Académique Documents
Professionnel Documents
Culture Documents
DATA FOR BIG POT HOLES USING 40MM METAL ( 70mm and above)
1 Providing B.T. Patchwork for pot holes of depth ranging from 70mm and above, using 40mm HBG metal with required
quantity of 10-12mm size HBG key chips and 80/100 grade Bitumen at 42 Kgs /1Cum of work for filling the pot holes
and sealing the filled up pot hole with a 15mm thick layer using 10-12mm HBG chips and 80/100 grade bitumen 72
kgs / cum including removal of the loose material in the pot holes trimming the edges to provide firm vertical faces
cleaning applying tack coat, filling the pot holes, compacting and finishing and blinding the surface using dust, including
cost of all materials, T&P, and labour charges for all operations etc. complete.
Unit - 1 sqm
Amount
Quantity
Rate
Material
40mm Metal (Machine crushed)
1.00
1.00
0.055
1.10
=
0.0605 cum
1237.98 1 cum
74.90
10-12mm Metal (Machine crushed)
1.00
1.00
0.055
0.13
=
0.0072 cum
1477.98 1 cum
10.64
Bitumen
80/100 grade at 42 kgs per cum
1.00
1.00
0.055 42.00 =
2.3100 Kg
36448.16 1 M.T
84.20
For Sealing the pot hole
Material
10-12mm Metal (Machine crushed)
1.00
1.00
0.015
1.33
=
0.0200 cum
1477.98 1 cum
29.56
stonedust.
1.00
1.00
0.003
1.00
=
0.0030 cum
920.35 1 cum
2.76
80/100 grade Bitumen at 72 kgs per cum
Labour Charges
for 40mm Metal (Machine crushed)
( 2.86 X 295.00 = 843.70 )
10-12mm Metal (Machine crushed)
( 2.86 X 295.00 = 843.70 )
1.00
1.00
0.015
72.00
1.0800
Kg
1.00
1.00
0.055
1.00
0.0550
1.00
1.00
0.015
1.00
36448.16 1 M.T
39.36
cum
843.70 1 cum
46.40
0.0150
cum
843.70 1 cum
12.66
0.055
0.015
cum
cum
40.00
40.00
or say Rs.
1 cum
1 cum
Total Rs.
2.20
0.60
303.28
0.00
303.28
303.30
LEADS
Name of work:-
0.22
11.60
27.70
5.20
0.15
44.87
or say
45.00 Km
605.40
20.60
5.20
0.15
631.35
or say
631.00 Km
0.55
41.50
20.60
5.20
0.15
68.00
or say
68.00 Km
Dy.Executive Engineer(R&B)
Sub -division : Siddipet.
Executive Engineer(R&B)
Division::Siddipet
vbjxfqqQ4
Name of Work:- Periodical Maintenance to Dumpalapally road to Gandhi Statue in Dubbak town in Medak District.
Km.12/500
S/L
KM.11/000
D/L
Shilaji Nagar village limits. ( Existing 5.5 m width either side with Divider)
KM 10/700
S/L
KM.9/050
D/L
Ghambeerpur village limits ( Existing 5.5 m width either side with Divider)
KM.8/900
S/L
Km 5/800
D/L
Cheekodu village limits ( Existing 5.5 m width either side with Divider)
Km.5/150
S/L
KM 0/0
Dubbaka
District.
Name of work :
Periodical Maintenance to Dumpalapally road to Gandhi Statue in Dubbak town in Medak District.
CROSS SECTION OF THE ROAD
12.00m
2.50
Shoulders
7.00M
2.50
SDBC
Shoulders
B.M.
W.M.M
G.S.B
1.67m
G.S.B
3.66 m
1.82 m
1.97
7.00m
BC
30mm thick
DBM
50mm thick
W.M.M
250mm thick
G.S.B
230 mm thick
KEY MAP
Name of Work:
Periodical Maintenance to Dumpalapally road to Gandhi Statue in Dubbak town in Medak District.
12/500
MMS road
Ramakkapet
39/3
39/6
0/0 2/2
18/0
1/8
Dubbak-Kothapally road
I-D road
Laxmipur
0/0 '5/5
8/0
Dubbak
2/7
'3/8
14/6
Dubbak to meet
M-S road
Nagpur
1/8
8/0
Nizamabad
9/0
0/0
30/0 34/2
0/0
0/0
5/6 2/6
0/0
2/0
Nandigama
36/0
0/0 Pothareddy
0/2
4/2 11/2
14/0 47/6
Raorukula
Habshipur
District border
road
8/0 43/6
Pur
M-S road
Rampur
41/2
Raghava
17/0
Jakkapur to meet
Bhoompally to
11/8
12/8
Enagurthy
7/8
Dubbak
2/2 9/2
road
Branch road
Thornal
7/6
Narayanrao
Rampur
road
39/0
Bhoompally
40/0
8/8
41/8
Chittapur
47/6 0/0
Habshipur
pet
49/4
Dharmaram
52/4 24/4
53/6
Jakkapur Thimma
to M-S roa
Pur
57/6 0/0
Thornala
67/6
65/9
Siddipet
Pipe factory
Branch road to Akkannapet
0/0 1/3
R-D
road
Bussapur-Thimmayapally
road
12/2
Pullimamidi road
0/0
Bussapur
Akkannapet
7/0
Uppulingapur
19/2
402/2+0.2
Metal
Crusher
Hyderabad
GOVERNMENT OF TELANGANA
Periodical Maintenance to
Dumpalapally road to Gandhi Statue in
Dubbak town in Medak District.
AMOUNT OF ESTIMATE
Rs 6.00
Lakhs
Assembly Constituency ::
Dubbak
Parliament Constituen ::
Medak
(R&B) Circle
::
SANGAREDDY.
(R&B) Division
::
SIDDIPET
::
Siddipet
(R&B) Section
::
Ramayampet
SPECIFICATION REPORT
6.00
Lakhs
Dubbak town is very important business place and having Agriculture Market yards
etc., The people from the sourrounding villages daily visit for their needs, the internal roads in the
Dubbak town are badly damaged forming big pot holes causing lot of inconvieneance to the
vehicular traffic & pedastrians. Hence taking up renewals on these roads are urgently required.
This Dubbak town connects number of villages in remote area which helps the rural people for
transportation of vegitables and food grains to near by major town Dubbaka.
The Hon'ble
Estimate Committee Chairman Telangana State & Hon'ble MLA Dubbak Assembly Constituency in
Medak District, Sri Solipeta Rama Linga Reddy Garu is proposed to remew the existing BT
surface for improvement of road condition.
Hence, the Estimate is prepared with the following provisions .
1
2
3
4
5
6
7
8
9
Patch Work
Tack coat:
Providing & Laying BC with 30mm
LS Provision for VAT @ 5%
LS Provision for Q.C. Charges @ 1%
LS Provision for NACF @ 0.10%
LS Provision for Price Adjustment .
