Vous êtes sur la page 1sur 4

DATE:

BY:

CONTROL NUMBER

EDSD VERIFICATION

REV
NO.

25-Jun-08

08-May-08

3/3/08

DATE

10-00578-0001

10-00578-0001

10-00578-0001

JO/EWO

ISSUED FOR PROPOSAL (M1)

ISSUED FOR PROPOSAL(D1)

ISSUED FOR CLIENT REVIEW AND COMMENT (03)

DESCRIPTION

KC

KC

D.Fulton
GL

GL

ENG'G CERT.

CONTENTS

SECTION

KHURSANIYAH

DESCRIPTION

MECHANICAL DATA SHEET

ACID GAS FLARE KNOCK OUT DRUM

K80-D-0181

Page No.

ACID GAS FLARE KNOCK OUT DRUM


K80-D-0181

DWG.TYPE

NON ASSOCIATED GAS PROCESSING FACILITIES

DAT

SAUDI ARABIA

JO/EWO-

3-4

DISCIPLINE
ENGINEER

DATE
PROJECT
ENGINEER

DATE

CERTIFIED

DATE
CONSTRUCTION
AGENCY

DATE

OPERATIONS

DATE

PLANT NO.

INDEX

DRAWING NO.

K80

RD-462668

10-00578-0001

THIS DRAWING AND THE INFORMATION CONTAINED WITHIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR PART SHALL BE OBTAINED FROM THE DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.

THIS INDICATES THAT REV NO. E


OF THIS DRAWING IS COVERED, FOR
ALL APPROVAL/CERTIFICATION
REQUIREMENT, BY DRAWING
COMPLETION CERTIFICATE
(DCC) NO.

EEVISION CERTIFICATION
PMT

OPRNS

Saudi Aramco 2616-ENG(03/99)

SAUDI ARABIAN OIL COMPANY

SHT. NO.

OF

REV.NO.

Saudi Aramco SDS-ME-9527 (05/2005)

(NO

SHEET UNITS
ENGLISH

METRIC

NOZZLE & MANWAY SCHEDULE

INSERT YOUR SKETCH HERE

MARK

SIZE

SERVICE

SIZE

SERVICE

ASME CLASS

N1

36"

INLET

ASME CLASS MARK


150

MH1

24"

MANWAY

150

N2

36"

VAP OUTLET

150

MH2

24"

MANWAY

150

N3

3"

LIQ OUTLET

150

N4 A/B

2"

LT

300

N5 A/B

2"

LT

300

N6

2"

VENT

150

N7

2"

PT

300

N8

2"

UTILITY CON.

150

N9

2"

STEAM OUT

150

ALL OTHER INFORMATION ON THIS SHEET TO BE DEDICATED TO YOUR EQUIPMENT.

VESSEL OUTLINE
OPERATING CONDITIONS
INTERNAL PRESSURE:
EXTERNAL PRESSURE:

MATERIALS OF CONSTRUCTION

NORMAL:

psi(g)

MAXIMUM:

21.0

psi(g)

NORMAL:

ATM.

psi

- BASE MATERIAL

MAXIMUM:

N/A

psi

- CLADDING OR OVERLAY

SERVICE

NON -CYCLIC, SOUR

TEMPERATURE:

Deg. F

367

Deg. F

MAXIMUM

SPECIFIC GRAVITY OF LIQUID:

DATA SHEET TO BE COMPLETED IN ACCORDANCE WITH SAES-D-001.

- TYPE

(2:1 S.E)

SA-106 Gr.B

PIPE:
ASME VIII DIV. 1 2007 ED (U STAMP)

INTERNAL ATTACHMENT CLIPS:

SA-516 Gr 70

EXTERNAL ATTACHMENT CLIPS:

SA-516 Gr 70

EXTERNAL PRESSURE:

NOTE 3

psi

420

Deg. F

INTERNALS:

43

Deg. F

SUPPORTS:

TEMPERATURE:
M.D.M.T
REINFORCEMENT

psi(g)

reinforcing pad

WIND SPEED

94 (3 SEC GUST)
ZONE:

STUD BOLTS:
NUTS:

SEE NOTE 18

SOIL COEFF:

(EXTERNAL)

RADIOGRAPHY

in

100% (FULL)

IMPACT TESTING (IT):

YES

NO

PWHT:

YES

NO

CODE
CODE

SERVICE

SA-516 Gr70 /SA-36

- LUGS:

SA-516 Gr70 /SA-36


N/A

- PACKING (BY OTHERS)

N/A

- TRAY (BY OTHERS)

N/A

STUD BOLTS:
NUTS:

NOTES:

31500
31500
101700
118600

DESIGN CERTIFICATION
lbs

REVIEW FOR KEY DRAWINGS

(DESIGN AGENCY)

lbs

ENGG./DATE

(INTERNALS)

(INTERNALS)

I. T. ENERGY AVE./MIN:

It is the responsbility of the contractor to ensure filling of this data sheet in compliance to the detailed company standard and
material specifications

OTHER

REQUIRED (SAUDI ARAMCO)

CERTIFIED BY/DATE CONST.AGENCY/DATE

OPERATION/DATE

BY/DATE

lbs
lbs

REV.NO.

