Vous êtes sur la page 1sur 1

BORED PILING RECORD

Date

Coordinates

Pile no.
Reference

L
(m)

Diameter

mm

Pile drilling
length

mm

Elevation

Depth

Thickness

Recorder
Column
section

Soil strata description

Remarks

Drilling
machine
Drilling data
Weather
Start

Drilling time

End
Start
Bottom
cleaning time

End
Start

Concreting
time

Ground level

Pile top level

Pile tip level

Pile concrete
length

End

El

El

El

mm

Witnessed by Owner

Name:
Position:
Date:
Date: June 2009
Rev: 00

Approved by Consultant
Royal HaskoningDHV

Name:
Position:
Date:

Requested by Contractor

Name:
Position:
Date:
TEC-043-A3 Attached with TEC-00-043

Vous aimerez peut-être aussi