Provision for Avagahana Sadassulu.
LS for unforseen items and rounding off.
The estimate is prepared based on common SSR 2014-15 and nearest quarries are
adopted. The work will be carried out as per IRC and MoRT&H ( 4 th revision ) specifications and
relevant circulars issued from time to time .
GENERAL ABSTRACT
Name of work:-
Road Work
Rs 523,540.00
Rs 523,540.00
Rs 26,177.00
Seigniorage charges
Rs 5,235.00
Rs 524.00
Rs 3,344.00
Rs 16,000.00
Rs 2,500.00
Rs 22,680.00
Rs 6 00 000.00
say Rs.
6.00
lakhs
Sl.
No
.
1
Name of work :- Periodical Maintenance to Dumpalapally road to Gandhi Statue in Dubbak town
in Medak District.
Description of
item
2
No.
3
Measurements
Length Breadth Depth
4
5
6
Quantity
Rate per
Amount
10
1 Providing B.T. Patch work for pot holes using 40mm HBG metal with required quantity of 1012mm size HBG key chips and 80/100 grade Bitumen including removal of the loose
material in the Pot holes, trimming the edges to providing the edges to provide firm vertical
faces cleaning, applying tack coat, filling the pot holes duly tamping to fill all voids and
compacting with P.R.R. etc., complete as directed by the Engineer-In-Charge.
20.00
Cum
4601.00
1cum
92020.00
2 Providing and applying tack coat with bitumen Emulsion (Medium settting) (Bulk) using
Emulsion pressure distributor at the rate of 0.20 kgs per sqm on the prepared
bituminous/granular surface cleaned with mechanical broom for finished item of work as per
MoRT&H Specification 503 (4th revision) and as directed by the Engineer-in-Charge.
for BC
1
400.00
3.75
1500.00
1500.00
sqm
10.60
1sqm
15900.00
3 Providing 30/40 mm thick compacted Bituminous Concrete with 100-120 TPH Batch type hot
mix plant / 40-60 TPH hot mix plant using hard blasted granite crushed aggregates of
Grading 2 as per table 500-17 of specification 507 of MoRT&H (5th revision), premixed
with Butumen 60/70 Grade( VG-30 )@ 5.4% of mix and filler, transporting the hot mix to
work site, laying with mechanical paver finisher to the required grade, level and alignment,
rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction
as per MoRT&H Specification 507 (5th revision) complete for finished item of work in all
respects excluding seignorage charges and as directed by Engineer-in-Charge (Excluding
VAT Charges)
1
400.00
3.75
0.030
45.00
45.00 cum
9236.00
1 cum
415620.00
Total Rs.
523540.00
SEIGNIORAGE CHARGES
Periodical Maintenance to Dumpalapally road to Gandhi Statue in Dubbak town
in Medak District.
Sno
Seigniorag
e
Item
Qty
Co-ef
Rate
Amount
1.486
50.00
3343.50
Road Work
1
Providing 30 mm thick
compacted
Bituminous
Concrete
Metal
45.00
Total
3344.00
DATAS
Name of Work ::- Periodical Maintenance to Dumpalapally road to Gandhi Statue in Dubbak
town in Medak District.
Quantity
Description of Item
Rate
per
Amount
Providing and applying tack coat with bitumen emulsion using medium setting (Bulk) emulsion
pressure distributor at the rate of 0.20 kgs per sqm on the prepared bituminous/granular surface
6 19
cleaned with mechanical broom for finished item of work as per MoRT&H Specification 503 (4 th
revision) and as directed by the Engineer-in-Charge.
unit = sqm
Taking output = 3500 sqm
(A) Labour
0.08 nos
Mate
2.00 nos
Mazdoor
Total
(B) Machinery
345.00
295.00
day
day
27.60
590.00
617.60
2.80 hr
357.00
hr
999.60
2.80 hr
507.50
hr
1421.00
2.00 hr
860.00
hr
1720.00
Total
(C) Material
0.70 MT
Bitumen emulsion @ 0.20 Kgs/sqm
38920.62
Total
(D) Over head charges @ 5%
5.00 %
Add for Over head charges @ 5% on (A)+(B)+( C)
(E) Total of (A) + (B)+( C)+(D)
(F) Add Contractors Profit at 10% on (E)
Cost per 3500 sqm (E) + (F)
Rate per 1 sqm
Rate to be adopted
4140.60
MT
27244.43
27244.43
1600.13
33602.76
3360.28
36963.04
10.56
10.60
1 Sqm
Providing B.T. Patch work for pot holes using 40mm HBG metal with required quantity of 10-12mm
size HBG key chips and 80/100 grade Bitumen including removal of the loose material in the Pot
holes, trimming the edges to providing the edges to provide firm vertical faces cleaning, applying tack
coat, filling the pot holes duly tamping to fill all voids and compacting with P.R.R. etc., complete as
directed by the Engineer-In-Charge.
2.86
a)
day
b)
0.27
0.042
hour
c)
MT
1.20
0.13
cum
cum
Unit = 1 cum
Taking out put = 1 cum
Labour
Man Mazdoor
Machine
ry
Hire Charges of P.R.R.
Material
Cost of Bitumen of 80/100 grade
Agreegates
40mm to 45 mm
9.5mm to 11.20mm
L.S. towards T & P
Total (A + B + C )
Cost per 1 cum
295.00
day
843.70
1146.70
hour
309.61
39913.30
MT
1676.36
1293.25
1378.25
cum
cum
1551.89
179.17
40.00
4600.73
4601.00
1 cum
14
Quantity
Description of Item
Rate
per
Amount
Providing 30mm thick compacted Bituminous Concrete with 100-120 TPH batch type hot mix plant/
40-60 TPH hot mix plant using HBG crushed aggregates of Grading 2 as per table 500-17 of
specification 507 of MoRT&H (5th revision), premixed with bitumen VG-30 grade @ 5.4% of mix and
filler, transporting the hot mix to work site, laying with mechanical paver finisher to the required
grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the
desired compaction as per MoRT&H Specification 507 (5th revision) complete for finished item of
work in all respects as directed by Engineer-in-Charge
0.84
14.00
5.00
6.00
6.00
6.00
6.00
3.90
Unit = cum
Taking output = 191 cum (450 tonnes.)
(A)
Labour
nos. Mate
nos. Mazdoor working with HMP, Mechanical
broom, paver,roller,asphalt cutter and
assistance for setting outlines,levels and
construction.
nos. layout
Skilledof
Mazdoor
for checking line and levels.
