CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA "COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,

DEPARTAMENTO CUSCO"

HOJA DE METRADOS DE ESTRUCTURAS


OBRA

: CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO
: ESTRUCTURAS

ESTRUCTURAS

01.01

TRABAJOS PRELIMINARES

01.01.01

CARTEL DE OBRA 3.60 X 2.40 M

N PISO

DESCRIPCION

EJE

CANT. DE
ELEMENTOS

CARTEL DE OBRA

DIMENSIONES
Largo

Ancho

UNIDAD
Alto

1.00

N PISO

und

DESCRIPCION

EJE

DIMENCIONES

CANT. DE
ELEMENTOS

Largo

Ancho

1.00

40.00

20.00

AREA
Alto

m2

DESCRIPCION

EJE

800.00

DIMENCIONES

CANT. DE
ELEMENTOS

Largo

Ancho

1.00

40.00

20.00

GLOBAL
Alto

PARCIAL

GLB

01.02

MOVIMIENTO DE TIERRAS

01.02.01

CORTE, NIVELACION MANUAL HASTA ALCANZAR TERRENO COMPETENTE


DESCRIPCION

EJE

DIMENCIONES

800.00

VOLUMEN

CANT. DE
ELEMENTOS

Largo

Ancho

Alto

PARCIAL

1.00

34.10

22.97

0.20

156.66

(Datos segn informe de inspeccion)

TOTAL

800.00

Total Limpieza del Terreno manual

m3

Total Corte, Nivelacion y Mejoramiento de terreno con Equipo


01.02.02

TOTAL

REPLANTEO DURANTE EL PROCESO

REPLANTEO DURANTE EL PROCESO

N PISO

PARCIAL
800.00

Total Trazo y replanteo de ejes y niveles

N PISO

1.00

TRAZO, NIVELES Y REPLANTEO PRELIMINAR

TRAZO, NIVELES Y REPLANTEO PRELIMINAR

01.01.03

TOTAL

1.00

Total Cartel de obra


01.01.02

PARCIAL

TOTAL

156.66

EXCAVACION MANUAL PARA ESTRUCTURAS


EXCAVACION MANUAL P/ZANJAS P/CIMIENTO CORRIDO
DIMENCIONES

VOLUMEN

CANT. DE
ELEMENTOS

Largo

Ancho

Alto

PARCIAL

ENTRE C-D

1.00

2.1

0.5

0.55

0.58

ENTRE D-E

1.00

2.2

0.5

0.55

0.61

ENTRE E-F

1.00

2.5

0.5

0.55

0.69

ENTRE D-E

1.00

0.82

0.5

0.55

0.23

ENTRE E-F

1.00

3.1

0.5

0.55

0.85

DESCRIPCION

EJE

VERTICAL

1-1

TOTAL

1-1 A 2-2

2-2
ENTRE C-D

1.00

2.2

0.5

0.55

0.61

ENTRE D-E

1.00

2.51

0.5

0.55

0.69

ENTRE E-F

1.00

2.6

0.5

0.55

0.72

ENTRE D-E

1.00

2.05

0.5

0.55

0.56

ENTRE E-F

1.00

2.50

0.5

0.55

0.69

1.00

0.53

0.4

0.25

0.05

1.00

0.48

0.4

0.25

0.05

1.00

2.20

0.5

0.55

0.61

1.00

2.30

0.5

0.55

0.63

1.00

2.50

0.5

0.55

0.69

1.00

0.85

0.4

0.25

0.09

ENTRE C-D

1.00

2.10

0.5

0.55

0.58

ENTRE D-E

1.00

2.20

0.5

0.55

0.61

ENTRE C-D

1.00

2.10

0.5

0.55

0.58

ENTRE D-E

1.00

2.30

0.5

0.55

0.63

1.00

2.25

0.5

0.55

0.62

1.00

2.60

0.5

0.55

0.72

1.00

0.70

0.5

0.55

0.19

1.00

0.80

0.5

0.55

0.22

1.00

2.10

0.5

0.55

0.58

1.00

2.20

0.5

0.55

0.61

1.00

2.50

0.5

0.55

0.69

1-2

1.00

3.05

0.5

0.55

0.84

2-3

1.00

3.05

0.5

0.55

0.84

3-4

1.00

3.40

0.5

0.55

0.94

4-5

1.00

1.95

0.5

0.55

0.54

5-6

1.00

1.95

0.5

0.55

0.54

6-7

1.00

1.95

0.5

0.55

0.54

2-2 A 3-3

3-3
ENTRE C-D

3-4
ENTRE D - E
4-4

8-8

9-9
ENTRE D-E'
10-10
ENTRE C-D
10-11
ENTRE C-D
11-11
ENTRE C-D

HORIZONTAL

C-C

MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO

Metrado Estructuras
1

CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA "COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO"

HOJA DE METRADOS DE ESTRUCTURAS


OBRA

: CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO
: ESTRUCTURAS

7-8

1.00

1.95

0.5

0.55

0.54

8-9

1.00

3.50

0.5

0.55

0.96

10--11

1.00

2.05

0.5

0.55

0.56

1.00

3.10

0.5

0.55

0.85

ENTRE 1-2

1.00

2.95

0.5

0.55

0.81

ENTRE 2-3

1.00

3.05

0.5

0.55

0.84

ENTRE 8-10

1.00

3.40

0.5

0.55

0.94

ENTRE 10-11

1.00

1.80

0.5

0.55

0.50

ENTRE 1-2

1.00

3.55

0.5

0.55

0.98

ENTRE 2-3

1.00

1.35

0.5

0.55

0.37

ENTRE 3-4

1.00

1.68

0.5

0.55

0.46

1.37

0.5

0.55

0.38

C-C A D-D
10-11
D-D

D-E

E'-E'
ENTRE 1-2

1.00

2.95

0.50

0.55

0.81

ENTRE 2-3

1.00

2.95

0.5

0.55

0.81

ENTRE 3-4

1.00

3.20

0.5

0.55

0.88

ENTRE 4-5

1.00

1.85

0.5

0.55

0.51

ENTRE 5-6

1.00

1.95

0.5

0.55

0.54

ENTRE 6-7

1.00

1.95

0.5

0.55

0.54

ENTRE 7-8

1.00

1.95

0.5

0.55

0.54

ENTRE 8-9

1.00

0.45

0.5

0.55

0.12

ENTRE 9-10

1.00

2.05

0.5

0.55

0.56

1.00

1.95

0.5

0.55

0.54

1.00

1.85

0.5

0.55

0.51

1.00

0.83

0.5

0.55

0.23

1.00

1.15

0.5

0.55

0.32

1.00

1.85

0.5

0.55

0.51

1.00

0.88

0.5

0.55

0.24

ENTRE 1-2

1.00

3.05

0.5

0.55

0.84

ENTRE 2-3

1.00

3.05

0.5

0.55

0.84

ENTRE 9-10

1.00

2.05

0.5

0.55

0.56

ENTRE 10-11

1.00

2.05

0.5

0.55

0.56

E-F
ENTRE 1-2
ENTRE 2-3

F-F

Total Excavacin cimiento corrido

m3

37.18

EXCAVACION MANUAL P/ZAPATAS


DIMENCIONES

VOLUMEN

CANT. DE
ELEMENTOS

Largo

Ancho

Alto

PARCIAL

Z-1

2.00

1.2

1.2

1.50

4.32

Z-2

2.00

1.50

3.00

Z-2

4.00

1.50

6.00

Z-1

1.00

1.2

1.2

1.50

2.16

Z-2

1.00

1.50

1.50

Z-3

1.00

0.75

0.75

0.85

0.48

Z-1

2.00

1.2

1.2

1.50

4.32

Z-2

1.00

1.50

1.50

Z-3

1.00

0.75

0.75

0.85

0.48

Z-2

2.00

1.50

3.00

Z-3

1.00

0.75

0.75

0.85

0.48

Z-2

2.00

1.50

3.00

Z-3

0.75

0.75

0.75

0.85

0.36

Z-2

2.00

1.50

3.00

Z-3

1.00

0.75

0.75

0.85

0.48

Z-1

1.00

1.2

1.2

1.50

2.16

Z-2

2.00

1.50

3.00

Z-3

1.00

0.75

0.75

0.85

0.48

Z-2

2.00

1.50

3.00

Z-2

4.00

1.50

6.00

Z-1

2.00

1.2

1.2

1.50

4.32

Z-2

2.00

1.50

3.00

DESCRIPCION

EJE

TOTAL

ZAPATAS
EJE 1-1

EJE 2-2
EJE 3-3

EJE 3-4
EJE 4-4

EJE 5-5

EJE 6-6

EJE 7-7

EJE 8-8

EJE 9-9
EJE 10-10
EJE 11-11

Total EXCAVACION

m3

56.03

EXCAVACION MANUAL P/VEREDAS


DESCRIPCION

EJE

CANT. DE
ELEMENTOS

MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO

DIMENCIONES

VOLUMEN

Metrado Estructuras
2

CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA "COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO"

HOJA DE METRADOS DE ESTRUCTURAS


OBRA

: CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO
: ESTRUCTURAS
DESCRIPCION

EJE

CANT. DE
ELEMENTOS

Largo

Ancho

Alto

PARCIAL

TOTAL

VEREDAS
PERIMETRO

INTERIOR

01.02.03

96.85

AREA

0.015

1.45

1.00

8.63

0.64

0.20

1.10

1.00

10.16

0.64

0.20

1.30

1.00

AREA

24.677

0.20

4.94

Total EXCAVACION

m3

8.79

TOTAL EXCAVACION MANUAL PARA ESTRUCTURAS

m3

102.01

REFINE Y COMPACTACION DE NIVELES DE FONDO


DIMENCIONES

AREA

CANT. DE
ELEMENTOS

Largo

Ancho

ENTRE C-D

1.00

2.1

0.5

1.05

ENTRE D-E

1.00

2.2

0.5

1.10

ENTRE E-F

1.00

2.5

0.5

1.25

ENTRE D-E

1.00

0.82

0.5

0.41

ENTRE E-F

1.00

3.1

0.5

1.55

DESCRIPCION

EJE

Alto

PARCIAL

TOTAL

CIMIENTO CORRIDO
VERTICAL

1-1

1-1 A 2-2

2-2
ENTRE C-D

1.00

2.2

0.5

1.10

ENTRE D-E

1.00

2.51

0.5

1.26

ENTRE E-F

1.00

2.6

0.5

1.30

ENTRE D-E

1.00

2.05

0.5

1.03

ENTRE E-F

1.00

2.50

0.5

1.25

1.00

0.53

0.4

0.21

1.00

0.48

0.4

0.19

1.00

2.20

0.5

1.10

1.00

2.30

0.5

1.15

1.00

2.50

0.5

1.25

1.00

0.85

0.4

0.34

ENTRE C-D

1.00

2.10

0.5

1.05

ENTRE D-E

1.00

2.20

0.5

1.10

ENTRE C-D

1.00

2.10

0.5

1.05

ENTRE D-E

1.00

2.30

0.5

1.15

1.00

2.25

0.5

1.13

1.00

2.60

0.5

1.30

1.00

0.70

0.5

0.35

1.00

0.80

0.5

0.40

1.00

2.10

0.5

1.05

1.00

2.20

0.5

1.10

1.00

2.50

0.5

1.25

1-2

1.00

3.05

0.5

1.53

2-3

1.00

3.05

0.5

1.53

3-4

1.00

3.40

0.5

1.70

4-5

1.00

1.95

0.5

0.98

5-6

1.00

1.95

0.5

0.98

6-7

1.00

1.95

0.5

0.98

7-8

1.00

1.95

0.5

0.98

8-9

1.00

3.50

0.5

1.75

10--11

1.00

2.05

0.5

1.03

1.00

3.10

0.5

1.55

ENTRE 1-2

1.00

2.95

0.5

1.48

ENTRE 2-3

1.00

3.05

0.5

1.53

ENTRE 8-10

1.00

3.40

0.5

1.70

ENTRE 10-11

1.00

1.80

0.5

0.90

ENTRE 1-2

1.00

3.55

0.5

1.78

ENTRE 2-3

1.00

1.35

0.5

0.68

ENTRE 3-4

1.00

1.68

0.5

0.84

1.37

0.5

0.69

2-2 A 3-3

3-3
ENTRE C-D

3-4
ENTRE D - E
4-4

8-8

9-9
ENTRE D-E'
10-10
ENTRE C-D
10-11
ENTRE C-D
11-11
ENTRE C-D

HORIZONTAL

C-C

C-C A D-D
10-11
D-D

D-E

E'-E'

MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO

Metrado Estructuras
3

CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA "COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO"

HOJA DE METRADOS DE ESTRUCTURAS


OBRA

: CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO
: ESTRUCTURAS

ENTRE 1-2

1.00

2.95

0.50

1.48

ENTRE 2-3

1.00

2.95

0.5

1.48

ENTRE 3-4

1.00

3.20

0.5

1.60

ENTRE 4-5

1.00

1.85

0.5

0.93

ENTRE 5-6

1.00

1.95

0.5

0.98

ENTRE 6-7

1.00

1.95

0.5

0.98

ENTRE 7-8

1.00

1.95

0.5

0.98

ENTRE 8-9

1.00

0.45

0.5

0.23

ENTRE 9-10

1.00

2.05

0.5

1.03

1.00

1.95

0.5

0.98

1.00

1.85

0.5

0.93

1.00

0.83

0.5

0.42

1.00

1.15

0.5

0.58

1.00

1.85

0.5

0.93

1.00

0.88

0.5

0.44

ENTRE 1-2

1.00

3.05

0.5

1.53

ENTRE 2-3

1.00

3.05

0.5

1.53

ENTRE 9-10

1.00

2.05

0.5

1.03

ENTRE 10-11

1.00

2.05

0.5

1.03

Z-1

2.00

1.2

1.2

2.88

Z-2

2.00

2.00

Z-2

4.00

4.00

Z-1

1.00

1.2

1.2

1.44

Z-2

1.00

1.00

Z-3

1.00

0.75

0.75

0.56

Z-1

2.00

1.2

1.2

2.88

Z-2

1.00

1.00

Z-3

1.00

0.75

0.75

0.56

Z-2

2.00

2.00

Z-3

1.00

0.75

0.75

0.56

Z-2

2.00

2.00

Z-3

0.75

0.75

0.75

0.42

Z-2

2.00

2.00

Z-3

1.00

0.75

0.75

0.56

Z-1

1.00

1.2

1.2

1.44

Z-2

2.00

2.00

Z-3

1.00

0.75

0.75

0.56

Z-2

2.00

2.00

Z-2

4.00

4.00

Z-1

2.00

1.2

1.2

2.88

Z-2

2.00

2.00

E-F
ENTRE 1-2
ENTRE 2-3

F-F

ZAPATAS
EJE 1-1

EJE 2-2
EJE 3-3

EJE 3-4
EJE 4-4

EJE 5-5

EJE 6-6

EJE 7-7

EJE 8-8

EJE 9-9
EJE 10-10
EJE 11-11

PISOS
DORM. DAMAS

AREA

16.99

16.99

DORM. TAMBERO

AREA

10.12

10.12

S.H. DISC.

AREA

4.34

4.34

S.H. DAMAS

AREA

5.27

5.27

S.H. VARONES

AREA

5.65

5.65

HALL

AREA

13.23

13.23

DORM. GUARDIAN

AREA

5.29

5.29

DORM. VARONES

AREA

15.67

15.67

DEPOS. GENERAL

AREA

21.88

21.88

SALON DE USOS MULTIPLES

AREA

76.69

76.69

CUARTO DE TABLEROS

AREA

3.94

3.94

HALL

AREA

4.39

4.39

COCINA

AREA

16.28

16.28

PASADIZO

AREA

4.01

4.01

OFICINA 2

AREA

19.79

19.79

OFICINA 1

AREA

20.97

20.97

TOTAL REFINE Y COMPACTACION DE NIVELES DE FONDO

01.02.04
N PISO

m2

351.27

RELLENO COMPACTADO CON MATERIAL PROPIO Y EQUIPO MENOR


DESCRIPCION

EJE

ZAPATAS

EJE 1-1

DIMENCIONES

VOLUMEN

CANT. DE
ELEMENTOS

Largo

Ancho

Alto

PARCIAL

AREA

0.6094

1.1

1.34068

Z-2

MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO

TOTAL

Metrado Estructuras
4

CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA "COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO"

HOJA DE METRADOS DE ESTRUCTURAS


OBRA

: CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO
: ESTRUCTURAS

AREA

0.1406

1.1

0.30932

AREA

0.2256

1.1

0.49632

AREA

0.2256

1.1

0.49632

AREA

0.57

1.1

1.254

AREA

0.3746

1.1

0.41206

AREA

0.1408

1.1

0.30976

Z-2

AREA

0.1405

1.1

0.6182

Z-2

AREA

0.1405

1.1

0.6182

Z-2

AREA

0.1406

1.1

0.30932

AREA

0.3752

1.1

0.41272

AREA

0.3746

1.1

0.41206

AREA

0.1408

1.1

0.30976

AREA

0.1405

1.1

0.3091

AREA

0.375

1.1

0.4125

Z-2

AREA

0.2256

1.1

0.99264

Z-2

AREA

0.6095

1.1

0.67045

AREA

0.1405

1.1

0.15455

AREA

0.3746

1.1

0.41206

AREA

0.1408

1.1

0.15488

AREA

0.1408

1.1

0.15488

AREA

0.5325

1.1

0.58575

AREA

0.57

1.1

0.627

AREA

0.2256

1.1

0.99264

AREA

0.375

1.1

2.475

AREA

0.375

1.1

0.4125

AREA

0.375

1.1

0.825

AREA

0.1406

1.1

0.30932

AREA

0.1406

1.1

0.30932

AREA

0.57

1.1

0.627

AREA

0.2256

1.1

0.24816

AREA

0.2256

1.1

0.24816

AREA

0.375

1.1

0.4125

AREA

0.1406

1.1

0.30932

AREA

0.6094

1.1

0.67034

AREA

0.1406

1.1

0.15466

AREA

0.375

1.1

0.4125

AREA

0.1406

1.1

0.15466

AREA

0.1406

1.1

0.15466

AREA

0.375

1.1

1.2375

AREA

0.375

1.1

1.2375

AREA

0.6094

1.1

1.34068

AREA

0.1406

1.1

0.30932

AREA

0.2256

1.1

0.49632

AREA

0.2256

1.1

0.49632

AREA

0.57

1.1

1.254

AREA

0.5134

0.5

1.5402

Z-1

EJE 2-2
Z-2

EJE 3-3
Z-2
Z-2

EJE 4-4
Z-2

Z-1
Z-1
EJE 5-5

Z-2
EJE 8-8
Z-2

Z-1

EJE 9-9
Z-2
Z-2
EJE 10-10
Z-2

Z-2
EJE 11-11
Z-2

VEREDA FRONTAL
Z-3

TOTAL DE RELLENO COMPACTADO CON MATERIAL PROPIO Y EQUIPO MENOR

01.02.05

m2

28.40

BASE GRANULAR COMPACTADO DESDE NIVELES DE FONDO HASTA FALSO PISO


DIMENCIONES

AREA

CANT. DE
ELEMENTOS

Largo

Ancho

DORM. DAMAS

1.00

AREA

16.99

16.99

DORM. TAMBERO

1.00

AREA

10.12

10.12

S.H. DISC.

