Item

Ref

Code

Descriptions

Unit

The bills of quantities shall


be read in conjunction with
preambles and specifications
Retaining wall
Excavation works
A

F131

Excavation; cut and dispose; earth


m3

F121

Excavation; cut to fill ; earth


m3

C
D

F141

Excavation; foundation; earth

m3

P111.1 Drain excavation; in earth; depth not


exceedng 1.5m; commencing from finished
level; 300mm thick V-shape concrete drain
m

F311

Filling; general; excavated material


m2

F410.1 Filling ancillaries; geotextiles; 19-40mm


imported granite

m3

Concrete works
G

I111.1 Insitu concrete designed mix; grade C15;


blinding; 50mm thick

m2

Insitu concrete designed mix; grade C30;


bases; 50mm thick

m3

Insitu concrete designed mix; grade C30;


walls

m3

I142

I145

I411.1 Formwork; sides; bases; rough finish


m2

I414.1 Formwork; sides; walls; fair finish


m2

RETAINING WALL
BQ/1

BQ/1

Item
Ref

Code

Descriptions

Unit

The bills of quantities shall


be read in conjunction with
preambles and specifications
Concrete works (cont'd)
A

I652.1 Concrete ancillaries; inserts; other


inserts; 200mm dameter; cast iron pipe;
grouted into wall at 2.00 metres centre to
centre
nr

P250.1

I523

1525

Surface drain; toe drain; concrete V-shape


drain; 300mm x 300mm nominal size; 25mm
thick lining

Reinforcement; high tensile bars; nominal


diameter; 12mm

Reinforcement; high tensile bars; nominal


diameter; 20mm

RETAINING WALL
BQ/2

BQ/2

Item
Ref

Code

Descriptions
Retaining wall

COLLECTION
Page No:BQ/1
Page No:BQ/2

Unit

RETAINING WALL

BQ/3

RETAINING WALL
Qty

2045

651
159

85

651

192

289

145

153

89

Rate (RM)

Amount (RM)

765

To Collection RM

RETAINING WALL
Qty

44

85

18

Rate (RM)

Amount (RM)

To Collection RM

RETAINING WALL
Qty

Rate (RM)

Amount (RM)

To Summary RM