DATE

8/5/08

25/06/08

SEE SHEET 4 OF 4

ORIGINATOR

REVISION DESCRIPTION

KC

ISSUED FOR PROPOSAL(D1)

KC

ISSUED FOR PROPOSAL (M1)


THIS DRAWING IS NOT TO BE USED FOR

JOB ORDER/EWO NO.


10-00578-0001

CONSTRUCTION UNTIL CERTIFIED AND DATED

SAUDI ARABIAN OIL COMPANY


MECHANICAL DATA SHEET
ACID GAS FLARE KNOCK OUT DRUM

DRAWING TYPE

DAT

K80-D-0181

SAUDI ARABIA

N/A

- SADDLES:

- DEMISTER (BY OTHERS)

0.236 (6mm) (UNCLAD) / NIL (CLAD)

N/A

SA-194 2HM
CS / SS 316L

OTHER (SPECIFY):

Av:

TEST:

IS COVERED, FOR ALL APPROVAL AND CERTIFICATION

REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATION NO:

N/A

SA-193 B7M

(EXTERNAL)

- SKIRT:
mph

EMPTY:

THIS REVISION NO

ESTIMATED VESSEL WEIGHTS:

SA-516 Gr 70 (HIC) OPERATING:


N/A

REVISION VALIDATION

YES
SEE NOTE 9

(SAPCS NO):

SA-350 LF2 / SA266 Gr4

50

I. T. TEMPERATURE

316L

SHIPPING:

INTERNAL PRESSURE:

CORROSION ALLOWANCE:

SA-516 Gr 70

- CLADDING OR OVERLAY

DESIGN CONDITIONS

N/A

SHOP PRIME & PAINT


(SAPCS NO):

REQUISITION NO:
VENDOR:

HC

FIELD PRIME & PAINT

HEADS:

FLANGES:

AND APPLICABLE ADDENDUM.

EARTHQUAKE:

N/A

SHELL AND HEAD

- BASE MATERIAL

1.008

VESSELS TO BE MANUFACTURED IN ACCORDANCE WITH 32-SAMSS-004

ASME DESIGN CODE & EDITION:

SA-516 Gr 70 (HIC)

- CLADDING OR OVERLAY

AMBIENT

INSULATION FIREPROOFING & PAINTING


INSULATION THICKNESS:
FIREPROOFING THICKNESS:

- BASE MATERIAL

SERVICE

NORMAL:

ASME NO:

SHELL:

BOOT:

OTHER

If other (Specify)

COMPONENT

PLANT NO

INDEX

DRAWING NUMBER

SHT. NO.

REV. NO.

K80

RD-462668

3 OF 4

NOTES:

SPECIFICATIONS AND STANDARDS

1 CONTRACTOR TO CONFIRM VESSEL SIZE, NOZZLE REQUIREMENTS AND CORRESPONDING


LIQUID LEVELS.

12-SAMSS-005

MARKING OF METAL PRODUCTS.

32-SAMSS-004

MANUFACTURING OF PRESSURE VESSELS

2 SUPPLIER TO CONFIRM THICKNESS AND WEIGHTS. SUPPLIER IS RESPONSIBLE FOR THE


MECHANICAL DESIGN.

32-SAMSS-031

MANUFACTURE OF CLAD VESSELS AND HEAT EXCHANGERS.

01-SAMSS-016

QUALIFICATION OF PIPELINE, IN-PLANT PIPING AND PRESSURE VESSEL STEELS

SAES-A-004

GENERAL REQUIREMENTS FOR PRESSURE TESTING

3 VESSEL SHALL BE DESIGNED FOR STEAM OUT CONDITIONS: 7.3 PSIA AT 300 F.
UNDER NORMAL / MAXIMUM OPERATING CONDITIONS, THE VESSEL IS
NOT SUBJECT TO EXTERNAL PRESSURE.

FOR RESISTANCE TO HYDROGEN-INDUCED CRACKING


SAES-A-007

HYDROSTATIC TESTING FLUIDS AND LAY-UP PROCEDURES

4 DELETED

SAES-A-206

POSITIVE MATERIAL IDENTIFICATION.