Total
(B)
Machinary
Batch mix HMP
hr
hr
Mechanical Paver finisher @ 100 TPH
Generator 250 KVA
hr
Front end loader 1 cum capacity
hr
hr
Power road roller 8 tonne for
initial break down rolling
3.90
3.90
hr
hr
(C)
24.30
M.T
cum
85.140
cum
70.950
day
289.80
295.00
day
4130.00
357.00
day
1785.00
6204.80
24171.00
2249.00
1850.00
1646.00
hr
hr
hr
hr
145026.00
13494.00
11100.00
9876.00
1146.70
hr
4472.13
2678.30
hr
10445.37
1646.00
hr
6419.40
200832.90
40843.54
MT
1455.75
992498.02
123942.18
1283.25
cum
91046.28
885.75
cum
108091.08
828.25
2.36mm and below @ 2%
Total
Over head charges @ 5%
Add for Over head charges @ 5 % on (A)+(B)+( C)
%
Total of (A) + (B)+( C)+(D)
Add Contractors Profit at 10% on (E)
Cost per 191 cum
Rate per 1 cum
Rate to be adopted
cum
4696.15
1320273.71
122.03
5.67
(D)
5.00
(E)
(F)
1.486
cum
76365.57
1603676.98
160367.70
1764044.7
9235.84
9236.00
1 Cum
1 Sqm
Quantity
Description of Item
Rate
per
Amount
1.10
57.60
22.00
SAY
=
=
4.40 km
4.80 km
=
=
=
11.00 km
20.20 km
20.00 km
26.70
22.00
22.00
SAY
1.10
104.00
67.00
9.20
22.00
22.00
SAY
=
=
26.50 km
4.70 km
=
=
=
11.00 km
42.20 km
42.00 km
=
=
=
=
=
=
0.55
41.50
0.60
0.00
9.20
22.00
=
=
=
11.00 km
84.85 km
85.00 km
km
km
km
km
km
km
Section : Ramayampet
Sub-Division Siddipet
Division Siddipet
INSPECTION CERTIFICATE
and
the
lands
available
are
free
from
encumbrance,
Certified that :
1)
2)
3)
4)
5)
COST OF BITUMEN / MT
Name of Work
Periodical Maintenance to Dumpalapally road to Gandhi Statue in Dubbak town in Medak District.
Ref ::- For Emulsion (Bulk) :- HINCOL Price List With Effect From Dt: 16-07-2015
For Bulk BitumenVG10, VG30:- HPCL Price List With Effect From Dt: 16-07-2015
Bulk VG10 Grade
Bulk VG 30 Grade
Emulsion (Bulk)
Vizag
Vizag
Vizag
Basic Price
Sales Tax @ 2%
Total Price
37304.22
38216.22
36331.00
746.08
764.32
726.62
38050.30
38980.54
37057.62
1863.00
1863.00
1863.00
39913.30
40843.54
38920.62
Lead from
Visakhapatnam
621.00
Lead charges for Bulk
@
1242 kms
1.50
Kms
per KM
Sl. No
Description of Metal
Lead in Conveyan
Kms
ce
Initial cost
Machine Seignior
Blasting
less
crushing
age
charges
stacking
charges charges
Deduct
stacking
charges for
conveyance
Qry at Km
115/6+0.2Km
on Rajiv
Rahadari
45.00
488.25
588.00
70.00
147.00
"
45.00
488.25
944.00
70.00
236.00
"
45.00
488.25
984.00
70.00
246.00
"
45.00
488.25
780.00
70.00
195.00
"
45.00
488.25
656.00
70.00
164.00
"
45.00
488.25
504.00
70.00
126.00
"
45.00
488.25
308.00
70.00
77.00
"
45.00
488.25
340.00
0.00
0.00
5.00
73.77
103.00
0.00
0.00
45.00
488.25
620.00
70.00
155.00
45.00
45.00
994.00
1036.00
70.00
70.00
248.50
259.00
822.00
692.00
70.00
70.00
205.50
173.00
532.00
70.00
133.00
Gravel
B) FOR C.D. WORKS
10
11
12
13
14
45.00
45.00
15
45.00
488.25
488.25
488.25
488.25
488.25
68.00
700.09
606.00
68.00
700.09
700.09
462.00
Qry at Km
115/6+0.2Km
on Rajiv
Rahadari
SAND
QUARRY AT
KM. 145/5 +
0.50 km CT on
Rajiv Rahadari
16
17
18
19
20
21
22
23
24
25
342.00
6200.00
43000.00
45000.00
45000.00
167.470 2250.96
210.200 3689.48
359.950 5762.55
1293.25
1738.25
1788.25
1533.25
1378.25
1188.25
943.25
828.25
176.77
1333.25
1800.75
1853.25
1585.75
1423.25
1223.25
1306.09
1162.09
1042.09
6200.00
43000.00
45000.00
45000.00
2418.43
3899.68
6122.50
S.No
1
2
3
4
Lead Distance
Item
Metal
Sand
Gravel
Hume Pipes
Periodical Maintenance to Dumpalapally road to Gandhi Statue in Dubbak town in Medak District.
Km
45.00
68.00
5.00
24.00
S.No
1
2
3
S.No
1
2
3
4
652.00Kms
wn in Medak District.
Name of work :
Design of Crust for Widening and Strenghthening of the existing Single lane.
DATA : I) Single - Lane Carriageway
II) Initial Traffic in each direction in the year of completion of construction
A = P(1+r)n
P = Number of Commercial Vehicles as per last count =
899
n = Number of Years between the last count and the year of
completion of construction i.e., 2010-2015 = 5 Years
r = Annual grouth rate of the commercial vehicle 7.5% = 0.075
(1 + 0.075)5
A=
899
= 1200.587
III) Design life = 10 years
IV) Design CBR or Sub Grade soil = 5% (as per site condition )
V) Traffic Grouth rate = 7.50% = 0.075
VI) Vehicle damage factor = 3.5 as per table 1 of VDF values.
Design Calculation
I) Distribution factor para 3.3.5.1(iii) = 75% = 0.75
II) Vehicle damage factor = 3.50
III) Cummulation number of standard axles to be carred during
a) Design life of 10 years
N=365 {[1+0.075)^10 -1} X 1200.587 x 0.75 X 3.50
0.075 X 10,00,000
= 16.274 msa or
17.00 msa
IV) Pavement thickness and composition and plate-I for CBR 8% and
traffic range
17.00
msa
a) For 10 years life
Total Pavement thickness for traffic
17.00
GSB
WMM
DBM
BC
17.00
250
250
50
30
580 mm thick
Pavement composition proposed in the estimate
GSB
WMM
BM
SDBC
150
250
50
25
475
mm thick
mm thick
mm thick
mm thick
mm thick
Section : Ramayampet
Sub-Division Siddipet
Division :Siddipet
Name of work :
Periodical Maintenance to Dumpalapally road to Gandhi Statue in Dubbak town in Medak District.
CROSS SECTION OF THE ROAD
10.00m
1.50
7.00M
Shoulders
1.50
BC
Shoulders
DBM
W.M.M.
W.M.M.
G.S.B
G.S.B
1.82 m
3.66 m
7.00m
BC
30 mm thick
DBM
50 mm thick
W.M.M
250 mm thick
G.S.B
200 mm thick
Sl.
