Vous êtes sur la page 1sur 1
@ tain conection rom ® main conectone SERVICES: CONNECTIONS In houses for one and twa families there is ne necessity for {mains connection room. Mains connections rooms should be planned in collaboration withthe mains service providers. They must be in locations which can be accessed easily by all (eg. off the Staircase or cellar corridor, or reached directly from outside) ‘and they must not be used for through passage, They have to 'be on an outside wal, through which the connections can be routed ()-/2) Walls should have a fire resistance of at least 30 (minutes). Doors should be at least 650/1950mm. With district heating schemes, the door must be lockable. A floor ‘gully must be provided where there is connection to water or district heating mains. Mains connections rooms must be Ventilated to the open air. The room temperature must Not ‘exceed 30°, the temperature ofthe drinking water should not ‘exceed 25°C, and the room must not be susceptible to frost For up to 30 dwellings, or with istrict heating for about >1.80m, length 200m, height 200m (D. For up to approximately 60 dwellings or where theres district heating for 30 dwellings: 180m wide, 3.5m long, 20m high @ ‘ier ot manboes Ol- qt © Pron nesaion n

Vous aimerez peut-être aussi