Vous êtes sur la page 1sur 1

LAYOUT OF FIRE FIGHTING SYSTEM OF GUL AHMED ENERGY LIMITED

FHC 4

FHC 5

OPCS 2 (with 4 buckets)


FHC 6

HFO
Tank 1

HFO
Tank 3

= Header
FHC 7

FHC 3

HFO
Tank 4

HFO
Tank 2

= Hydrant

HFO
LFO
Tank
TANK2

= Gate Valve
FHC 8

FHC 1

FHC 2

FHC 9

Foam Tank

= Mobile Trolley
= Fire Fighting Cabinet
= DCP Trolley
= Ball Valve
= Proportionate

WHC 2

WHC 1

Fire
Pump
Room

Switchyard

Ware House
WHC 3
WHC 5

WHC 10

WHC 4

T-2 & T-1

T-3

OPCS 1
(withke

WHC 9

Power House Building

WHC 6

Exhaust
Boiler

Boiler 2

WHC 8

WHC 7

Boiler 1

Day Tank Area

Vous aimerez peut-être aussi