No.
1
Measurements
No. Length Breadth
3
4
5
Description of item
2
Depth
6
Quantity
Rate
Amount
or say
85.72
85.80
cum
27.00 1 cum
2317.00
2 Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone
aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost &
conveyance of all materials to site and labour charges, centering, machine mixing, laying,
Vibrating, curing etc., including all other incidental and operational charges of all T&P
etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100
(4th Revision) and as directed by the Engineer-in-Charge for foundations of HP culverts
for Body walls
under pipe
1
1
2
9.00
1.40
0.30
7.56
1
10.40
3.30
0.30
10.30
(10.40+11.60)/2
Encasing pipes
1 1
11.00
3.30
1.50
54.45
(1.2*1.2) (10.4+11.3)/2
Deduct Pipe Porti 1 2
0.786
1.44
10.85
-24.56
Total
47.75
or say
47.80
Cum
cum
3 Providing Vibrated Cement Concrete ( 1:3:6 ) using 40mm size HBG crushed stone
aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost,
conveyance of all materials to site and labour charges, centering, machine mixing, laying,
vibrating, curing etc., including all other incidental and operational charges of all T&P
etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2200
(4th Revision) and as directed by the Engineer-in-Charge for body walls of HP Culverts.
1
1
2
2
9.00
8.00
0.786
(1.20+0.45)/
2 0.83
31.93
2.15
3.24
0.45
0.45
(1.2*1.2) (1.05+0.60)/2
1.44
0.83
-3.74
Total
31.43
or say
31.50
cum
4 Providing, laying Reinforced cement concrete Hume pipes of 800mm/1000mm Dia., NP-3
class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour
charges for laying, jointing of 800mm/1000mm dia. R.C.C Hume pipes in position
including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H
Specification 2900, 2905 and 2906 (4th Revision) and IRC Special Publication No: 13 and
as directed by the Engineer-in-Charge for finished item of work.
1000mm dia
2.50
25.00 RM
7203.00 1 R M
180075.00
###
CD - DATAS
Name of Work ::- Periodical Maintenance to Dumpalapally road to Gandhi Statue in Dubbak
town in Medak District.
Quantity
1
29
Description of Item
Rate
per
Earthwork excavation in soils upto SDR by mechanical means for foundations of structures as per
drawing and technical specification including setting out, construction of shoring and bracing, removal
of stumps and other deleterious matter, dressing sides of bottom, back filling the excavation earth to
the extent required etc., complete for finished item of work as per MoRT&H specification 304(4 th
Revision) and as directed by the Engineer-in-Charge
Unit : Cum
Taking out put = 240 Cum
(A) Labour
0.32 day
8.00 day
Mate
Mazdoor unskilled
(B) Machinery
240.00 cum
Rate as per G.O. Ms No 10, Dt 26/7/2005
345.00
295.00
day
day
110.40
2360.00
2470.40
13.00
cum
3120.00
279.52
5869.92
586.99
6456.91
6456.91
26.90
27.00
1 Cum
1 Cum
Amount
Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone aggregate and
fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to
site and labour charges, centering, machine mixing, laying, Vibrating, curing etc., including all other
31
incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H
specification 1500,1700, 2100 (4th Revision) and as directed by the Engineer-in-Charge for
foundations of HP culverts
Unit = cum
Page 331 of MoRT&H SDB
Taking output = 15 cum
(A)
0.64
1.00
15.00
Labour
Day
Day
Day
Mate
Mason
Mazdoor
Total
(B)
13.50
6.75
3.45
Material
cum
Cost of 40mm SS-5 HBG M/C metal
cum
Sand at site
MT
Cement at site
Total
Machinery
6.00 hr
Concrete mixer 0.4/0.28 cum
6.00 hr
Generator set 35 KVA
Page 58
345.00
357.00
295.00
day
day
day
220.80
357.00
4425.00
5002.80
1333.25
1306.09
6200.00
cum
cum
MT
17998.82
8816.09
21390.00
48204.91
453.00
861.70
hr
hr
2718.00
5170.20
Quantity
2.00 hr
(D)
5.00
(E)
(F)
Description of Item
Rate
Water tanker 6 KL capacity
624.00
Total
Over head charges @ 5%
%
Add for Over head charges @ 5% on (A)+(B)+( C)
Total of (A) + (B)+( C)+(D)
Add Contractors Profit at 10% on (E)
per
hr
3117.20
65461.11
6546.11
72007.22
72007.22
4800.48
4800.00
1 Cum
Amount
1248.00
9136.20
Providing Vibrated Cement Concrete ( 1:3:6 ) using 40mm size HBG crushed stone aggregate and
fine aggregate conforming to table 1000-2 of MoRT&H including cost, conveyance of all materials to
site and labour charges, centering, machine mixing, laying, vibrating, curing etc., including all other
32
incidental and operational charges of all T&P etc., complete for finished item of work as per MoRT&H
specification 1500,1700, 2200 (4th Revision) and as directed by the Engineer-in-Charge for body
walls of HP Culverts.
Unit = cum
Page331,455 of MoRT&H SDB
Taking output = 15 cum
(A)
0.64
1.00
15.00
Labour
Day
Day
Day
(B)
13.50
6.75
3.45
Material
cum
Cost of 40mm SS-5 HBG M/C metal
cum
Sand at site
MT
Cement at site
Total
Machinery
hr
Concrete mixer 0.4/0.28 cum
hr
Generator set 35 KVA
hr
Water tanker 6 KL capacity
6.00
6.00
2.00
(D)
10.00
(E)
5.00
(F)
(G)
Mate
Mason
Mazdoor
Total
345.00
357.00
295.00
day
day
day
220.80
357.00
4425.00
5002.80
1333.25
1306.09
6200.00
cum
cum
MT
17998.82
8816.09
21390.00
48204.91
453.00
861.70
624.00
hr
hr
hr
2718.00
5170.20
1248.00
9136.20
Cum
6234.39
Form work
%
Form work @ 10% on (A)+(B)+( C)
62343.91
Over head charges @ 5%
%
Add for Over head charges @ 5% on (A)+(B)+( C)+(D)
Total of (A) + (B)+( C)+(D)+(E)
Add Contractors Profit at 10% on (F)
Cost per 15 cum (F)+(G)
Rate for 1 cum
Rate to be adopted
Page 59
3428.92
72007.22
7200.72
79207.94
79207.94
5280.53
5281.00
1 Cum
Quantity
3
33
Description of Item
Rate
per
Amount
Providing, laying Reinforced cement concrete Hume pipes of 600mm/800mm/1000mm Dia., NP-3
class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour charges for
laying, jointing of 600mm/800mm/1000mm dia. R.C.C Hume pipes in position including lifting,
aligning, lowering and hoisting etc., as per drawing and as per MoRT&H Specification 2900, 2905
and 2906 (4th Revision) and IRC Special Publication No: 13 and as directed by the Engineer-inCharge for finished item of work.