1.00

AREA

4.34

4.34

S.H. DAMAS

1.00

AREA

5.27

5.27

S.H. VARONES

1.00

AREA

5.65

5.65

HALL

1.00

AREA

13.23

13.23

DORM. GUARDIAN

1.00

AREA

5.29

5.29

DORM. VARONES

1.00

AREA

15.67

15.67

DEPOS. GENERAL

1.00

AREA

21.88

21.88

SALON DE USOS MULTIPLES

1.00

AREA

76.69

76.69

CUARTO DE TABLEROS

1.00

AREA

3.94

3.94

HALL

1.00

AREA

4.39

4.39

COCINA

1.00

AREA

16.28

16.28

PASADIZO

1.00

AREA

4.01

4.01

OFICINA 2

1.00

AREA

19.79

19.79

OFICINA 1

1.00

AREA

20.97

20.97

VEREDA EXTERIOR

1.00

AREA

148.75

148.75

N PISO

DESCRIPCION

EJE

Alto

PARCIAL

TOTAL

MODULO

MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO

Metrado Estructuras
5

CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA "COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO"

HOJA DE METRADOS DE ESTRUCTURAS


OBRA

: CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO
: ESTRUCTURAS

Total Base Granular Compactado desde Niveles de Fondo hasta falso piso
01.02.06

m2

ELIMINACION DE MATERIAL EXCEDENTE

N PISO

DESCRIPCION

VOLUMEN

TOTAL EXCAVACION MANUAL PARA


ESTRUCTURAS

102.01

RELLENO DE ZAPATAS

28.40

FACTOR DE ESPON

DIMENCIONES
Largo

Ancho

VOLUMEN
Alto

1.25

01.03

CONCRETO SIMPLE

01.03.01

SOLADOS

01.03.01.01

SOLADOS C/MEZCLA 1:8 C:H E=4"


DESCRIPCION

(-)

EJE

CANTIDAD

DIMENCIONES
Largo

ANCHO

PARCIAL

8.00

1.20

1.20

11.52

Z-2

26.00

1.00

1.00

26.00

Z-3

6.00

0.75

0.75

3.38

Z-4

1.00

2.20

0.80

1.76
m2

CIMIENTOS CORRIDOS

01.03.02.01

CONCRETO P/CIMIENTO CORRIDO 1:8 C:H + 30% P.G. MAX 6"


DESCRIPCION

EJE

92.01

AREA
Alto

Z-1

01.03.02

TOTAL

35.50
m3

Total Solado Zapatas

N PISO

PARCIAL

127.51

1.25

Total eliminacion de material excedente

N PISO

393.25

DIMENCIONES

TOTAL

42.66

VOLUMEN

CANT. DE
ELEMENTOS

Largo

Ancho

Alto

PARCIAL

1.00

AREA

5.35

0.50

2.68

1.00

AREA

1.78

0.40

0.71

1.00

AREA

1.78

0.40

0.71

1.00

AREA

2.17

0.50

1.09

1.00

AREA

1.78

0.40

0.71

1.00

AREA

2.48

0.50

1.24

1.00

AREA

0.33

0.50

0.17

1.00

AREA

1.78

0.40

0.71

1.00

AREA

5.35

0.40

2.14

1.00

AREA

1.78

0.40

0.71

1.00

AREA

1.70

0.50

0.85

1.00

AREA

1.78

0.50

0.89

1.00

AREA

1.77

0.40

0.71

1.00

AREA

3.70

0.40

1.48

1.00

AREA

0.58

0.50

0.29

1.00

AREA

0.21

0.40

0.08

1.00

AREA

0.35

0.40

0.14

1.00

AREA

0.19

0.40

0.08

1.00

AREA

5.35

0.40

2.14

1.00

AREA

1.95

0.40

0.78

1.00

AREA

0.84

0.50

0.42

1.00

AREA

0.68

0.50

0.34

1.00

AREA

0.34

0.40

0.14

1.00

AREA

1.95

0.40

0.78

1.00

AREA

3.55

0.40

1.42

1.00

AREA

5.65

0.40

2.26

1.00

AREA

5.65

0.40

2.26

1.00

AREA

3.55

0.40

1.42

1.00

AREA

3.53

0.40

1.41

1.00

AREA

0.48

0.50

0.24

1.00

AREA

1.95

0.50

0.98

1.00

AREA

3.52

0.40

1.41

1.00

AREA

1.13

0.40

0.45

1.00

AREA

5.35

0.40

2.14

TOTAL

1-1
1-2

2-2
2-3

3-3
3-4

4-4
4-8

8-8
8-11

11-11

TOTAL CONCRETO P/CIMIENTO CORRIDO 1:8 C:H + 30% P.G. MAX 6"
01.03.02.02
N PISOS

m3

33.95

ACERO CORRUGADO fy=4,200 kg/cm2 GRADO 60 PARA DOWELLS


DESCRIPCION

EJE

CANTIDAD
ELEMENTO

N DE PIEZAS

LONGITUD
PIEZA

Kg/ml

PESO

3/8"

1.00

12

0.3

0.560

1.98

3/8"

1.00

12

0.3

0.560

1.98

1-1

MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO

Metrado Estructuras
6

CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA "COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO"

HOJA DE METRADOS DE ESTRUCTURAS


OBRA

: CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO
: ESTRUCTURAS

3/8"

1.00

12

0.30

0.560

1.98

3/8"

1.00

0.30

0.560

0.20

3/8"

1.00

0.30

0.560

0.20

3/8"

1.00

0.3

0.560

0.20

3/8"

1.00

15

0.30

0.560

2.59

3/8"

1.00

0.3

0.560

0.74

3/8"

1.00

0.3

0.560

0.84

3/8"

1.00

0.30

0.560

0.97

3/8"

1.00

0.3

0.560

1.48

3/8"

1.00

14

0.3

0.560

2.39

3/8"

1.00

0.3

0.560

1.41

3/8"

1.00

0.3

0.560

0.72

3/8"

1.00

0.3

0.560

0.57

3/8"

1.00

12

0.30

0.560

1.98

3/8"

1.00

10

0.30

0.560

1.71

3/8"

1.00

15

0.30

0.560

2.55

3/8"

1.00

0.30

0.560

0.32

3/8"

1.00

0.30

0.560

0.50

3/8"

1.00

0.30

0.560

1.28

3/8"

1.00

0.30

0.560

0.85

3/8"

1.00

15

0.30

0.560

2.55

3/8"

1.00

0.30

0.560

0.71

3/8"

1.00

0.30

0.560

0.37

3/8"

1.00

0.30

0.560

1.14

3/8"

1.00

0.30

0.560

1.58

3/8"

1.00

0.30

0.560

0.64

3/8"

1.00

0.30

0.560

0.37

3/8"

1.00

0.30

0.560

0.73

3/8"

1.00

0.30

0.560

1.41

3/8"

1.00

12

0.30

0.560

1.98

3/8"

1.00

0.30

0.560

1.21

3/8"

1.00

0.30

0.560

0.46

3/8"

1.00

17

0.30

0.560

2.79

3/8"

1.00

0.30

0.560

0.96

3/8"

1.00

0.30

0.560

0.67

3/8"

1.00

0.30

0.560

0.84

3/8"

1.00

12

0.30

0.560

1.98

3/8"

1.00

0.30

0.560

1.24

3/8"

1.00

11

0.30

0.560

1.81

3/8"

1.00

11

0.30

0.560

1.81

3/8"

1.00

11

0.30

0.560

1.81

3/8"

1.00

11

0.30

0.560

1.81

3/8"

1.00

11

0.30

0.560

1.81

3/8"

1.00

11

0.30

0.560

1.81

3/8"

1.00

0.30

0.560

0.50

3/8"

1.00

0.30

0.560

0.50

3/8"

1.00

0.30

0.560

1.34

3/8"

1.00

13

0.30

0.560

2.12

3/8"

1.00

17

0.30

0.560

2.86

3/8"

1.00

12

0.30

0.560

1.95

3/8"

1.00

0.30

0.560

1.48

3/8"

1.00

11

0.30

0.560

1.88

3/8"

1.00

10

0.30

0.560

1.61

3/8"

1.00

11

0.30

0.560

1.88

3/8"

1.00

0.30

0.560

0.60

3/8"

1.00

11

0.30

0.560

1.85

3/8"

1.00

11

0.30

0.560

1.85

3/8"

1.00

0.30

0.560

0.81

3/8"

1.00

11

0.30

0.560

1.88

3/8"

1.00

11

0.30

0.560

1.88

3/8"

1.00

11

0.30

0.560

1.88

3/8"

1.00

12

0.30

0.560

1.98

3/8"

1.00

13

0.30

0.560

2.12

3/8"

1.00

13

0.30

0.560

2.25

Kg

93.20

1-2

2-2

2-3

3-3

3-4

4-4

4-5
5-6

6-7

7-8

8-8

8-10

10-10
10-11

11-11

Total Acero de refuerzo fy = 4,200 kg/cm2 grado 60


01.03.03

SOBRECIMIENTOS

01.03.03.02

ENCOFRADO Y DESENCOFRADO P/SOBRECIMIENTO

MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO

Metrado Estructuras
7

CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA "COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO"

HOJA DE METRADOS DE ESTRUCTURAS


OBRA

: CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO
: ESTRUCTURAS

N PISO

DESCRIPCION

EJE

DIMENCIONES

CANT. DE
ELEMENTOS

Largo

2.00
2.00

Ancho

AREA
Alto

PARCIAL

2.95

0.40

2.36

3.15

0.40

2.52

2.00

3.35

0.40

2.68

2.00

3.80

0.40

3.04

2.00

3.80

0.40

3.04

2.00

1.85

0.40

1.48

2.00

3.85

0.40

3.08

2.00

1.1

0.40

0.88

2.00

1.25

0.40

1.00

2.00

1.45

0.40

1.16

2.00

2.2

0.40

1.76

2.00

3.55

0.40

2.84

2.00

2.1

0.40

1.68

2.00

1.075

0.40

0.86

2.00

0.85

0.40

0.68

2.00

2.95

0.40

2.36

2.00

2.55

0.40

2.04

2.00

3.80

0.40

3.04

2.00

0.48

0.40

0.38

2.00

0.75

0.40

0.60

2.00

1.90

0.40

1.52

2.00

1.27

0.40

1.02

2.00

3.80

0.40

3.04

2.00

1.05

0.40

0.84

2.00

0.55

0.40

0.44

2.00

1.70

0.40

1.36

2.00

2.35

0.40

1.88

2.00

0.95

0.40

0.76

2.00

0.55

0.40

0.44

2.00

1.08

0.40

0.86

2.00

2.10

0.40

1.68

2.00

2.95

0.40

2.36

2.00

1.80

0.40

1.44

2.00

0.68

0.40

0.54

2.00

4.15

0.40

3.32

2.00

1.43

0.40

1.15

2.00

0.99

0.40

0.79

2.00

1.25

0.40

1.00

2.00

2.95

0.40

2.36

2.00

1.85

0.40

1.48

2.00

2.70

0.40

2.16

2.00

2.70

0.40

2.16

2.00

2.69

0.40

2.15

2.00

2.70

0.40

2.16

2.00

2.68

0.40

2.14

2.00

2.70

0.40

2.16

2.00

0.75

0.40

0.60

2.00

0.75

0.40

0.60

2.00

1.95

0.40

1.56

2.00

3.15

0.40

2.52

2.00

4.25

0.40

3.40

2.00

2.90

0.40

2.32

2.00

2.20

0.40

1.76

2.00

2.80

0.40

2.24

2.00

2.40

0.40

1.92

2.00

2.80

0.40

2.24

2.00

0.90

0.40

0.72

2.00

2.80

0.40

2.24

2.00

2.90

0.40

2.32

2.00

1.20

0.40

0.96

2.00

2.80

0.40

2.24

2.00

2.80

0.40

2.24

2.00

2.80

0.40

2.24

2.00

2.94

0.40

2.35

2.00

3.15

0.40

2.52

TOTAL

1-1

1-2

2-2

2-3

3-3

3-4

4-4

4-5
5-6

6-7

7-8

8-8

8-10

10-10
10-11

11-11

MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO

Metrado Estructuras
8

CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA "COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO"

HOJA DE METRADOS DE ESTRUCTURAS


OBRA

: CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO
: ESTRUCTURAS

2.00

3.35

0.40

Total encofrado y desencofrado


01.03.03.02
N PISO

2.68
m2

118.36

CONCRETO P/SOBRECIMIENTOS 1:8 + 25 % P.M. MAX. 3"


DESCRIPCION

EJE

DIMENCIONES

VOLUMEN

CANT. DE
ELEMENTOS

Largo

ANCHO

Alto

PARCIAL

1.00

2.95

0.15

0.40

0.18

1.00

3.15

0.15

0.40

0.19

1.00

3.35

0.15

0.40

0.20

1.00

3.80

0.15

0.40

0.23

1.00

3.80

0.15

0.40

0.23

1.00

1.85

0.15

0.40

0.11

1.00

3.85

0.15

0.40

0.23

1.00

1.1

0.15

0.40

0.07

1.00

1.25

0.15

0.40

0.08

1.00

1.45

0.15

0.40

0.09

1.00

2.2

0.15

0.40

0.13

1.00

3.55

0.15

0.40

0.21

1.00

2.1

0.15

0.40

0.13

1.00

1.075

0.15

0.40

0.06

1.00

0.85

0.15

0.40

0.05

1.00

2.95

0.15

0.40

0.18

1.00

2.55

0.15

0.40

0.15

1.00

3.80

0.15

0.40

0.23

1.00

0.48

0.15

0.40

0.03

1.00

0.75

0.15

0.40

0.04

1.00

1.90

0.15

0.40

0.11

1.00

1.27

0.15

0.40

0.08

1.00

3.80

0.15

0.40

0.23

1.00

1.05

0.15

0.40

0.06

1.00

0.55

0.15

0.40

0.03

1.00

1.70

0.15

0.40

0.10

1.00

2.35

0.15

0.40

0.14

1.00

0.95

0.15

0.40

0.06

1.00

0.55

0.15

0.40

0.03

1.00

1.08

0.15

0.40

0.06

1.00

2.10

0.15

0.40

0.13

1.00

2.95

0.15

0.40

0.18

1.00

1.80

0.15

0.40

0.11

1.00

0.68

0.15

0.40

0.04

1.00

4.15

0.15

0.40

0.25

1.00

1.43

0.15

0.40

0.09

1.00

0.99

0.15

0.40

0.06

1.00

1.25

0.15

0.40

0.08

1.00

2.95

0.15

0.40

0.18

1.00

1.85

0.15

0.40

0.11

1.00

2.70

0.15

0.40

0.16

1.00

2.70

0.15

0.40

0.16

1.00

2.69

0.15

0.40

0.16

1.00

2.70

0.15

0.40

0.16

1.00

2.68

0.15

0.40

0.16

1.00

2.70

0.15

0.40

0.16

1.00

0.75

0.15

0.40

0.05

1.00

0.75

0.15

0.40

0.05

1.00

1.95

0.15

0.40

0.12

1.00

3.15

0.15

0.40

0.19

1.00

4.25

0.15

0.40

0.26

1.00

2.90

0.15

0.40

0.17

1.00

2.20

0.15

0.40

0.13

1.00

2.80

0.15

0.40

0.17

1.00

2.40

0.15

0.40

0.14

1.00

2.80

0.15

0.40

0.17

1.00

0.90

0.15

0.40

0.05

1.00

2.80

0.15

0.40

0.17

1.00

2.90

0.15

0.40

0.17

1.00

1.20

0.15

0.40

0.07

1.00

2.80

0.15

0.40

0.17

1.00

2.80

0.15

0.40

0.17

1.00

2.80

0.15

0.40

0.17

TOTAL

1-1

1-2

2-2

2-3

3-3

3-4

4-4

4-5
5-6

6-7

7-8

8-8

8-10

10-10
10-11

MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO

Metrado Estructuras
9

CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA "COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO"

HOJA DE METRADOS DE ESTRUCTURAS


OBRA

: CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO
: ESTRUCTURAS

11-11
1.00

2.94

0.15

0.40

0.18

1.00

3.15

0.15

0.40

0.19

1.00

3.35

0.15

0.40

0.20

Total concreto Sobrecimientos


01.03.04

FALSO PISO

01.03.04.01

CONCRETO P/FALSO PISO e=4" 1:8 C:H

m3

DIMENCIONES

AREA

CANT. DE
ELEMENTOS

rea

DORM. DAMAS

1.00

16.99

16.99

DORM. TAMBERO

1.00

10.12

10.12

S.H. DISC.

