : 26-Aug-2013

R1 Actual

R2 Actual

Page 18 of 20

R3 Actual

R4 Actual

R5 Actual

R6 Actual

R7 Actual

Activity
Id

Drawing Title

R0 Planned

R0 Actual

A35450

BEAM SCHEDULE TANK TOP SLAB

31-May-13

08-Aug-12

A35730

UG TANK TOP SLAB BOTTOM STEEL


LAYOUT PLAN

31-May-13

08-Aug-12

A35480

Column Schedule

31-May-13

08-Aug-12

A35420

4TH PT SLAB FRAMING PLAN.

31-May-13

08-Aug-12

A35490

Excavation Plan & Details

31-May-13

08-Aug-12

A35260

1ST PT SLAB BEAM PROFILE-01

31-May-13

08-Aug-12

A35590

MEZZANINE FLOOR BEAM & SLAB


FRAMING PLAN

31-May-13

08-Aug-12

A35650

SECTION DETAILS FOR UGT TOP SLAB


& GROUND FLOOR SLAB

31-May-13

08-Aug-12

A35290

1ST PT SLAB FRAMING PLAN.(GROUND


FLOOR)

31-May-13

08-Aug-12

A35270

1ST PT SLAB BEAM PROFILE-02

31-May-13

08-Aug-12

A35570

GROUND FLOOR SLAB BOTTOM STEEL


LAYOUT PLAN

31-May-13

08-Aug-12

A35630

Raft Layout Plan & Details

31-May-13

08-Aug-12

A35440

Beam schedule

31-May-13

08-Aug-12

A35510

FIRST FLOOR SLAB BEAM SCHEDULE

31-May-13

08-Aug-12

A35430

4TH PT SLAB PT BEAM TENDON


LAYOUT PLAN.

31-May-13

08-Aug-12

A35460

Column & Footing Layout Plan

31-May-13

08-Aug-12

A35390

3RD PT SLAB PT BEAM TENDON


PROFILE-02

31-May-13

08-Aug-12

A35340

2ND PT SLAB FRAMING


PLAN.(MEZZANINE FLOOR)

31-May-13

08-Aug-12

A35550

GROUND FLOOR BEAM & SLAB


FRAMING PLAN

31-May-13

08-Aug-12

A35310

2ND PT BEAM TENDON LAYOUT PLAN.

31-May-13

08-Aug-12

A35610

MEZZANINE FLOOR SLAB BOTTOM


STEEL LAYOUT PLAN

31-May-13

08-Aug-12

A35640

Rock Anchor Layout Plan

31-May-13

08-Aug-12

A35580

GROUND FLOOR TOP STEEL LAYOUT

31-May-13

08-Aug-12

Report Print Date : 26-Aug-2013

R1 Actual

R2 Actual

Page 19 of 20

R3 Actual

R4 Actual

R5 Actual

R6 Actual

R7 Actual

Activity
Id

Drawing Title

R0 Planned

R0 Actual

R1 Actual

R2 Actual

PLAN
A35370

3RD PT SLAB PT BEAM TENDON


LAYOUT PLAN.

31-May-13

08-Aug-12

A35560

GROUND FLOOR SLAB BEAM


SCHEDULE

31-May-13

08-Aug-12

A35530

FIRST FLOOR TOP STEEL LAYOUT


PLAN

31-May-13

08-Aug-12

A35360

3RD PT SLAB PT BEAM PROFILE-03

31-May-13

08-Aug-12

A35520

FIRST FLOOR SLAB BOTTOM STEEL


LAYOUT PLAN

31-May-13

08-Aug-12

Report Print Date : 26-Aug-2013

Page 20 of 20

R3 Actual

R4 Actual

R5 Actual

R6 Actual

R7 Actual