Unit = metre
Page 272,273 of MoRT&H SDB
Taking output = 12.5 metre
1000 mm Dia.,
(A)
0.18
0.50
4.00
Labour
nos
nos
nos
Mate
Mason
Mazdoor
Total
(B) Material
12.50 RM
Cost of 1000mm Dia., pipes
Total
(C) Over head charges @ 5%
5.00 %
Add for Over head charges @ 5% on (A)+(B)
(D) Total of (A) + (B)+( C)
(E) Add Contractors Profit at 10% on (D)
Cost per 12.5 metre (D)+(E)
Rate for 1 RM
Rate to be adopted
Page 60
345.00
357.00
295.00
day
day
day
62.10
178.50
1180.00
1420.60
6122.50
RM
76531.27
76531.27
3897.59
81849.46
8184.95
90034.41
7202.75
7203.00
1 RM
Quantity
Description of Item
Page 61
Rate
per
Amount
LEAD CHARGES
Earth/Gravel/
Sand
loading
46.05
unloading
13.95
stacking
0.00
0.25
0.00
0.5
0.00
1
2
3
4
5
6
7
27.63
38.68
51.67
62.72
73.77
84.82
95.88
26.67
37.37
51.67
62.72
73.77
84.82
95.88
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
106.93
117.98
129.04
140.09
151.14
162.19
173.25
184.30
195.35
206.40
217.46
228.51
239.56
250.61
261.667
272.72
283.77
294.82
305.88
316.93
327.98
339.04
350.09
359.30
368.51
377.72
386.93
396.14
405.35
414.56
423.77
432.98
442.19
451.40
460.61
469.82
479.04
488.25
497.46
106.93
117.98
129.04
140.09
151.14
162.19
173.25
184.30
195.35
206.40
217.46
228.51
239.56
250.61
261.667
272.72
283.77
294.82
305.88
316.93
327.98
339.04
350.09
359.30
368.51
377.72
386.93
396.14
405.35
414.56
423.77
432.98
442.19
451.40
460.61
469.82
479.04
488.25
497.46
Material Rates
60 to 63 mm IRC & MoRTH HBG metal
50 to 55 mm IRC & MoRTH HBG metal
40 to 45 mm IRC & MoRTH HBG metal
Roughstone 300mm (HBG)for revetment
419.00
456.00
588.00
156.00
154.00
144.00
164.00
136.00
118.00
138.00
188.00
Mazdoor skilled
Mazdoor unskilled
Machinery Rates
Dozer (D 80)
Motor grader
Hydralic excavator
Front end loader 1 cum capacity
45.00
95.00
588.00
944.00
984.00
780.00
656.00
504.00
308.00
340.00
103.00
620.00
994.00
1036.00
822.00
692.00
532.00
606.00
342.00
45000.00
41000.00
5000.00
44000.00
70.00
67.00
50.00
22.00
40.00
345.00
357.00
295.00
2575.60
3216.00
2848.50
1646.00
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
506.67
515.88
525.09
534.30
543.51
552.72
561.93
571.14
580.35
589.56
598.77
607.98
617.19
626.40
635.61
644.82
654.04
663.25
672.46
681.67
690.88
700.09
709.30
718.51
727.72
736.93
746.14
755.35
764.56
773.77
782.98
792.19
801.40
810.61
819.82
829.04
838.25
847.46
856.67
865.88
875.09
884.30
893.51
902.72
911.93
921.14
930.35
939.56
948.77
957.98
967.19
976.40
985.61
994.82
1004.04
506.67
515.88
525.09
534.30
543.51
552.72
561.93
571.14
580.35
589.56
598.77
607.98
617.19
626.40
635.61
644.82
654.04
663.25
672.46
681.67
690.88
700.09
709.30
718.51
727.72
736.93
746.14
755.35
764.56
773.77
782.98
792.19
801.40
810.61
819.82
829.04
838.25
847.46
856.67
865.88
875.09
884.30
893.51
902.72
911.93
921.14
930.35
939.56
948.77
957.98
967.19
976.40
985.61
994.82
1004.04
922.00
2678.30
1146.70
624.00
415.00
422.00
422.00
507.50
1646.00
357.00
1498.00
860.00
24171.00
2249.00
2567.00
1646.00
1283.00
1143.00
1850.00
1320.00
861.70
453.00
7.22
72.20
48.00
462.00
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
1013.25
1022.46
1031.67
1040.88
1050.09
1059.30
1068.51
1077.72
1086.93
1096.14
1105.35
1114.56
1123.77
1132.98
1142.19
1151.40
1160.61
1169.82
1179.04
1188.25
1197.46
1206.67
1215.88
1225.09
1234.30
1243.51
1252.72
1261.93
1271.14
1280.35
1289.56
1298.77
1307.98
1317.19
1326.40
1335.61
1344.82
1354.04
1363.25
1372.46
1381.67
1390.88
1400.09
1409.30
1418.51
1427.72
1436.93
1446.14
1455.35
1464.56
1473.77
1482.98
1492.19
1501.40
1510.61
1519.82
1013.25
1022.46
1031.67
1040.88
1050.09
1059.30
1068.51
1077.72
1086.93
1096.14
1105.35
1114.56
1123.77
1132.98
1142.19
1151.40
1160.61
1169.82
1179.04
1188.25
1197.46
1206.67
1215.88
1225.09
1234.30
1243.51
1252.72
1261.93
1271.14
1280.35
1289.56
1298.77
1307.98
1317.19
1326.40
1335.61
1344.82
1354.04
1363.25
1372.46
1381.67
1390.88
1400.09
1409.30
1418.51
1427.72
1436.93
1446.14
1455.35
1464.56
1473.77
1482.98
1492.19
1501.40
1510.61
1519.82
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
1529.04
1538.25
1547.46
1556.67
1565.88
1575.09
1584.30
1593.51
1602.72
1611.93
1621.14
1630.35
1639.56
1648.77
1657.98
1667.19
1676.40
1685.61
1694.82
1704.04
1713.25
1722.46
1731.67
1740.88
1750.09
1759.30
1768.51
1777.72
1786.93
1796.14
1805.35
1814.56
1823.77
1832.98
1842.19
1851.40
1860.61
1869.82
1879.04
1888.25
1897.46
1906.67
1915.88
1925.09
1934.30
1943.51
1952.72
1961.93
1971.14
1980.35
1989.56
1998.77
2007.98
2017.19
2026.40
2035.61
1529.04
1538.25
1547.46
1556.67
1565.88
1575.09
1584.30
1593.51
1602.72
1611.93
1621.14
1630.35
1639.56
1648.77
1657.98
1667.19
1676.40
1685.61
1694.82
1704.04
1713.25
1722.46
1731.67
1740.88
1750.09
1759.30
1768.51
1777.72
1786.93
1796.14
1805.35
1814.56
1823.77
1832.98
1842.19
1851.40
1860.61
1869.82
1879.04
1888.25
1897.46
1906.67
1915.88
1925.09
1934.30
1943.51
1952.72
1961.93
1971.14
1980.35
1989.56
1998.77
2007.98
2017.19
2026.40
2035.61
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
2044.82
2054.04
2063.25
2072.46
2081.67
2090.88
2100.09
2109.30
2118.51
2127.72
2136.93
2146.14
2155.35
2164.56
2173.77
2182.98
2192.19
2201.40
2210.61
2219.82
2229.04
2238.25
2247.46
2256.67
2265.88
2275.09
2284.30
2293.51
2302.72
2311.93
2321.14
2330.35
2339.56
2348.77
2357.98
2367.19
2376.40
2385.61
2394.82
2404.04
2413.25
2422.46
2431.67
2440.88
2450.09
2459.30
2468.51
2477.72
2486.93
2496.14
2505.35
2514.56
2523.77
2532.98
2542.19
2551.40
2044.82
2054.04
2063.25
2072.46
2081.67
2090.88
2100.09
2109.30
2118.51
2127.72
2136.93
2146.14
2155.35
2164.56
2173.77
2182.98