1.00

4.34

4.34

S.H. DAMAS

1.00

5.27

5.27

S.H. VARONES

1.00

5.65

5.65

HALL

1.00

13.23

13.23

DORM. GUARDIAN

1.00

5.29

5.29

DORM. VARONES

1.00

15.67

15.67

DEPOS. GENERAL

1.00

21.88

21.88

SALON DE USOS MULTIPLES

1.00

76.69

76.69

CUARTO DE TABLEROS

1.00

3.94

3.94

HALL

1.00

4.39

4.39

COCINA

1.00

16.28

16.28

PASADIZO

1.00

4.01

4.01

OFICINA 2

1.00

19.79

19.79

OFICINA 1

1.00

20.97

20.97

N PISO

DESCRIPCION

EJE

Ancho

8.88

Alto

PARCIAL

TOTAL

MODULO

Total Falso piso

m2

01.03.05

SARDINELES EN SS.HH.

01.03.05.01

ENCOFRADO Y DESENCOFRADO P/SARDINEL

N PISO

DESCRIPCION

DIMENCIONES

EJE

CANT. DE
ELEMENTOS

Largo

S.H.D

2.00

S.H.T

2.00

S.H.V
S.H

Ancho

AREA
Alto

PARCIAL

1.20

0.20

0.48

1.10

0.20

0.44

2.00

1.34

0.20

0.53

2.00

1.20

0.20

0.48

Total encofrado y desencofrado


01.03.05.02
N PISO

m2

DESCRIPCION

DIMENCIONES

CANT. DE
ELEMENTOS

Largo

Ancho

Alto

PARCIAL

S.H.D

1.00

1.20

0.05

0.20

0.01

S.H.T

1.00

1.10

0.05

0.20

0.01

S.H.V

1.00

1.34

0.05

0.20

0.01

S.H

1.00

1.20

0.05

0.20

0.01
m3

VEREDAS Y RAMPAS

01.03.05.01

ENCOFRADO Y DESENCOFRADO P/VEREDAS


DESCRIPCION

EJE

DIMENCIONES

CANT. DE
ELEMENTOS

Largo

1.00

93.08

Ancho

PARCIAL

0.30

27.92
m2

DESCRIPCION

EJE

DIMENCIONES

TOTAL

27.92

VOLUMEN

CANT. DE
ELEMENTOS

Largo

Ancho

Alto

PARCIAL

1.00

93.08

0.15

0.45

6.28

1.00

93.08

0.85

0.10

9.31

1.00

17.30

2.60

0.10

1.73

1.00

4.05

1.00

0.10

0.41

1.00

3.625

1.2

0.10

0.36

1.00

2.9

1.5

0.10

0.29

Total de concreto f'c =175 kg/cm2

N PISO

0.05

CONCRETO F'C= 175 KG/CM2

Vereda hacia Asta de Bandera

01.03.06.03

TOTAL

AREA
Alto

Total de encofrado y desencofrado p/veredas

N PISO

1.93

Volumen

EJE

01.03.06

01.03.06.02

TOTAL

CONCRETO FC= 210kg/cm2

Total encofrado y desencofrado

N PISO

244.50

TOTAL

m3

18.38

PARCIAL

TOTAL

JUNTA ASFALTICA DE DILATACION Y CONTACCION 1/2" P/VEREDAS


DESCRIPCION

EJE

DIMENCIONES

CANT. DE
ELEMENTOS

Largo

20.00

1.00

20.00

6.00

2.40

14.40

5.00

1.90

9.50

VEREDAS

Total junta asfaltica de dilatacion y contaccion 1/2" p/veredas

MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO

Ancho

Alto

43.90

Metrado Estructuras
10

CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA "COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO"

HOJA DE METRADOS DE ESTRUCTURAS


OBRA

: CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO
: ESTRUCTURAS

01.03.06.04

BRUAS DE 1 CM X 1 CM

N PISO

DESCRIPCION

EJE

DIMENCIONES

CANT. DE
ELEMENTOS

Largo

2.00

9.48

4.00

0.80

3.20

168.16

1.90

319.51

VEREDAS

Ancho

Alto

OBRAS DE CONCRETO ARMADO

01.04.01

ZAPATAS

01.04.01.01

ENTIBADO DE ZAPATAS

N PISO

DESCRIPCION

EJE

CANT. DE
ELEMENTOS

DIMENCIONES
LARGO

N PISO

Alto

PARCIAL

Z-1

8.00

4.80

1.10

42.24

Z-2

26.00

4.00

1.10

114.4

Z-3

6.00

3.00

0.50

Z-4

1.00

6.00

0.50

3
m2

N PISO

168.64

CANTIDAD
ELEMENTO

N DE PIEZAS

LONGITUD
PIEZA

Kg/ml

PESO

Z-1

1/2"

8.00

11.25

1.13

0.994

100.64

Z-2

1/2"

26.00

9.25

0.93

0.994

221.13

Z-3

1/2"

6.00

6.75

0.68

0.994

27.17

Z-4

1/2"

1.00

11.63

2.33

0.994

26.87

1.00

3.63

0.73

0.994

2.61

Kg

378.42

DESCRIPCION

EJE

CONCRETO Fc = 210 Kg/cm2


DIMENCIONES

VOLUMEN

CANT. DE
ELEMENTOS

Largo

Ancho

Alto

PARCIAL

Z-1

8.00

1.20

1.20

0.40

4.61

Z-2

26.00

1.00

1.00

0.40

10.40

Z-3

6.00

0.75

0.75

0.35

1.18

Z-4

1.00

2.20

0.80

0.30

0.53

DESCRIPCION

EJE

Total Zapatas

m3

01.04.02

VIGAS DE CIMENTACION

01.04.02.01

ENCOFRADO Y DESENCOFRADO NORMAL VIGAS DE CIMENTACION

N PISO

TOTAL

ACERO CORRUGADO Fy=4,200 kg/cm2 GRADO 60

Total Acero de refuerzo fy = 4,200 kg/cm2


01.04.01.02

341.66

AREA

ANCHO

Total Entibado de Zapatas


01.04.01.02

TOTAL

18.95

Total junta asfaltica de dilatacion y contaccion 1/2" p/veredas


01.04

PARCIAL

DESCRIPCION

EJE

DIMENCIONES

TOTAL

16.72

AREA

CANT. DE
ELEMENTOS

N Lados

Largo

Alto

PARCIAL

2.95

0.4

6.35

3.15

0.4

6.55

3.338

0.4

6.74

3.8

0.4

7.20

3.8

0.4

7.20

3.8

0.4

7.20

3.8

0.4

7.20

2.95

0.4

6.35

3.118

0.4

6.52

3.35

0.4

6.75

3.8

0.4

7.20

3.8

0.4

7.20

3.8

0.4

7.20

3.8

0.4

7.20

2.95

0.4

6.35

3.15

0.4

6.55

3.327

0.4

6.73

4.15

0.4

7.55

4.15

0.4

7.55

2.95

0.4

6.35

3.15

0.4

6.55

2.7

0.4

9.10

2.95

0.4

6.35

3.15

0.4

6.55

4.25

0.4

7.65

TOTAL

1-1

1-2

2-2

2-3

3-3

3-4

4-4

4-8
8-8

8-10

MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO

Metrado Estructuras
11

CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA "COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO"

HOJA DE METRADOS DE ESTRUCTURAS


OBRA

: CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO
: ESTRUCTURAS

4.1

0.4

7.50

4.25

0.4

7.65

3.35

0.4

6.75

2.8

0.4

6.20

2.8

0.4

6.20

2.8

0.4

6.20

2.8

0.4

6.20

2.8

0.4

6.20

2.95

0.4

6.35

3.15

0.4

6.55

3.35

0.4

6.75

10-11

11-11

Total Encofrado y desencofrado normal vigas de cimentacion


01.04.02.02
N PISOS

m2

246.68

ACERO CORRUGADO fy=4,200 kg/cm2 GRADO 60


DESCRIPCION

EJE

CANTIDAD
ELEMENTO

N DE PIEZAS

LONGITUD
PIEZA

Kg/ml

PESO

1/2"

3.45

0.994

6.86

1/2"

2.95

0.994

5.86

1/2"

3.3

0.994

6.56

1/2"

3.65

0.994

7.26

1/2"

3.15

0.994

6.26

1/2"

3.5

0.994

6.96

1/2"

3.838

0.994

7.63

1/2"

3.338

0.994

6.64
7.33

1-1

1/2"

3.688

0.994

1/2"

4.3

0.994

34.19

1/2"

3.8

0.994

30.22

1/2"

4.15

0.994

33.00

1/2"

3.45

0.994

6.86

1/2"

2.95

0.994

5.86

1/2"

3.3

0.994

6.56

1/2"

3.618

0.994

7.19

1/2"

3.118

0.994

6.20

1/2"

3.468

0.994

6.89

1/2"

3.85

0.994

7.65

1/2"

3.35

0.994

6.66

1/2"

3.7

0.994

7.36

1/2"

4.3

0.994

34.19

1/2"

3.8

0.994

30.22

1/2"

0.35

0.994

2.78

1/2"

3.45

0.994

6.86

1/2"

2.95

0.994

5.86

1/2"

3.3

0.994

6.56

1/2"

3.65

0.994

7.26

1/2"

3.15

0.994

6.26

1/2"

3.5

0.994

6.96

1/2"

3.827

0.994

7.61

1/2"

3.327

0.994

6.61

1/2"

3.677

0.994

7.31

1/2"

4.65

0.994

18.49

1/2"

4.15

0.994

16.50

1/2"

4.5

0.994

17.89

1/2"

3.45

0.994

6.86

1/2"

2.95

0.994

5.86

1/2"

3.3

0.994

6.56

1/2"

3.65

0.994

7.26

1/2"

3.15

0.994

6.26

1/2"

3.5

0.994

6.96

1/2"

3.2

0.994

6.36

1/2"

2.7

0.994

5.37

1/2"

3.05

0.994

6.06

1/2"

3.45

0.994

6.86

1/2"

2.95

0.994

5.86

1/2"

3.3

0.994

6.56

1/2"

3.65

0.994

7.26

1/2"

3.15

0.994

6.26

1/2"

3.5

0.994

6.96

1/2"

4.75

0.994

18.89

1/2"

4.25

0.994

16.90

1/2"

4.6

0.994

18.29

1/2"

4.6

0.994

9.14

1/2"

4.1

0.994

8.15

1-2

2-2

2-3

3-3

3-4

4-4

4-8

8-8

8-10

MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO

Metrado Estructuras
12

CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA "COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO"

HOJA DE METRADOS DE ESTRUCTURAS


OBRA

: CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO
: ESTRUCTURAS

1/2"

4.45

0.994

8.85

1/2"

3.85

0.994

7.65

1/2"

3.35

0.994

6.66

1/2"

3.7

0.994

7.36

1/2"

3.3

0.994

6.56

1/2"

2.8

0.994

5.57

1/2"

3.15

0.994

6.26

3.3

0.994

26.24

2.8

0.994

22.27

3.15

0.994

25.05

1/2"

3.45

0.994

6.86

1/2"

2.95

0.994

5.86

1/2"

3.3

0.994

6.56

1/2"

3.65

0.994

7.26

1/2"

3.15

0.994

6.26

1/2"

3.5

0.994

6.96

1/2"

3.85

0.994

7.65

1/2"

3.35

0.994

6.66

1/2"

3.7

0.994

7.36

Kg

753.95

10-11
1/2"
11-11

Total Acero de refuerzo fy = 4,200 kg/cm2 grado 60


01.04.02.03
N PISO

CONCRETO Fc = 210 Kg/cm2


DESCRIPCION

EJE

DIMENCIONES

VOLUMEN

CANT. DE
ELEMENTOS

Largo

Ancho

Alto

PARCIAL

2.95

0.25

0.4

0.30

3.15

0.25

0.4

0.32

3.338

0.25

0.4

0.33

3.8

0.25

0.4

0.38

3.8

0.25

0.4

0.38

3.8

0.25

0.4

0.38

3.8

0.25

0.4

0.38

2.95

0.25

0.4

0.30

3.118

0.25

0.4

0.31

3.35

0.25

0.4

0.34

3.8

0.25

0.4

0.38

3.8

0.25

0.4

0.38

3.8

0.25

0.4

0.38

3.8

0.25

0.4

0.38

2.95

0.25

0.4

0.30

3.15

0.25

0.4

0.32

3.327

0.25

0.4

0.33

4.15

0.25

0.4

0.42

4.15

0.25

0.4

0.42

2.95

0.25

0.4

0.30

3.15

0.25

0.4

0.32

2.7

0.25

0.4

1.08

2.95

0.25

0.4

0.30

3.15

0.25

0.4

0.32

4.25

0.25

0.4

0.43

4.1

0.25

0.4

0.41

4.25

0.25

0.4

0.43

3.35

0.25

0.4

0.34

2.8

0.25

0.4

0.28

2.8

0.25

0.4

0.28

2.8

0.25

0.4

0.28

2.8

0.25

0.4

0.28

2.8

0.25

0.4

0.28

2.95

0.25

0.4

0.30

3.15

0.25

0.4

0.32

3.35

0.25

0.4

0.34

TOTAL

1-1

1-2

2-2

2-3

3-3

3-4

4-4

4-8
8-8

8-10

10-11

11-11

Total concreto 210 kg/cm2

m3

01.04.03

COLUMNAS

01.04.03.01

ENCOFRADO Y DESENCOFRADO DE ESTRUCTURA CARAVISTA COLUMNAS

N PISO

DESCRIPCION

EJE

DIMENCIONES

CANT. DE
ELEMENTOS

LARGO

1.00

ANCHO

12.94

AREA
Alto

PARCIAL

3.55

3.55

TOTAL

EJE 1-1
C1

MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO

Metrado Estructuras
13

CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA "COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO"

HOJA DE METRADOS DE ESTRUCTURAS


OBRA

: CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO
: ESTRUCTURAS

C1

1.00

5.25

5.25

C1

1.00

5.25

5.25

C1

1.00

3.55

3.55

C1

1.00

3.55

3.55

C1

1.00

3.55

3.55

C1

1.00

3.55

3.55

C1

1.00

3.55

3.55

C1

1.00

3.55

3.55

C1

1.00

3.55

3.55

C1

1.00

5.4

5.40

C1

1.00

3.55

3.55

C1

1.00

3.55

3.55

C6

1.30

5.303

6.89

C1

1.00

5.303

5.30

C1

1.00

3.55

3.55

C1

1.00

5.303

5.30

C1

1.00

3.55

3.55

C1

1.00

5.303

5.30

C1

1.00

3.55

3.55

C1

1.00

5.303

5.30

C1

1.00

3.55

3.55

C6

1.30

5.303

6.89

C1

1.00

5.303

5.30

C1

1.00

5.404

5.40

C1

1.00

3.55

3.55

1.00

3.55

14.20

C1

1.00

3.55

3.55

C1

1.00

5.32

5.32

C1

1.00

5.32

5.32

C1

1.00

3.55

3.55

C5

1.20

0.95

3.42

EJE 2-2

EJE 3-3

EJE 4-4

EJE 5-5

EJE 6-6

EJE 7-7

EJE 8-8

EJE 9-9

EJE 10-10
C1
EJE 11-11

Total Encofrado y Desencofrado para Columnas


01.04.03.02
N PISOS

m2

150.22

ACERO CORRUGADO fy=4,200 kg/cm2 GRADO 60


DESCRIPCION

EJE

CANTIDAD
ELEMENTO

N DE PIEZAS

LONGITUD
PIEZA

Kg/ml

PESO

1/2"

1.00

4.00

4.25

0.994

16.90

3/8"

1.00

2.00

4.25

0.560

4.76

3/8"

1.00

42.00

1.00

0.560

23.52

1/2"

1.00

4.00

5.95

0.994

23.66

3/8"

1.00

2.00

5.95

0.560

6.66

3/8"

1.00

59.00

1.00

0.560

33.04

1/2"

1.00

4.00

5.95

0.994

23.66

3/8"

1.00

2.00

5.95

0.560

6.66

3/8"

1.00

59.00

1.00

0.560

33.04

1/2"

1.00

4.00

4.25

0.994

16.90

3/8"

1.00

2.00

4.25

0.560

4.76

3/8"

1.00

42.00

1.00

0.560

23.52

1/2"

1.00

4.00

4.25

0.994

16.90

3/8"

1.00

2.00

4.25

0.560

4.76

3/8"

1.00

42.00

1.00

0.560

23.52

1/2"

1.00

4.00

4.25

0.994

16.90

3/8"

1.00

2.00

4.25

0.560

4.76

3/8"

1.00

42.00

1.00

0.560

23.52

1/2"

1.00

4.00

4.25

0.994

16.90

3/8"

1.00

2.00

4.25

0.560

4.76

3/8"

1.00

42.00

1.00

0.560

23.52

1/2"

1.00

4.00

4.25

0.994

16.90

3/8"

1.00

2.00

4.25

0.560

4.76

3/8"

1.00

42.00

1.00

0.560

23.52

1/2"

1.00

4.00

4.25

0.994

16.90

3/8"

1.00

2.00

4.25

0.560

4.76

3/8"

1.00

42.00

1.00

0.560

23.52

1/2"

1.00

4.00

4.25

0.994

16.90

3/8"

1.00

2.00

4.25

0.560

4.76

3/8"

1.00

42.00

1.00

0.560

23.52

1/2"

1.00

4.00

6.10

0.994

24.25

3/8"

1.00

2.00

6.10

0.560

6.83

3/8"

1.00

61.00

1.00

0.560

34.16

EJE 1-1
C1

C1

C1

C1

EJE 2-2
C1

C1

C1

C1

EJE 3-3
C1

C1

C1

MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO

Metrado Estructuras
14

CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA "COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO"