5 BOLT HOLES SHALL STRADDLE CENTRELINES UNLESS OTHERWISE INDICATED.

SAES-B-006

FIREPROOFING FOR PLANTS.

6 ALL REMOVABLE INTERNALS SHALL PASS THROUGH VESSEL MANWAYS.

SAES-A-301

MATERIALS RESISTANT TO SULFIDE STRESS CORROSION CRACKING

7 GASKETS SHALL BE 304 SS OR 316 SS SPIRAL WOUND, FLEXIBLE GRAPHITE FILLED WITH
CARBON STEEL OUTER CENTERING CONFIRMING TO TO ASME B16.20. THE MATERIALS SHALL
BE IN ACCORDING WITH 32-SAMSS-004.

SAES-H-001

COATING SELECTION & APPLICATION REQUIREMENTS FOR INDUSTRIAL


PLANTS & EQUIPMENT.

SAES-H-100

8 CONTRACTOR SHALL RECOMMEND CONTROL AND SAFETY INSTRUMENTATION DURING


DETAILED ENGINEERING TO ENSURE STABLE AND SAFE OPERATION .

COATING MATERIALS & APPLICATION REQUIREMENTS FOR INDUSTRIAL


FACILITIES.

SAES-H-101

APPROVED PROTECTIVE COATINGS SYSTEMS

9 PAINTING REQUIREMENTS: IN ACCORDANCE WITH SAES-H-001.

SAES-H-101V

APPROVED SAUDI ARAMCO DATA SHEETS - PAINTS AND COATINGS

10 SUPPLIER IS RESPONSIBLE FOR EXTERNAL& INTERNAL COATING APPLICATION WITH FULL TIME
INSPECTION PER ARAMCO SPECIFICATION SAES-H-100 AND 175-091900 INSPECTION
REQUIREMENTS. CLIENT SHALL BE GIVEN 2 WEEK NOTICE PRIOR TO ANY COATING.

SAES-W-010

WELDING REQUIREMENTS FOR PRESSURE VESSELS

SEAS-W-014

WELD OVERLAYS AND WELDING OF CLAD MATERIALS

11 THE FOLLOWING VESSEL ATTACHMENTS ARE REQUIRED AS A MINIMUM:


EXTERNAL ATTACHMENTS:
NAMEPLATE
EARTHING LUGS

STANDARD DRAWINGS

LIFTING LUGS

AA-036322

PIPE SUPPORTS / GUIDES, EXTERNAL STIFFENING RINGS

AB-036386

HARDNESS TESTING FOR WELDING PROCEDURE QUALIFICATIONS

GROUNDING LUG X 2

AE 036451

PREHEAT LEVELS FOR WELDING CARBON STEELS

. VACUUM RINGS

AA-036912

INSULATION DETAILS FOR HOT VESSELS

. INSULATION SUPPORTS

AE-036625

ENGINEERING DRAWING FORMS LAYOUT

AB-036367

JOINT PREPARATION AND WELDING DETAILS - ALLOY AND CLAD PRESSURE

INTERNAL ATTACHMENTS:
- VORTEX BREAKERS

ANCHOR BOLT DETAIL, INCHES AND METRIC SIZES

VESSELS AND HEAT EXCHANGERS

- INTERNAL LADDERS RUNGS AND GRAB HANDLES AT MANWAYS.


12 MINIMUM NOZZLE PROJECTIONS SHALL BE AS PER 32-SAMSS-004 PARA 8.1.2.

INSPECTION & TESTING REQUIREMENTS

13 DESIGN OF LIFTING ATTACHMENTS SHALL BE BY SUPPLIER. LIFTING ATTACHMENTS AND


VESSELS SHALL BE DESIGNED FOR THE ERECTION WEIGHT OF THE VESSEL TIMES A SHOCK
FACTOR OF 1.5.

175-060100

GASKETS

REQUISITION NO:

175-091900

COATING : SHOP APPLIED

VENDOR:

175-100100

FASTENERS

14 SADDLE THICKNESS AND SUPPORT ANCHOR BOLT REQUIREMENTS SHALL BE

175-321900

PRESSURE VESSELS

175-320300

POSITIVE MATERIAL IDENTIFICATION

15 ALL COMPONENTS SUBJECT TO COLD FORMING DURING MANUFACTURE SHALL BE HEAT


o
TREATED AT 620 C FOR 1 HOUR PER 25mm OF THICKNESS, 1 HOUR MINIMUM, AFTER FORMING
IF > 5% OF THE FIBRE STRAIN INDUCED.