2192.19
2201.40
2210.61
2219.82
2229.04
2238.25
2247.46
2256.67
2265.88
2275.09
2284.30
2293.51
2302.72
2311.93
2321.14
2330.35
2339.56
2348.77
2357.98
2367.19
2376.40
2385.61
2394.82
2404.04
2413.25
2422.46
2431.67
2440.88
2450.09
2459.30
2468.51
2477.72
2486.93
2496.14
2505.35
2514.56
2523.77
2532.98
2542.19
2551.40
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
2560.61
2569.82
2579.04
2588.25
2597.46
2606.67
2615.88
2625.09
2634.30
2643.51
2652.72
2661.93
2671.14
2680.35
2689.56
2698.77
2707.98
2717.19
2726.40
2735.61
2744.82
2754.04
2763.25
2772.46
2781.67
2790.88
2800.09
2809.30
2818.51
2827.72
2836.93
2846.14
2855.35
2864.56
2873.77
2882.98
2892.19
2901.40
2910.61
2919.82
2929.04
2938.25
2947.46
2956.67
2965.88
2975.09
2984.30
2993.51
3002.72
3011.93
3021.14
3030.35
3039.56
3048.77
3057.98
3067.19
2560.61
2569.82
2579.04
2588.25
2597.46
2606.67
2615.88
2625.09
2634.30
2643.51
2652.72
2661.93
2671.14
2680.35
2689.56
2698.77
2707.98
2717.19
2726.40
2735.61
2744.82
2754.04
2763.25
2772.46
2781.67
2790.88
2800.09
2809.30
2818.51
2827.72
2836.93
2846.14
2855.35
2864.56
2873.77
2882.98
2892.19
2901.40
2910.61
2919.82
2929.04
2938.25
2947.46
2956.67
2965.88
2975.09
2984.30
2993.51
3002.72
3011.93
3021.14
3030.35
3039.56
3048.77
3057.98
3067.19
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
3076.40
3085.61
3094.82
3104.04
3113.25
3122.46
3131.67
3140.88
3150.09
3159.30
3168.51
3177.72
3186.93
3196.14
3205.35
3214.56
3223.77
3232.98
3242.19
3251.40
3260.61
3269.82
3279.04
3288.25
3297.46
3076.40
3085.61
3094.82
3104.04
3113.25
3122.46
3131.67
3140.88
3150.09
3159.30
3168.51
3177.72
3186.93
3196.14
3205.35
3214.56
3223.77
3232.98
3242.19
3251.40
3260.61
3269.82
3279.04
3288.25
3297.46
Name of Work: Periodical Maintenance to Dumpalapally road to Gandhi Statue in Dubbak town in Medak District.
STRIP PLAN
1.67
1.670
3.66 m
*
Proposed
To be Widen Portion
0/0
3.66m
7.00m
Medak
Siddipet
Hyderabad
Sl.
No.
1
Measurements
No. Length Breadth
3
4
5
Description of item
2
Depth
6
Quantity
7
1
1
2
1
5.00
9.90
1.40
2.00
0.95
1.60
13.30
31.68
or say
44.98
44.98
cum
27.00 1 cum
1214.00
2 Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone
aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost &
conveyance of all materials to site and labour charges, centering, machine mixing, laying,
Vibrating, curing etc., including all other incidental and operational charges of all T&P
etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100
(4th Revision) and as directed by the Engineer-in-Charge for foundations of HP culverts
for Body walls
under pipe
1
1
2
5.00
1.40
1
10.40
2.00
(10.40+11.60)/2
Encasing pipes
1 1
11.00
2.00
(1*1)
Deduct Pipe Portion 1 1
1.00
0.786
0.30
0.30
4.20
6.24
1.30
4+11.3)/2
10.85
Total
or say
28.60
-8.53
30.51
30.51
Cum
cum
3 Providing Vibrated Cement Concrete ( 1:3:6 ) using 40mm size HBG crushed stone
aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost,
conveyance of all materials to site and labour charges, centering, machine mixing, laying,
vibrating, curing etc., including all other incidental and operational charges of all T&P
etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2200
(4th Revision) and as directed by the Engineer-in-Charge for body walls of HP Culverts.
1
1
2
2
5.00
4.00
0.786
(1.20+0.45)/
2 0.83
0.45
(1*1)
1.00
16.50
2.00
1.62
0.45
(1.05+0.60)/2
0.83
-0.65
Total
17.47
or say
17.47
cum
5281.00 1 cum
92259.00
4 Providing, laying Reinforced cement concrete Hume pipes of 800mm/1000mm Dia., NP-3
class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour
charges for laying, jointing of 800mm/1000mm dia. R.C.C Hume pipes in position
including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H
Specification 2900, 2905 and 2906 (4th Revision) and IRC Special Publication No: 13 and
as directed by the Engineer-in-Charge for finished item of work.
800mm dia
2.50
12.50 RM
8281.00 1 R M
103513.00
A
Sl.
No.
1
Description of item
2
Measurements
No. Length Breadth
3
4
5
Depth
6
Quantity
Rate
Amount
23085.00
2 Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone
aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost &
conveyance of all materials to site and labour charges, centering, machine mixing, laying,
Vibrating, curing etc., including all other incidental and operational charges of all T&P
etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100
(4th Revision) and as directed by the Engineer-in-Charge for foundations of HP culverts
for 19 Nos CD works = 19
30.51
579.69
or say
580.00 cum
580.00 cum
4800.00 1 cum
###
3 Providing Vibrated Cement Concrete ( 1:3:6 ) using 40mm size HBG crushed stone
aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost,
conveyance of all materials to site and labour charges, centering, machine mixing, laying,
vibrating, curing etc., including all other incidental and operational charges of all T&P
etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2200
(4th Revision) and as directed by the Engineer-in-Charge for body walls of HP Culverts.
for 19 Nos CD works = 19
17.47
331.93
or say
or say
332.00 cum
332.00 cum
5281.00 1 cum
###
4 Providing, laying Reinforced cement concrete Hume pipes of 800mm/1000mm Dia., NP-3
class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour
charges for laying, jointing of 800mm/1000mm dia. R.C.C Hume pipes in position
including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H
Specification 2900, 2905 and 2906 (4th Revision) and IRC Special Publication No: 13 and
as directed by the Engineer-in-Charge for finished item of work.