HOJA DE METRADOS DE ESTRUCTURAS


OBRA

: CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO
: ESTRUCTURAS

C1

1/2"

1.00

4.00

4.25

0.994

3/8"

1.00

2.00

4.25

0.560

4.76

3/8"

1.00

42.00

1.00

0.560

23.52

1/2"

1.00

4.00

4.25

0.994

16.90

3/8"

1.00

2.00

4.25

0.560

4.76

3/8"

1.00

42.00

1.00

0.560

23.52

1/2"

1.00

8.00

6.00

0.994

47.74

3/8"

1.00

60.00

1.30

0.560

43.68

1/2"

1.00

4.00

6.00

0.994

23.87

3/8"

1.00

2.00

6.00

0.560

6.72

3/8"

1.00

60.00

1.00

0.560

33.60

1/2"

1.00

4.00

4.25

0.994

16.90

3/8"

1.00

2.00

4.25

0.560

4.76

3/8"

1.00

42.00

1.00

0.560

23.52

1/2"

1.00

4.00

6.00

0.994

23.87

3/8"

1.00

2.00

6.00

0.560

6.72

3/8"

1.00

60.00

1.00

0.560

33.60

1/2"

1.00

4.00

4.25

0.994

16.90

3/8"

1.00

2.00

4.25

0.560

4.76

3/8"

1.00

42.00

1.00

0.560

23.52

1/2"

1.00

4.00

6.00

0.994

23.87

3/8"

1.00

2.00

6.00

0.560

6.72

3/8"

1.00

60.00

1.00

0.560

33.60

1/2"

1.00

4.00

4.25

0.994

16.90

3/8"

1.00

2.00

4.25

0.560

4.76

3/8"

1.00

42.00

1.00

0.560

23.52

1/2"

1.00

4.00

6.00

0.994

23.87

3/8"

1.00

2.00

6.00

0.560

6.72

3/8"

1.00

60.00

1.00

0.560

33.60

1/2"

1.00

4.00

4.25

0.994

16.90

3/8"

1.00

2.00

4.25

0.560

4.76

3/8"

1.00

42.00

1.00

0.560

23.52

1/2"

1.00

8.00

6.00

0.994

47.74

3/8"

1.00

60.00

1.30

0.560

43.68

1/2"

1.00

4.00

6.00

0.994

23.87

3/8"

1.00

2.00

6.00

0.560

6.72

3/8"

1.00

60.00

1.00

0.560

33.60

1/2"

1.00

4.00

6.10

0.994

24.27

3/8"

1.00

2.00

6.10

0.560

6.84

3/8"

1.00

61.00

1.00

0.560

34.16

1/2"

1.00

4.00

4.25

0.994

16.90

3/8"

1.00

2.00

4.25

0.560

4.76

3/8"

1.00

42.00

1.00

0.560

23.52

1/2"

1.00

4.00

4.25

0.994

16.90

3/8"

1.00

2.00

4.25

0.560

4.76

3/8"

1.00

42.00

1.00

0.560

23.52

1/2"

1.00

4.00

4.25

0.994

16.90

3/8"

1.00

2.00

4.25

0.560

4.76

3/8"

1.00

42.00

1.00

0.560

23.52

1/2"

1.00

4.00

6.02

0.994

23.94

3/8"

1.00

2.00

6.02

0.560

6.74

3/8"

1.00

60.00

1.00

0.560

33.60

1/2"

1.00

4.00

6.02

0.994

23.94

3/8"

1.00

2.00

6.02

0.560

6.74

3/8"

1.00

60.00

1.00

0.560

33.60

1/2"

1.00

4.00

4.25

0.994

16.90

3/8"

1.00

2.00

4.25

0.560

4.76

3/8"

1.00

42.00

1.00

0.560

23.52

3/8"

3.00

6.00

1.55

0.560

15.62

3/8"

3.00

15.00

1.20

0.560

30.24

Kg.

1,748.65

16.90

EJE 4-4
C1

C6
C1

EJE 5-5
C1

C1

EJE 6-6
C1

C1

EJE 7-7
C1

C1

EJE 8-8
C1

C6

C1

EJE 9-9
C1

C1

EJE 10-10
C1

EJE 11-11
C1

C1

C1

C1

C5

Total Acero de refuerzo fy = 4,200 kg/cm2


01.04.03.03
N PISO

CONCRETO fc = 210 Kg/cm2


DIMENCIONES

VOLUMEN

CANT. DE
ELEMENTOS

Largo

Ancho

Alto

PARCIAL

C1

0.25

0.25

3.95

0.25

C1

0.25

0.25

5.65

0.35

C1

0.25

0.25

5.65

0.35

C1

0.25

0.25

3.95

0.25

0.25

0.25

3.95

0.25

DESCRIPCION

EJE

TOTAL

EJE 1-1

EJE 2-2
C1

MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO

Metrado Estructuras
15

CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA "COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO"

HOJA DE METRADOS DE ESTRUCTURAS


OBRA

: CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO
: ESTRUCTURAS

C1

0.25

0.25

3.95

0.25

C1

0.25

0.25

3.95

0.25

C1

0.25

0.25

3.95

0.25

C1

0.25

0.25

3.95

0.25

C1

0.25

0.25

3.95

0.25

C1

0.25

0.25

5.8

0.36

C1

0.25

0.25

3.95

0.25

C1

0.25

0.25

3.95

0.25

C6

0.25

0.4

5.703

0.57

C1

0.25

0.25

5.703

0.36

C1

0.25

0.25

3.95

0.25

C1

0.25

0.25

5.703

0.36

C1

0.25

0.25

3.95

0.25

C1

0.25

0.25

5.703

0.36

C1

0.25

0.25

3.95

0.25

C1

0.25

0.25

5.703

0.36

C1

0.25

0.25

3.95

0.25

C6

0.25

0.4

5.703

0.57

C1

0.25

0.25

5.703

0.36

C1

0.25

0.25

5.804

0.36

C1

0.25

0.25

3.95

0.25

0.25

0.25

3.95

0.99

C1

0.25

0.25

3.95

0.25

C1

0.25

0.25

5.72

0.36

C1

0.25

0.25

5.72

0.36

C1

0.25

0.25

3.95

0.25

C5

0.30

0.3

0.95

0.26

EJE 3-3

EJE 4-4

EJE 5-5

EJE 6-6

EJE 7-7

EJE 8-8

EJE 9-9

EJE 10-10
C1
EJE 11-11

Total Concreto para Columnas de fc = 210 Kg./ cm2

m3

01.04.04

VIGAS

01.04.04.01

ENCOFRADO Y DESENCOFRADO DE ESTRUCTURA CARAVISTA VIGAS

N PISO

DESCRIPCION

DIMENCIONES

EJE

CANT. DE
ELEMENTOS

N Lados

Largo

C-C

1.00

2.00

1.00

2.00

1.00

10.51

AREA
Alto

PARCIAL

3.80

0.3

2.28

3.80

0.30

2.28

2.00

4.15

0.30

2.49

1.00

2.00

2.70

0.30

1.62

1.00

2.00

2.70

0.30

1.62

1.00

2.00

2.70

0.30

1.62

1.00

2.00

2.70

0.30

1.62

1.00

2.00

4.25

0.30

2.55

1.00

2.00

2.80

0.30

1.68

1.00

2.00

3.80

0.30

2.28

1.00

2.00

3.80

0.30

2.28

1.00

2.00

4.10

0.30

2.46

1.00

2.00

2.80

0.30

1.68

1.00

2.00

3.80

0.30

2.28

1.00

2.00

3.80

0.30

2.28

1.00

2.00

4.15

0.30

2.49

1.00

2.00

2.70

0.30

1.62

1.00

2.00

2.70

0.30

1.62

1.00

2.00

2.70

0.30

1.62

1.00

2.00

2.70

0.30

1.62

1.00

2.00

1.20

0.30

0.72

1.00

2.00

2.80

0.30

1.68

1.00

2.00

2.80

0.30

1.68

1.00

2.00

4.15

0.30

2.49

1.00

2.00

2.70

0.30

1.62

1.00

2.00

2.70

0.30

1.62

1.00

2.00

2.70

0.30

1.62

1.00

2.00

2.70

0.30

1.62

1.00

2.00

1.20

0.30

0.72

1.00

2.00

3.80

0.30

2.28

1.00

2.00

3.80

0.30

2.28

1.00

2.00

2.80

0.30

1.68

1.00

2.00

2.80

0.30

1.68

TOTAL

D-D

E-E

F-F

1-1

MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO

Metrado Estructuras
16

CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA "COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO"

HOJA DE METRADOS DE ESTRUCTURAS


OBRA

: CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO
: ESTRUCTURAS

1.00

2.00

2.95

0.30

1.77

1.00

2.00

3.15

0.30

1.89

1.00

2.00

3.35

0.30

2.01

1.00

2.00

2.95

0.30

1.77

1.00

2.00

0.90

0.30

0.54

1.00

2.00

1.90

0.30

1.14

1.00

2.00

3.35

0.30

2.01

1.00

2.00

2.95

0.30

1.77

1.00

2.00

3.15

0.30

1.89

1.00

2.00

3.35

0.30

2.01

1.00

2.00

2.95

0.30

1.77

1.00

2.00

1.85

0.30

1.11

1.00

2.00

1.15

0.30

0.69

1.00

2.00

2.95

0.30

1.77

1.00

2.00

3.15

0.30

1.89

1.00

2.00

3.15

0.30

1.89

1.00

2.00

3.35

0.30

2.01

1.00

2.00

1.70

0.30

1.02

1.00

2.00

2.95

0.30

1.77

1.00

2.00

3.13

0.30

1.878

1.00

2.00

3.35

0.30

2.01

1.00

2.00

1.10

0.30

0.66

1.00

2.00

3.85

0.30

2.31

1.00

2.00

2.20

0.30

1.32

1.00

2.00

3.55

0.30

2.13

1.00

2.00

1.90

0.30

1.14

1.00

2.00

1.70

0.30

1.02

1.00

0.95

0.95

0.30

0.27075

1.00

2.00

2.75

0.30

1.65

1.00

2.00

2.25

0.30

1.35

1.00

2.00

4.05

0.30

2.43

1.00

2.00

1.25

0.30

0.75

1.00

2.00

2.90

0.30

1.74

1.00

2.00

1.10

0.30

0.66

2-2

3-3

4-4

8-8

9-9

10-10
11-11

ENTRE 1-2

ENTRE 2-3

ENTRE 3-4

ENTRE 10-11

Total Encofrado y Desencofrado Normal para Vigas


01.04.04.02

m2

113.72

ACERO CORRUGADO fy= 4,200 kg/cm2 GRADO 60

N PISOS

DESCRIPCION

EJE

CANTIDAD
ELEMENTO

N DE PIEZAS

LONGITUD
PIEZA

Kg/ml

PESO

1/2"

32.3743

0.994

64.36

1/2"

32.4343

0.994

64.48

3/8"

228

1.1

0.560

140.45

1/2"

8.06

0.994

16.02

1/2"

8.12

0.994

16.14

3/8"

55

1.1

0.560

33.88

1/2"

8.5811

0.994

17.06

1/2"

8.6411

0.994

17.18

3/8"

56

1.1

0.560

34.50

1/2"

32.37

0.994

64.35

1/2"

32.43

0.994

64.47

3/8"

228

1.1

0.560

140.45

1/2"

17.65

0.994

35.09

1/2"

17.65

0.994

35.09

3/8"

128

1.1

0.560

78.85

1/2"

8.62

0.994

17.14

1/2"

8.68

0.994

17.26

3/8"

54

1.1

0.560

33.26

1/2"

6.69

0.994

13.30

1/2"

6.75

0.994

13.42

3/8"

44

1.1

0.560

27.10

1/2"

10.67

0.994

21.21

1/2"

10.73

0.994

21.33

3/8"

72

1.1

0.560

44.35

MODULO
VA-1(.25 X.30)

C-C

D-D

E-E

F-F

1-1

MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO

Metrado Estructuras
17

CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA "COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO"

HOJA DE METRADOS DE ESTRUCTURAS


OBRA

: CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO
: ESTRUCTURAS

2-2
1/2"

10.67

0.994

21.21

1/2"

10.73

0.994

21.33

3/8"

72

1.1

0.560

44.35

1/2"

10.6374

0.994

21.15

1/2"

10.6974

0.994

21.27

3/8"

72

1.1

0.560

44.35

1/2"

7.07

0.994

14.06

1/2"

7.13

0.994

14.17

3/8"

47

1.1

0.560

28.95

1/2"

7.07

0.994

14.06

1/2"

7.13

0.994

14.17

3/8"

50

1.1

0.560

30.80

1/2"

7.4076

0.994

14.73

1/2"

7.4676

0.994

14.85

3/8"

49

1.1

0.560

30.18

1/2"

10.6505

0.994

21.17

1/2"

10.7105

0.994

21.29

3/8"

1.1

0.560

4.31

kg

1,427.14

3-3

4-4

8-8

9-9

11-11

Total Acero de refuerzo fy = 4,200 kg/cm2


01.04.04.03
N PISO

CONCRETO P/VIGAS fc = 210 Kg/cm2


DESCRIPCION

DIMENCIONES

VOLUMEN

EJE

CANT. DE
ELEMENTOS

Largo

Ancho

Alto

PARCIAL

C-C

1.00

3.80

0.25

0.30

0.285

1.00

3.80

0.25

0.30

0.285

1.00

4.15

0.25

0.30

0.311

1.00

2.70

0.25

0.30

0.203

1.00

2.70

0.25

0.30

0.203

1.00

2.70

0.25

0.30

0.203

1.00

2.70

0.25

0.30

0.203

1.00

4.25

0.25

0.30

0.319

1.00

2.80

0.25

0.30

0.210

1.00

3.80

0.25

0.30

0.285

1.00

3.80

0.25

0.30

0.285

1.00

4.10

0.25

0.30

0.308

1.00

2.80

0.25

0.30

0.210

1.00

3.80

0.25

0.30

0.285

1.00

3.80

0.25

0.30

0.285

1.00

4.15

0.25

0.30

0.311

1.00

2.70

0.25

0.30

0.203

1.00

2.70

0.25

0.30

0.203

1.00

2.70

0.25

0.30

0.203

1.00

2.70

0.25

0.30

0.203

1.00

1.20

0.25

0.30

0.090

1.00

2.80

0.25

0.30

0.210

1.00

2.80

0.25

0.30

0.210

1.00

4.15

0.25

0.30

0.311

1.00

2.70

0.25

0.30

0.203

1.00

2.70

0.25

0.30

0.203

1.00

2.70

0.25

0.30

0.203

1.00

2.70

0.25

0.30

0.203

1.00

1.20

0.25

0.30

0.090

1.00

3.80

0.25

0.30

0.285

1.00

3.80

0.25

0.30

0.285

1.00

2.80

0.25

0.30

0.210

1.00

2.80

0.25

0.30

0.210

1.00

2.95

0.25

0.30

0.221

1.00

3.15

0.25

0.30

0.236

1.00

3.35

0.25

0.30

0.251

1.00

2.95

0.25

0.30

0.221

1.00

0.90

0.25

0.30

0.068

1.00

1.90

0.25

0.30

0.143

1.00

3.35

0.25

0.30

0.251

1.00

2.95

0.25

0.30

0.221

1.00

3.15

0.25

0.30

0.236

1.00

3.35

0.25

0.30

0.251

1.00

2.95

0.25

0.30

0.221

1.00

1.85

0.25

0.30

0.139

TOTAL

D-D

E-E

F-F

1-1

2-2

3-3

4-4

MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO

Metrado Estructuras
18

CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA "COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO"

HOJA DE METRADOS DE ESTRUCTURAS


OBRA

: CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO
: ESTRUCTURAS

1.00

1.15

0.25

0.30

0.086

1.00

2.95

0.25

0.30

0.221

1.00

3.15

0.25

0.30

0.236

1.00

3.15

0.15

0.30

0.142

1.00

3.35

0.25

0.30

0.251

1.00

1.70

0.15

0.30

0.077

1.00

2.95

0.25

0.30

0.221

1.00

3.13

0.25

0.30

0.235

1.00

3.35

0.25

0.30

0.251

1.00

1.10

0.15

0.30

0.050

1.00

3.85

0.15

0.30

0.173

1.00

2.20

0.15

0.30

0.099

1.00

3.55

0.15

0.30

0.160

1.00

1.90

0.15

0.30

0.086

1.00

1.70

0.15

0.30

0.077

1.00

0.95

0.15

0.30

0.043

1.00

2.75

0.15

0.30

0.124

1.00

2.25

0.15

0.30

0.101

1.00

4.05

0.15

0.30

0.182

1.00

1.25

0.15

0.30

0.056

1.00

2.90

0.15

0.30

0.131

1.00

1.10

0.15

0.30

0.050

8-8

9-9

10-10
11-11

ENTRE 1-2

ENTRE 2-3

ENTRE 3-4

ENTRE 10-11

Total Concreto para Vigas de fc = 210 Kg/cm2

m3

01.04.05

COLUMNETAS DE CONFINAMIENTO

01.04.05.01

ENCOFRADO Y DESENCOFRADO P/COLUMNETAS DE CONFINAMIENTO

N PISO

DESCRIPCION

DIMENCIONES

13.22

AREA

EJE

CANT. DE
ELEMENTOS

N Lados

Largo

1-1

0.18

1.79

1.2888

0.18

2.5498

0.917928

0.18

0.8

0.576

0.18

1.9498

1.403856

0.18

2.544

2.74752

0.18

0.8

0.576

0.18

2.55

1.836

0.18

0.8

0.576

0.18

2.55

1.836

0.18

0.8

0.576

0.18

2.55

1.836

0.18

1.55

1.116

10

0.18

0.8

2.88

0.18

2.55

0.918

0.18

2.55

0.918

0.18

0.8

0.576

0.18

2.55

1.836

0.18

1.8

2.592

0.18

2.55

2.754

0.18

0.8

1.152

0.18

2.55

1.836

0.18

0.8

1.152

0.18

0.8

0.576

0.18

2.55

0.918

0.18

1.8

1.296

0.18

2.55

0.918

0.18

0.8

0.576

0.18

2.55

0.918

0.18

0.8

0.576

0.18

2.55

2.754

0.18

2.55

0.459

0.18

2.55

1.836

0.318

2.55

3.2436

0.84

2.55

2.142

0.18

2.55

2.754

0.18

0.8

0.576

0.18

2.55

1.836

0.18

0.8

0.576

0.18

2.55

1.377

0.18

0.8

0.576

0.18

2.55

0.918

Alto

PARCIAL

TOTAL

C-C

F-F

11-11

1-2

C2
2-3

MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO

Metrado Estructuras
19

CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA "COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO"