175-022500
175-120100

FLANGES SPECTACLE PLATES SPACERS & BLINDS


INSPECTION REQUIREMENTS FOR STEEL STRUCTURES

175-022501

INSPECTION AND TESTING REQUIREMENTS FOR WN FLANGES, FORGED STEEL

16 VESSEL COMPONENTS SHALL BE FURNISHED IN ACCORDANCE WITH REFERENCED


SPECIFICATION AND STANDARDS.

175-000003

INSPECTION AND EXPLANATION FOR INSPECTION REQIREMENTS

175-010600

PIPE: CARBON STEEL SEAMLESS OR LONGITUDINAL STEAM

17 WIND AND SEISMIC LOADS ARE TO BE DETERMINED FROM ASCE 7-02.

175-010700

PIPE: BEVELED END SEAMLESS OR SUBMERGED ARC WELDED

18 SEISMIC DATA AS DETAILED IN BEDD, RE-459296.

175-010701

PIPE: BEVELED END SEAMLESS CARBON STEEL PIPE <6"

19 VESSEL NORMAL/MAXIMUM OPERATING PRESSURE ARE PRELIMINARY.

175-026100

PIPE FITTINGS

CONFIRMED BY SUPPLIER.

20 MATERIALS OF CONSTRUCTIONS SHALL BE BASED ON SOUR SERVICE.

REVISION VALIDATION
THIS REVISION NO

DESIGN CERTIFICATION

PROCESS INDUSTRY PRACTICES

24 DELETED
25 LEVEL INSTRUMENT NOZZLES SHALL NOT BE PLACED IN THE SIX O'CLOCK POSITION.

PROJECT SPECIFICATIONS AND STANDARDS

26 SADDLES TO BE DESIGNED TO TAKE FULL LOAD OF VESSEL AND BOOT AND FULL OF

RE-462624

MINIMUM NOZZLE LOADS

RE-459296

BASIC ENGINEERING DESIGN DATA (BEDD)

8.3 OF 32-SAMSS-031.
28 FLANGES LARGER THAN 24" SHALL BE IN ACCORDANCE WITH ASME B16.47 SERIES A
29 VESSEL SHALL BE INTERNALLY COATED IN ACCORDANCE WITH SAES-H-101
30 HEADS SHALL MEET 33-SAMMS-004 PARA. 7.10.4 REQUIREMENTS.
31 OPERATING LEVELS IN MAIN BODY OF VESSEL REFERENCED TO VESSEL BOTTOM
AND OPERATING LEVELS IN BOOT REFERENCED TO BOOT BOTTOM.

REVIEW FOR KEY DRAWINGS

(DESIGN AGENCY)
ENGG./DATE

CERTIFIED BY/DATE CONST.AGENCY/DATE

REV.NO.

DATE

8/5/08

25/06/08

VEFV1100

VESSEL / S&T HEAT EXCHANGER STANDARD DETAILS

VEFV1122

VESSEL; HORIZONTAL, INSULATION SUPPORTS

VESV1003

FABRICATION OF WELDED VESSELS AND TANKS TO BE LINED

OTHER

REQUIRED (SAUDI ARAMCO)

ORIGINATOR

OPERATION/DATE

BY/DATE

REVISION DESCRIPTION

KC

ISSUED FOR PROPOSAL(D1)

KC

ISSUED FOR PROPOSAL (M1)

JOB ORDER/EWO NO.

22 ONLY MAJOR NOZZLES ARE SHOWN IN THE DATASHEET.


23 INLET AND OUTLET NOZZLES ARE PRELIMINARY. SHALL BE CONFIRMED IN THE NEXT
ISSUE DOCUMENT.

27 INTERNAL ATTACHMENT MATERIALS ARE TO MEET THE REQUIREMENTS OF SECTION

IS COVERED, FOR ALL APPROVAL AND CERTIFICATION

REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATION NO:

21 BOOT MINIMUM THICKNESS EXCLUDES 3MM STAINLESS STEEL CLADDING

LIQUID AND ANY LOADS FROM EXTERNAL FORCES.

THIS DRAWING IS NOT TO BE USED FOR


CONSTRUCTION UNTIL CERTIFIED AND DATED

10-00578-0001

SAUDI ARABIAN OIL COMPANY


MECHANICAL DATA SHEET
ACID GAS FLARE KNOCK OUT DRUM

DRAWING TYPE

DAT

K80-D-0181

SAUDI ARABIA
PLANT NO

INDEX

DRAWING NUMBER

SHT. NO.

REV. NO.

K80

RD-462668

4 OF 4

Vous aimerez peut-être aussi