800mm dia
for 19 Nos CD works = 19
12.50
237.50
or say
238.00 RM
238.00 RM
8281.00 1 R M
###
###
B
Sl.
No.
1
Description of item
2
Depth
6
Quantity
Rate
Amount
or say
70.89
70.90
cum
27.00 1 cum
1914.00
2 Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone
aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost &
conveyance of all materials to site and labour charges, centering, machine mixing, laying,
Vibrating, curing etc., including all other incidental and operational charges of all T&P
etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100
(4th Revision) and as directed by the Engineer-in-Charge for foundations of HP culverts
for Body walls
under pipe
1
1
2
7.00
1.40
1
10.40
3.30
(10.40+11.60)/2
Encasing pipes
1 1
11.00
3.30
(1*1)
Deduct Pipe Porti 1 2
1.00
0.786
0.30
0.30
5.88
10.30
1.30
47.19
(10.4+11.3)/2
10.85
-17.06
Total
46.31
or say
46.40
Cum
cum
3 Providing Vibrated Cement Concrete ( 1:3:6 ) using 40mm size HBG crushed stone
aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost,
conveyance of all materials to site and labour charges, centering, machine mixing, laying,
vibrating, curing etc., including all other incidental and operational charges of all T&P
etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2200
(4th Revision) and as directed by the Engineer-in-Charge for body walls of HP Culverts.
1
1
2
2
7.00
4.00
0.786
(1.20+0.45)/
2 0.83
0.45
(1*1)
1.00
23.10
2.00
1.62
0.45
(1.05+0.60)/2
0.83
-2.59
Total
22.13
or say
22.20
cum
4 Providing, laying Reinforced cement concrete Hume pipes of 800mm/1000mm Dia., NP-3
class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour
charges for laying, jointing of 800mm/1000mm dia. R.C.C Hume pipes in position
including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H
Specification 2900, 2905 and 2906 (4th Revision) and IRC Special Publication No: 13 and
as directed by the Engineer-in-Charge for finished item of work.
800mm dia
4635.00 1 R M 115875.00
2
12.50
25.00
or say
25.00 RM
###
C
Sl.
No.
1
Description of item
2
Measurements
No. Length Breadth
3
4
5
Depth
6
Quantity
Rate
Amount
5103.00
2 Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone
aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost &
conveyance of all materials to site and labour charges, centering, machine mixing, laying,
Vibrating, curing etc., including all other incidental and operational charges of all T&P
etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100
(4th Revision) and as directed by the Engineer-in-Charge for foundations of HP culverts
for 2 Nos CD works =
61.27
122.54
or say
or say
123.00 cum
123.00 cum
3 Providing Vibrated Cement Concrete ( 1:3:6 ) using 40mm size HBG crushed stone
aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost,
conveyance of all materials to site and labour charges, centering, machine mixing, laying,
vibrating, curing etc., including all other incidental and operational charges of all T&P
etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2200
(4th Revision) and as directed by the Engineer-in-Charge for body walls of HP Culverts.
for 2 Nos CD works =
25.74
51.48
or say
or say
51.50
51.50
cum
cum
4 Providing, laying Reinforced cement concrete Hume pipes of 800mm/1000mm Dia., NP-3
class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour
charges for laying, jointing of 800mm/1000mm dia. R.C.C Hume pipes in position
including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H
Specification 2900, 2905 and 2906 (4th Revision) and IRC Special Publication No: 13 and
as directed by the Engineer-in-Charge for finished item of work.
800mm dia
for 2 Nos CD works = 2
37.50
75.00
or say
75.00
75.00 RM
8281.00 1 R M 621075.00
###
Sl.
No.
1
Measurements
No. Length Breadth
3
4
5
Description of item
2
Depth
6
Quantity
Rate
Amount
or say
94.14
94.20
cum
27.00 1 cum
2543.00
2 Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone
aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost &
conveyance of all materials to site and labour charges, centering, machine mixing, laying,
Vibrating, curing etc., including all other incidental and operational charges of all T&P
etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100
(4th Revision) and as directed by the Engineer-in-Charge for foundations of HP culverts
for Body walls
under pipe
1
1
2
8.00
1.40
1
10.40
4.60
(10.40+11.60)/2
Encasing pipes
1 1
11.00
4.60
(1*1)
Deduct Pipe Porti 1 3
1.00
0.786
0.30
0.30
6.72
14.35
1.30
65.78
(10.4+11.3)/2
10.85
-25.58
Total
61.27
or say
61.30
Cum
cum
3 Providing Vibrated Cement Concrete ( 1:3:6 ) using 40mm size HBG crushed stone
aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost,
conveyance of all materials to site and labour charges, centering, machine mixing, laying,
vibrating, curing etc., including all other incidental and operational charges of all T&P
etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2200
(4th Revision) and as directed by the Engineer-in-Charge for body walls of HP Culverts.
(1.20+0.45)/2
for Body walls
for Parapet walls
1
1
2
2
8.00
0.83
6.00
0.786
0.45
(1*1)
1.00
25.90
1.95
2.43
0.45
(1.05+0.60)/2
0.83
-2.59
Total
25.74
or say
25.80
cum
4 Providing, laying Reinforced cement concrete Hume pipes of 800mm/1000mm Dia., NP-3
class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour
charges for laying, jointing of 800mm/1000mm dia. R.C.C Hume pipes in position
including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H
Specification 2900, 2905 and 2906 (4th Revision) and IRC Special Publication No: 13 and
as directed by the Engineer-in-Charge for finished item of work.
800mm dia
2.50
37.50 RM
8281.00 1 R M
310538.00
###
Sl.
No.
1
Description of item
2
Measurements
No. Length Breadth
3
4
5
Depth
6
Quantity
Rate
Amount
4482.00
2 Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone
aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost &
conveyance of all materials to site and labour charges, centering, machine mixing, laying,
Vibrating, curing etc., including all other incidental and operational charges of all T&P
etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100
(4th Revision) and as directed by the Engineer-in-Charge for foundations of HP culverts
for 2 Nos CD works =
46.90
93.80
or say
or say
94.00
94.00
cum
cum
3 Providing Vibrated Cement Concrete ( 1:3:6 ) using 40mm size HBG crushed stone
aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost,
conveyance of all materials to site and labour charges, centering, machine mixing, laying,
vibrating, curing etc., including all other incidental and operational charges of all T&P
etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2200
(4th Revision) and as directed by the Engineer-in-Charge for body walls of HP Culverts.
for 2 Nos CD works =
27.88
55.76
or say
or say
56.00
56.00
cum
cum
4 Providing, laying Reinforced cement concrete Hume pipes of 800mm/1000mm Dia., NP-3
class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour
charges for laying, jointing of 800mm/1000mm dia. R.C.C Hume pipes in position
including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H
Specification 2900, 2905 and 2906 (4th Revision) and IRC Special Publication No: 13 and
as directed by the Engineer-in-Charge for finished item of work.