HOJA DE METRADOS DE ESTRUCTURAS


OBRA

: CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO
: ESTRUCTURAS

C3

0.23

2.55

1.173

C3

0.13

2.55

0.3315

0.18

2.55

1.836

0.79

2.55

2.0145

0.18

2.55

0.918

0.36

2.55

0.918

0.18

2.55

1.377

0.18

2.55

3.672

0.18

2.55

2.754

0.18

2.55

0.918

3-4
4-4
8-8
9-9

10-10
10-11

Total Encofrado y Desencofrado p/columnetas de confinamiento


01.04.05.02
N PISOS

m2

72.64

ACERO CORRUGADO fy=4,200 kg/cm2 GRADO 60


DESCRIPCION

EJE

CANTIDAD
ELEMENTO

N DE PIEZAS

LONGITUD
PIEZA

Kg/ml

PESO

1-1

3/8"
1/4"

1.79

0.560

4.0096

17.00

0.2

0.250

1.7

3/8"
1/4"

2.5498

0.560

2.855776

25.00

0.2

0.250

3/8"

1.25

0.8

0.560

1.792

1/4"

8.00

0.2

0.250

0.8

3/8"

1.9498

0.560

4.367552

1/4"

19.00

0.2

0.250

1.9

3/8"

2.544

0.560

5.69856

1/4"

25.00

0.2

0.250

2.5

3/8"

0.8

0.560

1.792

1/4"

8.00

0.2

0.250

0.8

3/8"

2.55

0.560

5.712

1/4"

25.00

0.2

0.250

2.5

3/8"

0.8

0.560

1.792

1/4"

8.00

0.2

0.250

0.8

3/8"

2.55

0.560

5.712

1/4"

25.00

0.2

0.250

2.5

3/8"

0.8

0.560

1.792

1/4"

8.00

0.2

0.250

0.8

3/8"

2.55

0.560

5.712

1/4"

25.00

0.2

0.250

2.5

3/8"

1.55

0.560

3.472

1/4"

15.00

0.2

0.250

1.5

3/8"

10

0.8

0.560

8.96

1/4"

10

8.00

0.2

0.250

3/8"

2.55

0.560

2.856

1/4"

25.00

0.2

0.250

1.25

3/8"

2.55

0.560

2.856

1/4"

25.00

0.2

0.250

1.25

3/8"

0.8

0.560

1.792

1/4"

8.00

0.2

0.250

0.8

3/8"

2.55

0.560

5.712

1/4"

25.00

0.2

0.250

2.5

3/8"

1.8

0.560

8.064

1/4"

18.00

0.2

0.250

3.6

3/8"

2.55

0.560

8.568

1/4"

25.00

0.2

0.250

3.75

3/8"

0.8

0.560

3.584

1/4"

8.00

0.2

0.250

1.6

MODULO 1

C-C

F-F

MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO

Metrado Estructuras
20

CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA "COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO"

HOJA DE METRADOS DE ESTRUCTURAS


OBRA

: CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO
: ESTRUCTURAS

3/8"

2.55

0.560

5.712

1/4"

25.00

0.2

0.250

2.5

3/8"

0.8

0.560

3.584

1/4"

8.00

0.2

0.250

1.6

3/8"

0.8

0.560

1.792

1/4"

8.00

0.2

0.250

0.8

3/8"

2.55

0.560

2.856

1/4"

25.00

0.2

0.250

1.25

3/8"

1.8

0.560

4.032

1/4"

18.00

0.2

0.250

1.8

3/8"

2.55

0.560

2.856

1/4"

25.00

0.2

0.250

1.25

3/8"

0.8

0.560

1.792

1/4"

8.00

0.2

0.250

0.8

3/8"

2.55

0.560

2.856

1/4"

25.00

0.2

0.250

1.25

3/8"

0.8

0.560

1.792

1/4"

8.00

0.2

0.250

0.8

3/8"

2.55

0.560

5.712

1/4"

25.00

0.2

0.250

2.5

3/8"

2.55

0.560

2.856

1/4"

25.00

0.2

0.250

1.25

3/8"

2.55

0.560

5.712

1/4"

25.00

0.2

0.250

2.5

3/8"

2.55

0.560

5.712

1/4"

25.00

0.2

0.250

2.5

3/8"

2.55

0.560

2.856

1/4"

25.00

0.72

0.250

4.5

3/8"

2.55

0.560

8.568

1/4"

25.00

0.2

0.250

3.75

3/8"

0.8

0.560

1.792

1/4"

8.00

0.2

0.250

0.8

3/8"

2.55

0.560

5.712

1/4"

25.00

0.2

0.250

2.5

3/8"

0.8

0.560

1.792

1/4"

8.00

0.2

0.250

0.8

3/8"

2.55

0.560

2.856

1/4"

25.00

0.2

0.250

1.25

3/8"

0.8

0.560

1.792

1/4"

8.00

0.2

0.250

0.8

3/8"

2.55

0.560

2.856

1/4"

25.00

0.2

0.250

1.25

3/8"

2.55

0.560

2.856

1/4"

25.00

0.92

0.250

5.75

3/8"

2.55

0.560

2.856

1/4"

25.00

0.92

0.250

5.75

3/8"

2.55

0.560

5.712

1/4"

25.00

0.2

0.250

2.5

3/8"

2.55

0.560

2.856

1/4"

25.00

0.72

0.250

4.5

3/8"

2.55

0.560

2.856

1/4"

25.00

0.2

0.250

1.25

3/8"

2.55

0.560

2.856

1/4"

25.00

0.2

0.250

1.25

11-11

1-2

C2

2-3

C3

C3

3-4

4-4
C2

8-8

9-9

MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO

Metrado Estructuras
21

CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA "COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO"

HOJA DE METRADOS DE ESTRUCTURAS


OBRA

: CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO
: ESTRUCTURAS

3/8"

2.55

0.560

2.856

1/4"

25.00

0.2

0.250

1.25

3/8"

2.55

0.560

11.424

1/4"

25.00

0.2

0.250

3/8"

2.55

0.560

5.712

1/4"

25.00

0.2

0.250

2.5

3/8"

2.55

0.560

2.856

1/4"

25.00

0.2

0.250

1.25

kg

311.18

10-10

10-11

Total ACERO CORRUGADO FY= 4200 KG/CM2 GRADO 60


01.04.05.03
N PISO

CONCRETO fc = 210 Kg/cm2


DESCRIPCION

DIMENCIONES

VOLUMEN

EJE

CANT. DE
ELEMENTOS

Largo

Ancho

Alto

PARCIAL

1-1

0.18

0.13

1.79

0.08

0.18

0.13

2.55

0.06

0.18

0.13

0.80

0.04

0.18

0.13

1.95

0.09

0.18

0.13

2.54

0.12

0.18

0.13

0.80

0.04

0.18

0.13

2.55

0.12

0.18

0.13

0.80

0.04

0.18

0.13

2.55

0.12

0.18

0.13

0.80

0.04

0.18

0.13

2.55

0.12

0.18

0.13

1.55

0.07

10

0.18

0.13

0.80

0.19

0.18

0.13

2.55

0.06

0.18

0.13

2.55

0.06

0.18

0.13

0.80

0.04

0.18

0.13

2.55

0.12

0.18

0.13

1.80

0.17

0.18

0.13

2.55

0.18

0.18

0.13

0.80

0.07

0.18

0.13

2.55

0.12

0.18

0.13

0.80

0.07

C-C

TOTAL

0.00

F-F

0.00

0.00
0.00

11-11
2

0.18

0.13

0.80

0.04

0.18

0.13

2.55

0.06

0.18

0.13

1.80

0.08

0.18

0.13

2.55

0.06

0.18

0.13

0.80

0.04

0.18

0.13

2.55

0.06

0.18

0.13

0.80

0.04

0.18

0.13

2.55

0.12

0.18

0.13

2.55

0.06

0.18

0.13

2.55

0.12

0.18

0.13

2.55

0.12

0.33

0.13

2.55

0.00

1-2

C2

0.11
0.00

2-3
3

0.18

0.13

2.55

0.18

0.18

0.13

0.80

0.04

0.18

0.13

2.55

0.12

0.18

0.13

0.80

0.04

0.18

0.13

2.55

0.06

0.18

0.13

0.80

0.04

0.18

0.13

2.55

0.06

C3

0.23

0.13

2.55

0.08

C3

0.23

0.13

2.55

0.08

0.18

0.13

2.55

0.33

0.13

2.55

0.00

3-4

C2

0.11
0.00

8-8
1

0.18

0.13

2.55

0.18

0.13

2.55

0.06
0.06

0.18

0.13

2.55

0.06

0.18

0.13

2.55

0.24

0.18

0.13

2.55

0.18

0.13

2.55

0.00

9-9

10-10

0.00
0.12
0.00

10-11

MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO

0.12
0.00

4-4

0.06

Metrado Estructuras
22

CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA "COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO"

HOJA DE METRADOS DE ESTRUCTURAS


OBRA

: CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO
: ESTRUCTURAS

Total Concreto para Vigas de fc = 210 Kg/cm2


01.04.06

VIGUETAS DE CONFINAMIENTO

01.04.06.01

ENCOFRADO Y DESENCOFRADO NORMAL

N PISO

DESCRIPCION

m3

DIMENCIONES

AREA

CANT. DE
ELEMENTOS

N Lados

Largo

Alto

PARCIAL

6.033

0.2

2.4132

6.037

0.2

2.4148

VCT2

3.147

0.18

1.13292

VCF

1.097

0.15

0.3291

1.9

0.15

0.57

0.15

0.3

1.2

0.15

0.36

6.033

0.2

2.4132

6.037

0.2

2.4148

VCT2

3.147

0.18

1.13292

VCF

2.2

0.15

0.66

2.2

0.15

0.66

1.1

0.15

0.33

1.7

0.15

0.51

1.5

0.15

0.45

1.5

0.15

0.45

2.7

0.15

0.81

2.7

0.15

0.81

2.8

0.15

0.84

2.8

0.15

0.84

4.45

0.2

1.78

2.1

0.15

0.63

2.7

0.15

4.05

1.79

0.15

0.537

1.87

0.15

0.561

1.88

0.15

0.564

6.04

0.2

2.416

1.88

0.2

0.752

3.42

0.18

1.2312

6.04

0.2

2.416

1.88

0.2

0.752

3.42

0.18

1.2312

4.45

0.2

1.78

EJE

4.42

TOTAL

VCF
1-1
VCT1

11-11
VCT1

F-F
VCF

3-3
VCT 1
C-C
VCF

4-4
VCT 1
VCT 2
8-8
VCT 1
VCT 2
9-9
VCT 1
Total Encofrado y Desencofrado normal
01.04.06.02
N PISOS

m2

38.54

ACERO CORRUGADO P/VIGAS DE CONFINAMIENTO FY=4200 KG/CM2 GRADO 60


DESCRIPCION

EJE

CANTIDAD
ELEMENTO

N DE PIEZAS

LONGITUD
PIEZA

Kg/ml

PESO

1/2"

6.333

0.994

12.59

1/2"

6.333

0.994

12.59

3/8"

34

0.8

0.560

15.23

1/2"

6.337

0.994

12.60

1/2"

6.337

0.994

12.60

3/8"

34

0.8

0.560

15.23

3/8"

3.447

0.560

7.72

1/4"

19

0.62

0.250

2.95

3/8"

1.397

0.560

1.56

1/4"

11

0.66

0.250

1.82

3/8"

2.2

0.560

2.46

1/4"

19

0.66

0.250

3.14

3/8"

1.3

0.560

1.46

1/4"

10

0.66

0.250

1.65

3/8"

1.5

0.560

1.68

1/4"

12

0.66

0.250

1.98

1/2"

6.333

0.994

12.59

1/2"

6.333

0.994

12.59

3/8"

34

0.8

0.560

15.23

1/2"

6.337

0.994

12.60

1/2"

6.337

0.994

12.60

3/8"

34

0.8

0.560

15.23

3/8"

3.15

0.560

7.06

1/4"

19

0.62

0.250

2.95

3/8"

2.5

0.560

2.80

1/4"

22

0.66

0.250

3.63

3/8"

2.5

0.560

2.80

1/4"

22

0.66

0.250

3.63

MODULO 1
1-1
VCT1

VCT2
VCF

11-11
VCT1

VCT2
VCF

MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO

Metrado Estructuras
23

CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA "COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO"

HOJA DE METRADOS DE ESTRUCTURAS


OBRA

: CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO
: ESTRUCTURAS

3/8"

1.4

0.560

1.57

1/4"

0.66

0.250

0.99

3/8"

0.560

3.36

1/4"

17

0.66

0.250

2.81

3/8"

1.8

0.560

2.02

1/4"

15

0.56

0.250

2.10

3/8"

1.8

0.560

2.02

1/4"

15

0.56

0.250

2.10

3/8"

0.560

3.36

1/4"

27

0.56

0.250

3.78

3/8"

0.560

3.36

1/4"

27

0.56

0.250

3.78

3/8"

3.1

0.560

3.47

1/4"

28

0.56

0.250

3.92

3/8"

3.1

0.560

3.47

1/4"

28

0.56

0.250

3.92

1/2"

4.75

0.994

9.44

1/2"

4.75

0.994

9.44

3/8"

25

0.8

0.560

11.20

3/8"

2.4

0.560

2.69

1/4"

23

0.56

0.250

3.22

3/8"

0.560

16.80

1/4"

30

0.56

0.250

21.00

3/8"

2.09

0.560

2.34

1/4"

0.56

0.250

0.98

3/8"

2.17

0.560

2.43

1/4"

0.56

0.250

1.12

3/8"

2.18

0.560

2.44

1/4"

19

0.56

0.250

2.66

1/2"

6.34

0.994

12.60

1/2"

6.34

0.994

12.60

3/8"

34

0.8

0.560

15.23

1/2"

2.18

0.994

4.33

1/2"

2.18

0.994

4.33

3/8"

11

0.8

0.560

4.93

3/8"

3.72

0.560

8.33

1/4"

17

0.66

0.250

2.81

1/2"

6.34

0.994

12.60

1/2"

6.34

0.994

12.60

3/8"

34

0.8

0.560

15.23

1/2"

2.18

0.994

4.33

1/2"

2.18

0.994

4.33

3/8"

11

0.8

0.560

4.93

3/8"

3.72

0.560

8.33

1/4"

17

0.66

0.250

2.81

1/2"

4.75

0.994

9.44

1/2"

4.75

0.994

9.44

3/8"

25

0.8

0.560

11.20

kg

503.17

F-F
VCF

3-3
VCT 1

C-C
VCF

4-4
VCT 1

VCT 2
8-8
VCT 1

VCT 2
9-9
VCT 1

Total acero corrugado f= 4200 kg/cm2


01.04.06.03
N PISO

CONCRETO fc = 210 Kg/cm2


DESCRIPCION

DIMENCIONES

VOLUMEN

CANT. DE
ELEMENTOS

Largo

Ancho

Alto

PARCIAL

0.2

0.2

6.03

0.24

0.2

0.2

6.04

0.24

VCT2

0.2

0.13

3.15

0.08

VCF

0.13

0.15

1.10

0.02

0.13

0.15

1.90

0.04

0.13

0.15

1.00

0.02

0.13

0.15

1.20

0.02

0.2

0.2

6.03

0.24

0.2

0.2

6.04

0.24

VCT2

0.2

0.13

3.15

0.08

VCF

0.13

0.15

2.20

0.04

0.13

0.15

2.20

0.04

0.13

0.15

1.10

0.02

0.13

0.15

1.70

0.03

0.13

0.15

1.50

0.03

0.13

0.15

1.50

0.03

0.13

0.15

2.70

0.05

0.13

0.15

2.70

0.05

0.13

0.15

2.80

0.05

0.13

0.15

2.80

0.05

EJE

TOTAL

1-1
VCT1

11-11
VCT1

F-F
VCF

3-3

MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO

Metrado Estructuras
24

CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA "COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO"

HOJA DE METRADOS DE ESTRUCTURAS


OBRA

: CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO
: ESTRUCTURAS

VCT 1

0.2

0.2

4.45

0.18

0.13

0.15

2.10

0.04

0.13

0.15

2.70

0.26

0.13

0.15

1.79

0.03

0.13

0.15

1.87

0.04

0.13

0.15

1.88

0.04

0.2

0.2

6.04

0.24

0.2

0.2

1.88

0.08

0.2

0.13

3.42

0.09

0.2

0.2

6.04

0.24

0.2

0.2

1.88

0.08

0.2

0.13

3.42

0.09

0.2

0.2

4.45

0.18

C-C
VCF

4-4
VCT 1
VCT 2
8-8
VCT 1
VCT 2
9-9
VCT 1

Total Concreto para Vigas de fc = 210 Kg/cm2


01.04.07

MUROS DE CONCRETO PARA DIVISIONES

01.04.07.01

ENCOFRADO Y DESENCOFRADO NORMAL

N PISO

DESCRIPCION

EJE

m3

DIMENCIONES

CANT. DE
ELEMENTOS

N Lados

Largo

AREA
Alto

PARCIAL

1-2

0.85

2.05

3.49

2-3

0.55

2.05

2.26

0.95

2.05

3.90

0.55

2.05

2.26

Total Encofrado y Desencofrado normal

01.04.07.02
N PISOS

DESCRIPCION

CANTIDAD
ELEMENTO

LONGITUD
PIEZA

PESO

3/8"

0.85

0.560

4.28

3/8"

2.45

0.560

5.49

3/8"

0.55

0.560

2.46

3/8"

2.45

0.560

4.12

3/8"

0.95

0.560

4.26

3/8"

2.45

0.560

5.49

3/8"

0.55

0.560

2.46

3/8"

2.45

0.560

4.12

kg

32.68

N DE PIEZAS

CONCRETO fc = 210 Kg/cm2


DESCRIPCION

EJE

DIMENCIONES

CANT. DE
ELEMENTOS

Largo

Ancho

VOLUMEN
Alto

PARCIAL

1-2

0.85

0.1

2.05

2-3

0.55

0.1

2.05

0.11

0.95

0.1

2.05

0.19

0.55

0.1

2.05

0.11

COLUMNAS CIRCULARES CON ENCOFRADO PERDIDO

01.04.08.01

ENCOFRADO Y DESENCOFRADO PERDIDO


DESCRIPCION

EJE

DIMENCIONES

CANT. DE
ELEMENTOS

N Lados

0.79

Largo

TOTAL

0.17

m3

C4

0.59

AREA
Alto

PARCIAL

4.04

19.04

Total Encofrado y Desencofrado perdido

N PISOS

Kg/ml

1-2

01.04.08

01.04.03.02

11.89

Total Concreto para Vigas de fc = 210 Kg/cm2

N PISO

m2

EJE

Total acero corrugado f= 4200 kg/cm2

N PISO

TOTAL

ACERO CORRUGADO P/VIGAS DE CONFINAMIENTO FY=4200 KG/CM2 GRADO 60

2-3

01.04.07.03

3.22

TOTAL

m2

19.04

ACERO CORRUGADO fy=4,200 kg/cm2 GRADO 60


DESCRIPCION

EJE

C4

Total acero corrugado f= 4200 kg/cm2

MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO

CANTIDAD
ELEMENTO

N DE PIEZAS

LONGITUD
PIEZA

Kg/ml

PESO

1/2"
3/8"

6.00

8.00

4.69

0.994

223.77

6.00

46.00

0.79

0.560

121.39

kg

345.16

Metrado Estructuras
25

CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA "COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO"

HOJA DE METRADOS DE ESTRUCTURAS


OBRA

: CREACION DEL CENTRO DE SERVICIOS - TAMBOS EN LA COMUNIDAD NATIVA KIRIGUETI, DISTRITO ECHARATE, PROVINCIA LA CONVENCIN,
DEPARTAMENTO CUSCO
: ESTRUCTURAS

01.04.03.03

CONCRETO fc = 210 Kg/cm2

N PISO

DESCRIPCION

EJE

DIMENCIONES

VOLUMEN

CANT. DE
ELEMENTOS

Largo

Ancho

Alto

PARCIAL

0.0491

4.04

1.19

C4
Total Concreto para Vigas de fc = 210 Kg/cm2
01.04.09

MESAS DE CONCRETO PARA SS.HH Y COCINA

01.04.09.01

ENCOFRADO Y DESENCOFRADO NORMAL

N PISO

DESCRIPCION

EJE

m3

DIMENCIONES

TOTAL

1.19

AREA

CANT. DE
ELEMENTOS

Largo

Ancho

Alto

PARCIAL

1
1
1
1

0.75
0.75
0.75
0.75

1.00
1.00
1.20
1.15

0.10
0.10
0.10
0.10

1.10
1.10
1.29
1.24

1
1
4

1.70
0.65
0.70

0.60
0.60
0.60

0.10
0.10
0.10

1.94
0.89
3.64

TOTAL

SS.HH
SS.HH. D
SS.HH. V
SS.HH. VARONES
SS.HH. DAMAS
COCINA
TABLERO IZQUIERDO
TABLERO DERECHO

Total Encofrado y Desencofrado


01.04.09.02

11.20

ACERO CORRUGADO Fy=4,200kg/cm2 GRADO 60

N PISOS

DESCRIPCION

EJE

COCINA

SS.HH

CANTIDAD
ELEMENTO

N DE PIEZAS

LONGITUD
PIEZA

Kg/ml

PESO

3/8"

4.00

2.00

1.80

0.560

8.06

3/8"

4.00

1.00

1.31

0.560

2.93

3/8"

1.00

22.00

0.55

0.560

6.78

3/8"

4.00

2.00

1.27

0.560

5.69

3/8"

1.00

14.00

0.55

0.560

4.31

3/8"

2.00

3.00

0.75

0.560

2.52

3/8"

1.00

3.00

1.15

0.560

1.93

3/8"

1.00

3.00

1.10

0.560

1.85

3/8"

2.00

5.00

0.55

0.560

3.08

3/8"

2.00

6.00

0.55

0.560

3.70

kg

40.85

Total acero corrugado f= 4200 kg/cm2


01.04.09.03

m2

CONCRETO fc = 210 Kg/cm2

N PISO

DESCRIPCION

EJE

DIMENCIONES

VOLUMEN

CANT. DE
ELEMENTOS

Largo

Ancho

Alto

PARCIAL

1
1
1
1

0.75
0.75
0.75
0.75

1.00
1.00
1.20
1.15

0.10
0.10
0.10
0.10

0.08
0.08
0.09
0.09

2
2
2
4

1.7
-0.45
0.65
0.70

0.60
0.40
0.60
0.60

0.10
0.10
0.10
0.10

0.20
-0.04
0.08
0.17

TOTAL

SS.HH
SS.HH. D
SS.HH. V
SS.HH. VARONES
SS.HH. DAMAS
COCINA
TABLERO IZQUIERDO
TABLERO DERECHO

Total Concreto para Vigas de fc = 210 Kg/cm2

MINISTERIO DE VIVIENDA, CONSTRUCCION Y SANEAMIENTO

m3

0.74

Metrado Estructuras
26

RESUMEN HOJA DE METRADOS ESTRUCTURAS


OBRA

: CREACION DEL CENTRO DE SERVICIOS - TAMBO EN LA COMUNIDAD NATIVA KIRIGUETI, DISTRITO DE ECHARATE, PROV
CONVENCION, DEPARTAMENTO DE CUSCO

PART.
01.01

DESCRIPCION
TRABAJOS PRELIMINARES

01.01.01

CARTEL DE OBRA 3.60X2.40M

01.01.02

CAMPAMENTO PROVISIONAL (ALMACEN, OFICINA, DORMITORIO Y COMEDOR DE OBRA)

01.01.03

COBERTURA Y DRENAJES PROVISIONALES PARA TRABAJOS EN LLUVIA

01.01.04

TRANSPORTE DE MATERIALES Y EQUIPAMIENTO A OBRA

01.01.05

AGUA PARA LA CONSTRUCCION

01.01.06

LIMPIEZA Y DESBROCE MANUAL DEL TERRENO

01.01.07

TRAZO, NIVELES Y REPLANTEO PRELIMINAR

01.01.08
01.02

REPLANTEO DURANTE EL PROCESO


MOVIMIENTO DE TIERRAS

01.02.01

CORTE, NIVELACION MANUAL HASTA ALCANZAR TERRENO COMPETENTE

01.02.02

EXCAVACION MANUAL PARA ESTRUCTURAS

01.02.03

REFINE Y COMPACTACION DE NIVELES DE FONDO

01.02.04

RELLENO COMPACTADO CON MATERIAL PROPIO Y EQUIPO MENOR

01.02.05

BASE GRANULAR COMPACTADO DESDE NIVELES DE FONDO HASTA FALSO PISO

01.02.06
01.03
01.03.01
01.03.01.01
01.03.02

ELIMINACION DE MATERIAL EXCEDENTE D=50M


CONCRETO SIMPLE
SOLADOS
SOLADO C/MEZCLA 1:8 C:H E=4"
CIMIENTOS CORRIDOS

01.03.02.01

CONCRETO P/CIMIENTO CORRIDO 1:8 C:H + 30% P.G MAX. 6"

01.03.02.02

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 PARA DOWELLS

01.03.03
01.03.03.01
01.03.03.02
01.03.04
01.03.04.01
01.03.05
01.03.05.01
01.03.05.02
01.03.06

SOBRECIMIENTOS
ENCOFRADO Y DESENCOFRADO P/CIMIENTO
CONCRETO P/SOBRECIMIENTO 1:8 C:H + 25% P.M MAX. 3"
FALSO PISO
CONCRETO P/FALSO PISO e=4" 1:6 C:H
SARDINELES EN SS.HH
ENCOFRADO Y DESENCOFRADO P/SARDINEL
CONCRETO f'c=210kg/cm2
VEREDAS Y RAMPAS

01.03.06.01

ENCOFRADO Y DESENCOFRADO P/VEREDAS

01.03.06.02

CONCRETO f'c=175kg/cm2

01.03.06.03

JUNTA ASFALTICA DE DILATACION Y CONTRACCION 1/2" P/VEREDAS

01.03.06.04
01.04
01.04.01

BRUAS DE 1CM x 1 CM
OBRAS DE CONCRETO ARMADO
ZAPATAS

01.04.01.01

ENTIBADO DE ZAPATAS

01.04.01.02

ACERO CORRUGADO Fy=4,200kg/cm2 GRADO 60

01.04.01.03
01.04.02

CONCRETO f'c=210kg/cm2
VIGAS DE CIMENTACION

01.04.02.01

ENCOFRADO Y DESENCOFRADO NORMAL VIGAS DE CIMENTACION

01.04.02.02

ACERO CORRUGADO Fy=4,200kg/cm2 GRADO 60

01.04.02.03

CONCRETO f'c=210kg/cm2

01.04.03

COLUMNAS

01.04.03.01

ENCOFRADO Y DESENCOFRADO DE ESTRUCTURA CARAVISTA COLUMNAS

01.04.03.02

ACERO CORRUGADO Fy=4,200kg/cm2 GRADO 60

01.04.03.03
01.04.04
01.04.04.01

CONCRETO f'c=210kg/cm2
VIGAS
ENCOFRADO Y DESENCOFRADO DE ESTRUCTURA CARAVISTA VIGAS

01.04.04.02

ACERO CORRUGADO Fy=4,200kg/cm2 GRADO 60

01.04.04.03

CONCRETO f'c=210kg/cm2

01.04.05

COLUMNETAS DE CONFINAMIENTO

01.04.05.01

ENCOFRADO Y DESENCOFRADO NORMAL

01.04.05.02

ACERO CORRUGADO Fy=4,200kg/cm2 GRADO 60

01.04.05.03
01.04.06

CONCRETO f'c=210kg/cm2
VIGUETAS DE CONFINAMIENTO

01.04.06.01

ENCOFRADO Y DESENCOFRADO NORMAL

01.04.06.02

ACERO CORRUGADO Fy=4,200kg/cm2 GRADO 60

01.04.06.03
01.04.07

CONCRETO f'c=210kg/cm2
MUROS DE CONCRETO PARA DIVISIONES

01.04.07.01

ENCOFRADO Y DESENCOFRADO NORMAL

01.04.07.02

ACERO CORRUGADO Fy=4,200kg/cm2 GRADO 60

01.04.07.03
01.04.08

CONCRETO f'c=210kg/cm2
COLUMNAS CIRCULARES CON ENCOFRADO PERDIDO

01.04.08.01

ENCOFRADO Y DESENCOFRADO PERDIDO

01.04.08.02

ACERO CORRUGADO Fy=4,200kg/cm2 GRADO 60

01.04.08.03

CONCRETO f'c=210kg/cm2

01.04.09

MESAS DE CONCRETO PARA SS.HH Y COCINA

01.04.09.01

ENCOFRADO Y DESENCOFRADO NORMAL

01.04.09.02

ACERO CORRUGADO Fy=4,200kg/cm2 GRADO 60

01.04.09.03

CONCRETO f'c=210kg/cm2

TI, DISTRITO DE ECHARATE, PROVINCIA LA

UND

CANT

und

1.00

und

1.00

glb

1.00

glb

1.00

glb

1.00

m2

800.00

m2

800.00

m2

800.00

m3

156.66

m3

102.01

m2

351.27

m3

28.40

m2

393.25

m3

92.01

m2

42.66

m3

33.95

kg

93.20

m2

118.36

m3

8.88

m2

244.50

m2

1.93

m3

0.05

m2

27.92

m3

18.38

43.90

341.66

m2

168.64

kg

378.42

m3

16.72

m2

246.68

kg

753.95

m3

12.94

m2
kg

150.22
1,748.65

m3

10.51

m2

113.72

kg
m3

1,427.14
13.22

m2

72.64

kg

311.18

m3

4.42

m2

38.54

kg

503.17

m3

3.22

m2

11.89

kg

32.68

m3

0.59

m2

19.04

kg

345.16

m3

1.19

m2

11.20

kg

40.85

m3

0.74

ANALISIS DE PRECIOS UNITARIOS

OBRA

: CREACION DEL CENTRO DE SERVICIOS TAMBO"

ESPECIALIDAD

: ESTRUCTURAS

Partida
Rendimiento

01.01.01
CARTEL DE OBRA 3.60 X 2.40 M
15.00 Und/DIA
Jornada:
Descripcin Insumo
Mano de Obra
CAPATAZ
PEON
Materiales
CLAVOS PARA MADERA 2"
MADERA TORNILLO
Equipos
HERRAMIENTAS MANUALES
WINCHA DE 5 MTRS.

Partida
Rendimiento

HH
HH

Cuadrilla

Cantidad

0.100
2.000

0.0533
1.0667

KG
P2

0.7500
2.2000

%MO
PZA

3.0000
0.0150

TRAZO, NIVELES Y REPLANTEO PRELIMINAR


200.00 M2/DIA
Jornada:
8.000 horas/dia

01.01.02

Descripcin Insumo
Mano de Obra
TOPOGRAFO
CAPATAZ
OPERARIO
PEON

Partida
Rendimiento

Unidad

8.000 horas/dia

Unidad
HH
HH
HH
HH

Cuadrilla

Cantidad

1.000
0.100
1.000
1.000

0.0400
0.0040
0.0400
0.0400

Materiales
YESO (BLS 25KG)
CLAVOS PARA MADERA 2"
MADERA TORNILLO

BLS
KG
P2

0.0300
0.0050
0.0190

Equipos
HERRAMIENTAS MANUALES
WINCHA DE 5 MTRS.
MIRAS Y JALONES
WINCHA DE 50 MTRS.
TEODOLTO
NIVEL TOPOGRFICO

%MO
PZA
HM
PZA
HM
HM

3.0000
0.0015
0.0400
0.0015
0.0400
0.0200

1.000
1.000
0.500

01.01.03
REPLANTEO DURANTE EL PROCESO
400.00 M2/DIA
Jornada:
8.000 horas/dia
Descripcin Insumo

Unidad

Cuadrilla

Cantidad

Mano de Obra
CAPATAZ
PEON
Equipos
HERRAMIENTAS MANUALES

Partida
Rendimiento

Equipos
HERRAMIENTAS MANUALES
WINCHA DE 50 MTRS.
NIVEL TOPOGRAFICO

Equipos
HERRAMIENTAS MANUALES
WINCHA DE 5MTRS.

%MO

3.0000

Unidad
HH
HH
HH

%MO
PZA
HM

Cuadrilla

Cantidad

0.100
1.000
1.000

0.0040
0.0400
0.0400

0.500

3.0000
0.0015
0.0200

Unidad
HH
HH

Cuadrilla

Cantidad

0.100
3.000

0.0400
1.2000

%MO
PZA

3.0000
0.0015

01.02.03
REFINE Y COMPACTACION DE NIVELES DE FONDO
400.00 M2/DIA
Jornada:
8.000 horas/dia
Descripcin Insumo
Mano de Obra
CAPATAZ
PEON
Equipos
HERRAMIENTAS MANUALES

Partida
Rendimiento

0.0020
0.0200

01.02.02
EXCAVACION MANUAL PARA ESTRUCTURAS
20.00 M3/DIA
Jornada:
8.000 horas/dia
Descripcin Insumo
Mano de Obra
CAPATAZ
PEON

Partida
Rendimiento

0.100
1.000

01.02.01
CORTE, NIVELACION MANUAL HASTA ALCANZAR TERRENO COMPETENTE
200.00 M3/DIA
Jornada:
8.000 horas/dia
Descripcin Insumo
Mano de Obra
CAPATAZ
PEON
TOPOGRAFO

Partida
Rendimiento

HH
HH

Unidad
HH
HH

Cuadrilla

Cantidad

0.100
1.000

0.0020
0.0200

%MO

3.0000

'01.02.04
RELLENO COMPACTADO CON MATERIAL PROPIO Y EQUIPO MENOR
150.00 M2/DIA
Jornada:
8.000 horas/dia
Descripcin Insumo

Unidad

Cuadrilla

Cantidad

Mano de Obra
CAPATAZ
PEON
OPERARIO
Equipos
HERRAMIENTAS MANUALES

Partida
Rendimiento

0.100
1.000
1.000

0.0053
0.0533
0.0533

%MO

3.0000

BASE GRANULAR COMPACTADO DESDE NIVELES DE FONDO HASTA FALSO PISO


300.00 M2/DIA
Jornada:
8.000 horas/dia

01.02.05

Descripcin Insumo
Mano de Obra
CAPATAZ
PEON
Equipos
HERRAMIENTAS MANUALES

Partida
Rendimiento

HH
HH
HH

Unidad
HH
HH

Cuadrilla

Cantidad

0.100
1.000

0.0027
0.0267

%MO

3.0000

ELIMINACION DE MATERIAL EXCEDENTE


6.00 M3/DIA
Jornada:
8.000 horas/dia

01.02.06

Descripcin Insumo
Mano de Obra
CAPATAZ
PEON
Equipos
HERRAMIENTAS MANUALES

Unidad
HH
HH

Cuadrilla

Cantidad

0.100
4.000

0.1333
5.3333

%MO

3.0000

CONCRETO SIMPLE
Partida
Rendimiento

SOLADOS C/MEZCLA 1:8 C:H E=4"


80.00 M2/DIA
Jornada:

01.03.01.01

Descripcin Insumo
Mano de Obra
CAPATAZ
OPERARIO
OFICIAL
PEON

Unidad
HH
HH
HH
HH

8.000 horas/dia
Cuadrilla

Cantidad

0.200
2.000
1.000
6.000

0.0200
0.2000
0.1000
0.6000

Materiales
PIEDRA GRANDE DE 8"
CEMENTO PORTLAND TIPO I
HORMIGON
AGUA

M3
BLS
M3
M3

0.5000
2.5500
0.8700
0.1685

Equipos
HERRAMIENTAS MANUALES
WINCHA DE 5 MTRS.