1000mm dia
for 2 Nos CD works = 2
25.00
50.00
or say
50.00 RM
50.00 RM
7203.00 1 R M 360150.00
###
Measurements
No. Length Breadth
3
4
5
Description of item
2
Depth
6
Quantity
Rate
Amount
or say
156.69
156.70 cum
27.00 1 cum
4231.00
2 Providing Vibrated Cement Concrete (1:3:6) mix using 40mm size HBG crushed stone
aggregate and fine aggregate conforming to table 1000-2 of MoRT&H including cost &
conveyance of all materials to site and labour charges, centering, machine mixing, laying,
Vibrating, curing etc., including all other incidental and operational charges of all T&P
etc., complete for finished item of work as per MoRT&H specification 1500,1700, 2100
(4th Revision) and as directed by the Engineer-in-Charge for foundations of HP culverts
for Body walls
under pipe
1
1
2
10.00
1.40
0.30
8.40
1
10.40
7.30
0.30
22.78
(10.40+11.60)/2
Encasing pipes
1 1
11.00
7.30
1.50
120.45
(1.2*1.2) (10.4+11.3)/2
Deduct Pipe Porti 1 4
0.786
1.44
10.85
-49.12
Total
102.51 Cum
or say
102.50 cum
3 Vibrated cement concrete M 15 Grade Concrete using 40mm , 20mm and 10mm size
HBG crushed stone aggregate (Coarse aggregate conforming to table 1000-1 and fine
aggregate conforming to table 1000-2) including cost, conveyance of all materials to
site and all labour charges for machine mixing, laying in position,Compacting, Vibrating
and curing including all other incidental and all other operational charges of T&P required
etc., complete as per MoRT&H Specification 1500,1700, 2200 (4th Revision) for Sub
structure .
1
1
2
2
10.00
8.00
0.786
(1.20+0.45)/
2 0.83
35.48
2.15
3.24
0.45
0.45
(1.2*1.2) (1.05+0.60)/2
1.44
0.83
-7.47
Total
31.25
or say
31.30
cum
4 Providing, laying Reinforced cement concrete Hume pipes of 800mm/1000mm Dia., NP-3
class for pipe culverts including cost and conveyance of Pipes etc., complete and Labour
charges for laying, jointing of 800mm/1000mm dia. R.C.C Hume pipes in position
including lifting, aligning, lowering and hoisting etc., as per drawing and as per MoRT&H
Specification 2900, 2905 and 2906 (4th Revision) and IRC Special Publication No: 13 and
as directed by the Engineer-in-Charge for finished item of work.
1000mm dia
2.50
50.00 RM
### 1 R M
628250.00
###
Depth
6
95.89
lakhs
Quantity
Rate
Amount
###
###
###
Total Rs.
###
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
4
5
5
5
5
5
5
5
5
Cost of NP3 class Hume pipes of 800 mm dia. including cost and conveyance to site including
loading unloading transportation and taxes etc. complete .
1.00
RM
1.00
RM
1.00
RM
1.00
RM
1.00
1.00
RM
RM
1.00
RM
1.00
1.00
RM
RM
3051.00
1.00
3051.00
41500.00
45000.00
10.3544
36.24
4400.00
45000.00
95.00
0.2671
360.00
96.156
3903.93
=3051+36.24+3903.9336
5.00
19.00
km
km
6991.17
24.00
70.30
2.70
KM
5.00
1.00
70.30
51.30
7112.77
7112.77
Providing, laying Reinforced cement concrete Hume pipes of 800mm Dia., NP-3 class for pipe
culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying,
jointing of 800mm dia. R.C.C Hume pipes in position including lifting, aligning, lowering and
hoisting etc., as per drawing and as per MoRT&H Specification 2900, 2905 and 2906 (4 th Revision)
and IRC Special Publication No: 13 and as directed by the Engineer-in-Charge for finished item of
work.
0.18
0.50
no
no
188.00
193.40
1.00
1.00
33.84
96.70
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
5
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
6
4.00
no
Mazdoor
0.0
146.00
714.54
A=
TOTAL
12.50
RM
1.00
(B) Material
Cost of 800 mm Dia pipes
7112.77
TOTAL
(A + B)
1.00
B=
584.00
714.54
0.00
714.54
88909.63
88909.63
89624.17
5.00
89624.17
4481.21
10.00
94105.38
9410.54
12.50
RM
103515.92
8281.27
8281.00
Cost of NP3 class Hume pipes of 1000 mm dia. including cost and conveyance to site including
loading unloading transportation and taxes etc. complete .
1.00
RM
1.00
RM
1.00
RM
1.00
RM
1.00
RM
1.00
RM
1.00
RM
1.00
RM
1.00
RM
4758.00
1.00
41500.00
39900.00
20.2440
-32.39
4400.00
45000.00
115.00
0.4028
360.00
145.008
5887.32
5.00
19.00
km
km
4758.00
10612.93
24.00
111.40
5.10
KM
5.00
1.00
111.40
96.90
10821.23
6
6
Rate per RM
10821.23
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
7
Providing, laying Reinforced cement concrete Hume pipes of 1000mm Dia., NP-3 class for pipe
culverts including cost and conveyance of Pipes etc., complete and Labour charges for laying,
jointing of 1000mm dia. R.C.C Hume pipes in position including lifting, aligning, lowering and
hoisting etc., as per drawing and as per MoRT&H Specification 2900, 2905 and 2906 (4 th Revision)
and IRC Special Publication No: 13 and as directed by the Engineer-in-Charge for finished item of
work.
0.18
0.50
4.00
no
no
no
0.0
188.00
193.40
146.00
714.54
A=
TOTAL
12.50
RM
1.00
1.00
1.00
(B) Material
Cost of 1000 mm Dia pipes
10821.23
TOTAL
(A + B)
1.00
B=
33.84
96.70
584.00
714.54
0.00
714.54
135265.38
135265.38
135979.92
5.00
135979.92
6799.00
10.00
142778.92
14277.89
12.50
RM
157056.81
12564.54
12565.00
0
0
SP_35
0
0
0
0
0
0
0
0
0
0
0
0
0
SP_38
0
0
0
0
0
0
0
ok
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
SP_36
0
0
0
0
0
0
0
0
0
0
0
0
0
SP_39
ok
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0