%MO
PZA

3.0000
0.0015

MEZCLADORA DE CONCRETO 9-

Partida
Rendimiento

01.03.02.01 CIMIENTOS CORRIDOS


25.00 M3/DIA
Jornada:
Descripcin Insumo
Mano de Obra
OPERADOR DE EQUIPO LIVIAN
CAPATAZ
OPERARIO
OFICIAL
PEON

Partida
Rendimiento

Unidad
HH
HH
HH
HH
HH

Materiales
PIEDRA GRANDE DE 8"
CEMENTO PORTLAND TIPO I
HORMIGON
AGUA

M3
BLS
M3
M3

Equipos
HERRAMIENTAS MANUALES
MEZCLADORA DE CONCRETO 9-

%MO
HM

1.000

0.3200

8.000 horas/dia
Cuadrilla

Cantidad

1.000
0.100
1.000
2.000
8.000

0.3200
0.0320
0.3200
0.6400
2.5600

0.5000
3.0500
0.8700
0.1685

1.000

3.0000
0.3200

01.03.02.02 ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 PARA DOWELLS


200.00 KG/DIA
Jornada:
8.000 horas/dia
Descripcin Insumo
Mano de Obra
CAPATAZ
OPERARIO
OFICIAL
Materiales
ALAMBRE NEGRO RECOCIDO #
FIERRO FY=4200 KG/CM2
Equipos
HERRAMIENTAS MANUALES

Partida
Rendimiento

HM

Unidad
HH
HH
HH

Cuadrilla

Cantidad

0.100
2.000
2.000

0.0040
0.0800
0.0800

KG
KG

0.0600
1.0700

%MO

3.0000

01.03.03.01 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTO


14.00 M2/DIA
Jornada:
8.000 horas/dia
Descripcin Insumo
Mano de Obra
CAPATAZ
OPERARIO
OFICIAL
PEON
Materiales
ALAMBRE NEGRO RECOCIDO #
CLAVOS PARA MADERA 2 1/2"
CLAVOS PARA MADERA 4"

Unidad
HH
HH
HH
HH

KG
KG
KG

Cuadrilla

Cantidad

0.100
1.000
2.000
1.000

0.0571
0.5714
1.1429
0.5714

0.2600
0.0910
0.0390

MADERA TORNILLO I/CORTE P


Equipos
HERRAMIENTAS MANUALES

Partida
Rendimiento

%MO

3.0000

Unidad
HH
HH
HH
HH

Materiales
PIEDRA MEDIANA DE 6"
CEMENTO PORTLAND TIPO I
HORMIGON
AGUA

M3
BLS
M3
M3

Equipos
HERRAMIENTAS MANUALES
MEZCLADORA DE CONCRETO 9-

%MO
HM

Cuadrilla

Cantidad

0.200
2.000
2.000
8.500

0.1333
1.3333
1.3333
5.6667

0.4200
3.8900
0.8100
0.1600

3.0000
0.6667

1.000

01.03.04.01 CONCRETO P/FALSO PISO e=4" 1:6 C:H


200.00 M2/DIA
Jornada:
8.000 horas/dia
Descripcin Insumo
Mano de Obra
CAPATAZ
OPERARIO
OFICIAL
PEON

Partida
Rendimiento

4.0250

01.03.03.02 CONCRETO P/SOBRECIMIENTO 1:8 C:H + 25% P.M MAX. 3"


12.00 M3/DIA
Jornada:
8.000 horas/dia
Descripcin Insumo
Mano de Obra
CAPATAZ
OPERARIO
OFICIAL
PEON

Partida
Rendimiento

P2

Unidad
HH
HH
HH
HH

Cuadrilla

Cantidad

0.200
2.000
1.000
6.000

0.0080
0.0800
0.0400
0.2400

Materiales
CEMENTO PORTLAND TIPO I
HORMIGON
AGUA

BLS
M3
M3

3.8900
0.6500
0.1600

Equipos
HERRAMIENTAS MANUALES
MEZCLADORA DE CONCRETO 9-

%MO
HM

3.0000
0.0400

1.000

ENCOFRADO Y DESENCOFRADO P/SARDINEL


14.00 M2/DIA
Jornada:
8.000 horas/dia

01.03.05.01

Descripcin Insumo
Mano de Obra
CAPATAZ
OPERARIO
OFICIAL
PEON

Unidad
HH
HH
HH
HH

Cuadrilla

Cantidad

0.100
1.000
1.000
2.000

0.0571
0.5714
0.5714
1.1429

Partida
Rendimiento

Materiales
ALAMBRE NEGRO #8
CLAVOS DIFERENTES MEDIDAS
DESMOLDANTE PARA MADERA
TRIPLAY DE 19mm
MADERA TORNILLO

KG
KG
GAL
Pl
Pl

0.2000
0.2000
0.0500
0.0400
3.8500

Equipos
HERRAMIENTAS MANUALES

%MO

3.0000

CONCRETO f'c=175kg/cm2
20.00 M3/DIA
Jornada:

01.03.05.02

Descripcin Insumo
Mano de Obra
CAPATAZ
OPERARIO
OFICIAL
PEON

Partida
Rendimiento

Unidad
HH
HH
HH
HH

Materiales
CEMENTO PORTLAND TIPO I
HORMIGON
AGUA

BLS
M3
M3

Equipos
VIBRADOR DE CONCRETO
MEZCLADORA DE CONCRETO
HERRAMIENTAS MANUALES

HM
HM
%MO

8.000 horas/dia
Cuadrilla

Cantidad

0.100
1.000
2.000
8.000

0.0400
0.4000
0.8000
3.2000

8.5000
1.2700
0.1000

1.000
1.000

0.4000
0.4000
3.0000

ENCOFRADO Y DESENCOFRADO P/VEREDAS


10.00 M2/DIA
Jornada:
8.000 horas/dia

01.03.06.01

Descripcin Insumo
Mano de Obra
CAPATAZ
OPERARIO
PEON
Materiales
ALAMBRE NEGRO #16
CLAVOS DIFERENTES MEDIDAS
DESMOLDANTE PARA MADERA
MADERA TORNILLO

Unidad
HH
HH
HH

KG
KG
GAL
Pl

Cuadrilla

Cantidad

0.100
1.000
1.000

0.0800
0.8000
0.8000

0.2000
0.2000
0.0500
3.8500

Equipos
HERRAMIENTAS MANUALES

Partida
Rendimiento

CONCRETO f'c=175kg/cm2
20.00 M3/DIA
Jornada:
Unidad
HH
HH
HH
HH

Materiales
CEMENTO PORTLAND TIPO I
HORMIGON
AGUA

BLS
M3
M3

Equipos
VIBRADOR DE CONCRETO
MEZCLADORA DE CONCRETO
HERRAMIENTAS MANUALES

HM
HM
%MO

8.000 horas/dia
Cuadrilla

Cantidad

0.100
1.000
2.000
8.000

0.0400
0.4000
0.8000
3.2000

8.5000
1.2700
0.1000

1.000
1.000

0.4000
0.4000
3.0000

JUNTA ASFALTICA DE DILATACION Y CONTRACCION 1/2" P/VEREDAS


60.00 M/DIA
Jornada:
8.000 horas/dia

01.03.06.03

Descripcin Insumo
Mano de Obra
CAPATAZ
OPERARIO
OFICIAL

Partida
Rendimiento

3.0000

01.03.06.02

Descripcin Insumo
Mano de Obra
CAPATAZ
OPERARIO
OFICIAL
PEON

Partida
Rendimiento

%MO

Unidad
HH
HH
HH

Cuadrilla

Cantidad

0.100
1.000
1.000

0.0133
0.1333
0.1333

Materiales
SOLUCION AFALTICA

UND

0.3330

Equipos
HERRAMIENTAS MANUALES

%MO

3.0000

BRUAS DE 1CM x 1 CM
25.00 M/DIA
Jornada:

01.03.06.04

Descripcin Insumo
Mano de Obra
CAPATAZ
PEON
Equipos
HERRAMIENTAS MANUALES

OBRAS DE CONCRETO ARMADO

Unidad
HH
HH

%MO

8.000 horas/dia
Cuadrilla

Cantidad

0.100
1.000

0.0320
0.3200

3.0000

Partida
Rendimiento

ENTIBADO DE ZAPATAS
20.00 M2/DIA
Jornada:

01.04.01.01

Descripcin Insumo
Mano de Obra
CAPATAZ
OPERARIO
PEON
Materiales
ALAMBRE NEGRO RECOCIDO #
CLAVOS PARA MADERA 2 1/2"
CLAVOS PARA MADERA 4"
MADERA TORNILLO I/CORTE P
Equipos
HERRAMIENTAS MANUALES

Partida
Rendimiento

HH
HH
HH

Cuadrilla

Cantidad

0.100
1.000
2.000

0.0400
0.4000
0.8000

KG
KG
KG
P2

0.3000
0.1200
0.0500
3.6600

%MO

3.0000

ACERO CORRUGADO Fy=4,200kg/cm2 GRADO 60


250.00 KG/DIA
Jornada:
8.000 horas/dia

01.04.01.02

Descripcin Insumo
Mano de Obra
CAPATAZ
OFICIAL
PEON
Materiales
ALAMBRE NEGRO RECOCIDO #
FIERRO FY=4200 KG/CM2
Equipos
HERRAMIENTAS MANUALES

Partida
Rendimiento

Unidad

8.000 horas/dia

Unidad
HH
HH
HH

Cantidad

0.100
1.000
2.000

0.0032
0.0320
0.0640

KG
KG

0.0600
1.0700

%MO

3.0000

01.04.01.03 CONCRETO f'c=210kg/cm2


10.00 M3/DIA
Jornada:
Descripcin Insumo
Mano de Obra
OPERADOR DE EQUIPO LIVIAN
CAPATAZ
OPERARIO
PEON

Cuadrilla

Unidad
HH
HH
HH
HH

Materiales
ARENA GRUESA
PIEDRA ZARANDEADA DE 1/2" A
CEMENTO PORTLAND TIPO I
AGUA

M3
M3
BLS
M3

Equipos
HERRAMIENTAS MANUALES
MEZCLADORA DE CONCRETO 9VIBRADOR DE CONCRETO 4HP 1

%MO
HM
HM

8.000 horas/dia
Cuadrilla

Cantidad

2.000
0.250
2.000
7.000

1.6000
0.2000
1.6000
5.6000

0.4800
0.6300
9.7300
0.1748

1.000
1.000

3.0000
0.8000
0.8000

Partida
Rendimiento

01.04.02.01 ENCOFRADO Y DESENCOFRADO NORMAL VIGAS DE CIMENTACION


20.00 M2/DIA
Jornada:
8.000 horas/dia
Descripcin Insumo
Mano de Obra
CAPATAZ
OPERARIO
PEON
Materiales
ALAMBRE NEGRO RECOCIDO #
CLAVOS PARA MADERA 2 1/2"
CLAVOS PARA MADERA 4"
MADERA TORNILLO I/CORTE P
Equipos
HERRAMIENTAS MANUALES

Partida
Rendimiento

HH
HH
HH

Cuadrilla

Cantidad

0.100
1.000
3.000

0.0400
0.4000
1.2000

KG
KG
KG
P2

0.2100
0.1700
0.0700
4.9200

%MO

3.0000

01.04.02.02
ACERO CORRUGADO Fy=4,200kg/cm2 GRADO 60
250.00 KG/DIA
Jornada:
8.000 horas/dia
Descripcin Insumo
Mano de Obra
CAPATAZ
OFICIAL
PEON
Materiales
ALAMBRE NEGRO RECOCIDO #
FIERRO FY=4200 KG/CM2
Equipos
HERRAMIENTAS MANUALES

Partida
Rendimiento

Unidad

Unidad
HH
HH
HH

Cantidad

0.100
1.000
2.000

0.0032
0.0320
0.0640

KG
KG

0.0600
1.0700

%MO

3.0000

01.04.02.03
CONCRETO f'c=210kg/cm2
10.00 M3/DIA
Jornada:
Descripcin Insumo
Mano de Obra
OPERADOR DE EQUIPO LIVIAN
CAPATAZ
OPERARIO
PEON

Cuadrilla

Unidad
HH
HH
HH
HH

8.000 horas/dia
Cuadrilla

Cantidad

2.000
0.250
2.000
8.000

1.6000
0.2000
1.6000
6.4000

Materiales
ARENA GRUESA
PIEDRA ZARANDEADA DE 1/2" A
CEMENTO PORTLAND TIPO I
AGUA

M3
M3
BLS
M3

0.4800
0.6300
9.7300
0.1748

Equipos
HERRAMIENTAS MANUALES

%MO

3.0000

MEZCLADORA DE CONCRETO 9VIBRADOR DE CONCRETO 4HP 1

Partida
Rendimiento

Materiales
ALAMBRE NEGRO RECOCIDO #
CLAVOS PARA MADERA 2 1/2"
CLAVOS PARA MADERA 4"
MADERA TORNILLO I/CORTE P
Equipos
HERRAMIENTAS MANUALES

0.8000
0.8000

Unidad
HH
HH
HH

Cuadrilla

Cantidad

0.100
1.000
2.000

0.0800
0.8000
1.6000

KG
KG
KG
P2

0.3000
0.1200
0.0500
3.6600

%MO

3.0000

01.04.03.02
ACERO CORRUGADO Fy=4,200kg/cm2 GRADO 60
350.00 KG/DIA
Jornada:
8.000 horas/dia
Descripcin Insumo
Mano de Obra
CAPATAZ
OFICIAL
PEON
Materiales
ALAMBRE NEGRO RECOCIDO #
FIERRO FY=4200 KG/CM2
Equipos
HERRAMIENTAS MANUALES

Partida
Rendimiento

1.000
1.000

01.04.03.01
ENCOFRADO Y DESENCOFRADO DE ESTRUCTURA CARAVISTA COLUMNAS
10.00 M2/DIA
Jornada:
8.000 horas/dia
Descripcin Insumo
Mano de Obra
CAPATAZ
OFICIAL
PEON

Partida
Rendimiento

HM
HM

Unidad
HH
HH
HH

Materiales
ARENA GRUESA
PIEDRA ZARANDEADA DE 1/2" A
CEMENTO PORTLAND TIPO I
AGUA

Cantidad

0.100
1.000
2.000

0.0023
0.0229
0.0457

KG
KG

0.0600
1.0700

%MO

3.0000

01.04.03.03
CONCRETO f'c=210kg/cm2
10.00 M3/DIA
Jornada:
Descripcin Insumo
Mano de Obra
OPERADOR DE EQUIPO LIVIAN
CAPATAZ
OPERARIO
PEON

Cuadrilla

Unidad
HH
HH
HH
HH

M3
M3
BLS
M3

8.000 horas/dia
Cuadrilla

Cantidad

2.000
0.250
2.000
6.000

1.6000
0.2000
1.6000
4.8000

0.4800
0.6300
9.7300
0.1748

Equipos
HERRAMIENTAS MANUALES
MEZCLADORA DE CONCRETO 9VIBRADOR DE CONCRETO 4HP 1

Partida
Rendimiento

Materiales
ALAMBRE NEGRO RECOCIDO #
CLAVOS PARA MADERA 2 1/2"
CLAVOS PARA MADERA 4"
MADERA TORNILLO I/CORTE P
Equipos
HERRAMIENTAS MANUALES

1.000
1.000

Unidad
HH
HH
HH

Cuadrilla

Cantidad

0.100
1.000
4.000

0.0400
0.4000
1.6000

KG
KG
KG
P2

0.3000
0.1200
0.0500
3.6600

%MO

3.0000

01.04.04.02
ACERO CORRUGADO Fy=4,200kg/cm2 GRADO 60
200.00 KG/DIA
Jornada:
8.000 horas/dia
Descripcin Insumo
Mano de Obra
CAPATAZ
OFICIAL
PEON
Materiales
ALAMBRE NEGRO RECOCIDO #
FIERRO FY=4200 KG/CM2
Equipos
HERRAMIENTAS MANUALES

Partida
Rendimiento

3.0000
0.8000
0.8000

01.04.04.01 ENCOFRADO Y DESENCOFRADO DE ESTRUCTURA CARAVISTA VIGAS


20.00 M2/DIA
Jornada:
8.000 horas/dia
Descripcin Insumo
Mano de Obra
CAPATAZ
OFICIAL
PEON

Partida
Rendimiento

%MO
HM
HM

Unidad
HH
HH
HH

Materiales
ARENA GRUESA
PIEDRA ZARANDEADA DE 1/2" A
CEMENTO PORTLAND TIPO I

Cantidad

0.100
1.000
2.000

0.0040
0.0400
0.0800

KG
KG

0.0600
1.0700

%MO

3.0000

01.04.04.03
CONCRETO f'c=210kg/cm2
15.00 M3/DIA
Jornada:
Descripcin Insumo
Mano de Obra
OPERADOR DE EQUIPO LIVIAN
CAPATAZ
OPERARIO
PEON

Cuadrilla

Unidad
HH
HH
HH
HH

M3
M3
BLS

8.000 horas/dia
Cuadrilla

Cantidad

2.000
0.250
2.000
5.000

1.0667
0.1333
1.0667
2.6667

0.4800
0.6300
9.7300

AGUA
Equipos
HERRAMIENTAS MANUALES
MEZCLADORA DE CONCRETO 9VIBRADOR DE CONCRETO 4HP 1

Partida
Rendimiento

Materiales
ALAMBRE NEGRO RECOCIDO #
CLAVOS PARA MADERA 2 1/2"
CLAVOS PARA MADERA 4"
MADERA TORNILLO I/CORTE P
Equipos
HERRAMIENTAS MANUALES

3.0000
0.5333
0.5333

1.000
1.000

Unidad
HH
HH
HH

Cuadrilla

Cantidad

0.100
1.000
4.000

0.0533
0.5333
2.1333

KG
KG
KG
P2

0.3000
0.1200
0.0500
3.6600

%MO

3.0000

01.04.05.02
ACERO CORRUGADO Fy=4,200kg/cm2 GRADO 60
200.00 KG/DIA
Jornada:
8.000 horas/dia
Descripcin Insumo
Mano de Obra
CAPATAZ
OFICIAL
PEON
Materiales
ALAMBRE NEGRO RECOCIDO #
FIERRO FY=4200 KG/CM2
Equipos
HERRAMIENTAS MANUALES

Partida
Rendimiento

%MO
HM
HM

0.1748

01.04.05.01
ENCOFRADO Y DESENCOFRADO NORMAL
15.00 M2/DIA
Jornada:
8.000 horas/dia
Descripcin Insumo
Mano de Obra
CAPATAZ
OFICIAL
PEON

Partida
Rendimiento

M3

Unidad
HH
HH
HH

Materiales
ARENA GRUESA

Cantidad

0.100
1.000
2.000

0.0040
0.0400
0.0800

KG
KG

0.0600
1.0700

%MO

3.0000

01.04.05.03
CONCRETO f'c=210kg/cm2
15.00 M3/DIA
Jornada:
Descripcin Insumo
Mano de Obra
OPERADOR DE EQUIPO LIVIAN
CAPATAZ
OPERARIO
PEON

Cuadrilla

Unidad
HH
HH
HH
HH

M3

8.000 horas/dia
Cuadrilla

Cantidad

2.000
0.250
2.000
5.000

1.0667
0.1333
1.0667
2.6667

0.4800

Partida
Rendimiento

PIEDRA ZARANDEADA DE 1/2" A


CEMENTO PORTLAND TIPO I
AGUA

M3
BLS
M3

Equipos
HERRAMIENTAS MANUALES
MEZCLADORA DE CONCRETO 9VIBRADOR DE CONCRETO 4HP 1

%MO
HM
HM

Materiales
ALAMBRE NEGRO RECOCIDO #
CLAVOS PARA MADERA 2 1/2"
CLAVOS PARA MADERA 4"
MADERA TORNILLO I/CORTE P
Equipos
HERRAMIENTAS MANUALES

Unidad
HH
HH
HH

Cuadrilla

Cantidad

0.100
1.000
4.000

0.0400
0.4000
1.6000

KG
KG
KG
P2

0.3000
0.1200
0.0500
3.6600

%MO

3.0000

01.04.06.02
ACERO CORRUGADO Fy=4,200kg/cm2 GRADO 60
200.00 KG/DIA
Jornada:
8.000 horas/dia
Descripcin Insumo
Mano de Obra
CAPATAZ
OFICIAL
PEON
Materiales
ALAMBRE NEGRO RECOCIDO #
FIERRO FY=4200 KG/CM2
Equipos
HERRAMIENTAS MANUALES

Partida
Rendimiento

3.0000
0.5333
0.5333

1.000
1.000

01.04.06.01
ENCOFRADO Y DESENCOFRADO NORMAL
20.00 M2/DIA
Jornada:
8.000 horas/dia
Descripcin Insumo
Mano de Obra
CAPATAZ
OFICIAL
PEON

Partida
Rendimiento

0.6300
9.7300
0.1748

Unidad
HH
HH
HH

Cantidad

0.100
1.000
2.000

0.0040
0.0400
0.0800

KG
KG

0.0600
1.0700

%MO

3.0000

01.04.06.03
CONCRETO f'c=210kg/cm2
15.00 M3/DIA
Jornada:
Descripcin Insumo
Mano de Obra
OPERADOR DE EQUIPO LIVIAN
CAPATAZ
OPERARIO
PEON

Cuadrilla

Unidad
HH
HH
HH
HH

8.000 horas/dia
Cuadrilla

Cantidad

2.000
0.250
2.000
5.000

1.0667
0.1333
1.0667
2.6667

Partida
Rendimiento

Materiales
ARENA GRUESA
PIEDRA ZARANDEADA DE 1/2" A
CEMENTO PORTLAND TIPO I
AGUA

M3
M3
BLS
M3

0.4800
0.6300
9.7300
0.1748

Equipos
HERRAMIENTAS MANUALES
MEZCLADORA DE CONCRETO 9VIBRADOR DE CONCRETO 4HP 1

%MO
HM
HM

3.0000
0.5333
0.5333

01.04.07.01
ENCOFRADO Y DESENCOFRADO NORMAL
25.00 M2/DIA
Jornada:
8.000 horas/dia
Descripcin Insumo
Mano de Obra
CAPATAZ
OFICIAL
PEON
Materiales
ALAMBRE NEGRO RECOCIDO #
CLAVOS PARA MADERA 2 1/2"
CLAVOS PARA MADERA 4"
MADERA TORNILLO I/CORTE P
Equipos
HERRAMIENTAS MANUALES

Partida
Rendimiento

Unidad
HH
HH
HH

Cuadrilla

Cantidad

0.100
1.000
4.000

0.0320
0.3200
1.2800

KG
KG
KG
P2

0.3000
0.1200
0.0500
3.6600

%MO

3.0000

01.04.07.02
ACERO CORRUGADO Fy=4,200kg/cm2 GRADO 60
300.00 KG/DIA
Jornada:
8.000 horas/dia
Descripcin Insumo
Mano de Obra
CAPATAZ
OFICIAL
PEON
Materiales
ALAMBRE NEGRO RECOCIDO #
FIERRO FY=4200 KG/CM2
Equipos
HERRAMIENTAS MANUALES

Partida
Rendimiento

1.000
1.000

Unidad
HH
HH
HH

Cantidad

0.100
1.000
2.000

0.0027
0.0267
0.0533

KG
KG

0.0600
1.0700

%MO

3.0000

01.04.07.03
CONCRETO f'c=210kg/cm2
12.00 M3/DIA
Jornada:
Descripcin Insumo
Mano de Obra
OPERADOR DE EQUIPO LIVIAN
CAPATAZ
OPERARIO

Cuadrilla

Unidad
HH
HH
HH

8.000 horas/dia
Cuadrilla

Cantidad

2.000
0.250
2.000

1.3333
0.1667
1.3333

Partida
Rendimiento

PEON

HH

Materiales
ARENA GRUESA
PIEDRA ZARANDEADA DE 1/2" A
CEMENTO PORTLAND TIPO I
AGUA

M3
M3
BLS
M3

Equipos
HERRAMIENTAS MANUALES
MEZCLADORA DE CONCRETO 9VIBRADOR DE CONCRETO 4HP 1

%MO
HM
HM

Materiales
ALAMBRE NEGRO RECOCIDO #
CLAVOS PARA MADERA 2 1/2"
CLAVOS PARA MADERA 4"
MADERA TORNILLO I/CORTE P
Equipos
HERRAMIENTAS MANUALES

0.4800
0.6300
9.7300
0.1748

3.0000
0.6667
0.6667

1.000
1.000

Unidad
HH
HH
HH

Cuadrilla

Cantidad

0.100
1.000
4.000

0.0533
0.5333
2.1333

KG
KG
KG
P2

0.3000
0.1200
0.0500
3.6600

%MO

3.0000

01.04.08.02
ACERO CORRUGADO Fy=4,200kg/cm2 GRADO 60
200.00 KG/DIA
Jornada:
8.000 horas/dia
Descripcin Insumo
Mano de Obra
CAPATAZ
OFICIAL
PEON
Materiales
ALAMBRE NEGRO RECOCIDO #
FIERRO FY=4200 KG/CM2
Equipos
HERRAMIENTAS MANUALES

Partida
Rendimiento

3.3333

01.04.08.01
ENCOFRADO Y DESENCOFRADO NORMAL
15.00 M2/DIA
Jornada:
8.000 horas/dia
Descripcin Insumo
Mano de Obra
CAPATAZ
OFICIAL
PEON

Partida
Rendimiento

5.000

Unidad
HH
HH
HH

Cantidad

0.100
1.000
2.000

0.0040
0.0400
0.0800

KG
KG

0.0600
1.0700

%MO

3.0000

01.04.08.03
CONCRETO f'c=210kg/cm2
10.00 M3/DIA
Jornada:
Descripcin Insumo
Mano de Obra
OPERADOR DE EQUIPO LIVIAN

Cuadrilla

Unidad
HH

8.000 horas/dia
Cuadrilla

Cantidad

2.000

1.6000

Partida
Rendimiento

CAPATAZ
OPERARIO
PEON

HH
HH
HH

Materiales
ARENA GRUESA
PIEDRA ZARANDEADA DE 1/2" A
CEMENTO PORTLAND TIPO I
AGUA

M3
M3
BLS
M3

Equipos
HERRAMIENTAS MANUALES
MEZCLADORA DE CONCRETO 9VIBRADOR DE CONCRETO 4HP 1

%MO
HM
HM

Materiales
ALAMBRE NEGRO RECOCIDO #
CLAVOS PARA MADERA 2 1/2"
CLAVOS PARA MADERA 4"
MADERA TORNILLO I/CORTE P
Equipos
HERRAMIENTAS MANUALES

0.4800
0.6300
9.7300
0.1748

3.0000
0.8000
0.8000

1.000
1.000

Unidad
HH
HH
HH

Cuadrilla

Cantidad

0.100
1.000
4.000

0.0533
0.5333
2.1333

KG
KG
KG
P2

0.3000
0.1200
0.0500
3.6600

%MO

3.0000

01.04.09.02
ACERO CORRUGADO Fy=4,200kg/cm2 GRADO 60
250.00 KG/DIA
Jornada:
8.000 horas/dia
Descripcin Insumo
Mano de Obra
CAPATAZ
OFICIAL
PEON
Materiales
ALAMBRE NEGRO RECOCIDO #
FIERRO FY=4200 KG/CM2
Equipos
HERRAMIENTAS MANUALES

Partida
Rendimiento

0.2000
1.6000
4.0000

01.04.09.01
ENCOFRADO Y DESENCOFRADO NORMAL
15.00 M2/DIA
Jornada:
8.000 horas/dia
Descripcin Insumo
Mano de Obra
CAPATAZ
OFICIAL
PEON

Partida
Rendimiento

0.250
2.000
5.000

Unidad
HH
HH
HH

Cantidad

0.100
1.000
2.000

0.0032
0.0320
0.0640

KG
KG

0.0600
1.0700

%MO

3.0000

01.04.09.03
CONCRETO f'c=210kg/cm2
12.00 M3/DIA
Jornada:
Descripcin Insumo

Cuadrilla

Unidad

8.000 horas/dia
Cuadrilla

Cantidad

Mano de Obra
OPERADOR DE EQUIPO LIVIAN
CAPATAZ
OPERARIO
PEON

HH
HH
HH
HH

Materiales
ARENA GRUESA
PIEDRA ZARANDEADA DE 1/2" A
CEMENTO PORTLAND TIPO I
AGUA

M3
M3
BLS
M3

Equipos
HERRAMIENTAS MANUALES
MEZCLADORA DE CONCRETO 9VIBRADOR DE CONCRETO 4HP 1

%MO
HM
HM

2.000
0.250
2.000
5.000

1.3333
0.1667
1.3333
3.3333

0.4800
0.6300
9.7300
0.1748

1.000
1.000

3.0000
0.6667
0.6667

TARIOS

C.U. por : Und

35.30

Precio S/.

Parcial

14.85
14.85
total

0.79
15.84
16.63

14.20
3.36
total

10.65
7.39
18.04

16.63
8.40
total

0.50
0.13
0.62

C.U. por : M2

2.66

Precio S/.

Parcial

14.85
14.85
14.85
14.85
total

0.59
0.06
0.59
0.59
1.84

5.05
3.78
3.36
total

0.15
0.02
0.06
0.23

1.84
8.40
2.52
37.82
6.30
5.25
total

0.06
0.01
0.10
0.06
0.25
0.11
0.58

C.U. por : M2

0.34

Precio S/.

Parcial

metrado:
Q hh
Nmero p

metrado:
Q hh
Nmero p

metrado:
Q hh
Nmero p

14.85
14.85

0.03
0.30
0.33

0.33

0.01
0.01

Total

Total

TERRENO COMPETENTE
C.U. por : M2

1.45

Precio S/.

Parcial

14.85
14.85
14.85

0.06
0.59
0.59
1.25

1.25
37.80
5.25

0.04
0.06
0.11
0.20

C.U. por : M2

18.98

Precio S/.

Parcial

14.85
14.85

0.59
17.82
18.41

18.41
8.40

0.55
0.01
0.57

Total

Total

Total

Total

C.U. por : M2

0.34

Precio S/.

Parcial

14.85
14.85

0.03
0.30
0.33

0.33

0.01
0.01

Total

Total

Y EQUIPO MENOR
C.U. por : M2

1.71

Precio S/.

Parcial

metrado:
Q hh
Nmero p

metrado:
Q hh
Nmero p

metrado:
Q hh
Nmero p

metrado:
Q hh
Nmero p

14.85
14.85
14.85

0.08
0.79
0.79
1.66

1.66

0.05
0.05

Total

Total

DE FONDO HASTA FALSO PISO


C.U. por : M2

86.06

Precio S/.

Parcial

14.85
14.85

0.04
0.40
0.44

0.44

0.01
0.01

C.U. por : M2

83.62

Precio S/.

Parcial

14.85
14.85

1.98
79.20
81.18

81.18

2.44
2.44

C.U. por : M2

134.37

Precio S/.

Parcial

14.85
14.85
14.85
14.85
total

0.30
2.97
1.49
8.91
13.66

50.42
16.39
50.42
0.84
total

25.21
41.79
43.87
110.87

13.66
8.40

0.41
0.01

Total

Total

Total

Total

metrado:
Q hh
Nmero p

metrado:
Q hh
Nmero p

metrado:
Q hh
Nmero p

29.41
total

9.41
9.83

C.U. por : M3

187.84

Precio S/.

Parcial

14.85
14.85
14.85
14.85
14.85
total

4.75
0.48
4.75
9.50
38.02
57.50

50.42
16.39
50.42
0.84
total

25.21
49.99
43.87
0.14
119.21

57.50
29.41
total

1.72
9.41
11.14

PARA DOWELLS
C.U. por : KG

5.61

Precio S/.

Parcial

14.85
14.85
14.85
total

0.06
1.19
1.19
2.44

3.78
2.69
total

0.23
2.88
3.11

2.44
total

0.07
0.07

C.U. por : M2

50.83

Precio S/.

Parcial

14.85
14.85
14.85
14.85
total

0.85
8.49
16.97
8.49
34.79

3.78
3.78
3.78

0.98
0.34
0.15

3.36
total

13.52
15.00

34.79
total

1.04
1.04

C.U. por : M3

275.02

Precio S/.

Parcial

14.85
14.85
14.85
14.85
total

1.98
19.80
19.80
84.15
125.73

50.42
16.39
50.42
0.84
total

21.18
63.76
40.84
0.13
125.91

125.73
29.41
total

3.77
19.61
23.38

C.U. por : M3

103.47

Precio S/.

Parcial

14.85
14.85
14.85
14.85
total

0.12
1.19
0.59
3.56
5.46

16.39
50.42
0.84
total

63.76
32.77
0.13
96.66

5.46
29.41
total

0.16
1.18
1.34

C.U. por : M3

62.30

Precio S/.

Parcial

14.85
14.85
14.85
14.85

0.85
8.49
8.49
16.97

total

34.79

2.53
2.83
77.00
100.59
4.55
total

0.51
0.57
3.85
4.02
17.52
26.46

34.79
total

1.04
1.04

C.U. por : M3

469.15

Precio S/.

Parcial

14.85
14.85
14.85
14.85
total

0.59
5.94
11.88
47.52
65.93

25.33
135.69
0.50
total

215.31
172.33
0.05
387.68

21.19
12.71
65.93
total

8.48
5.08
1.98
15.54

C.U. por : M3

48.14

Precio S/.

Parcial

14.85
14.85
14.85
total

1.19
11.88
11.88
24.95

2.53
2.83
77.00
4.55

0.51
0.57
3.85
17.52

total

22.44

24.95
total

0.75
0.75

C.U. por : M3

469.15

Precio S/.

Parcial

14.85
14.85
14.85
14.85
total

0.59
5.94
11.88
47.52
65.93

25.33
135.69
0.50
total

215.31
172.33
0.05
387.68

21.19
12.71
65.93
total

8.48
5.08
1.98
15.54

ACCION 1/2" P/VEREDAS


C.U. por : KG

13.61

Precio S/.

Parcial

14.85
14.85
14.85
total

0.20
1.98
1.98
4.16

28.00
total

9.32
9.32

4.16
total

0.12
0.12

C.U. por : KG

5.38

Precio S/.

Parcial

14.85
14.85
total

0.48
4.75
5.23

5.23
total

0.16
0.16

C.U. por : M2

33.04

Precio S/.

Parcial

14.85
14.85
14.85
total

0.59
5.94
11.88
18.41

3.78
3.78
3.78
3.36
total

1.13
0.45
0.19
12.30
14.07

18.41
total

0.55
0.55

C.U. por : KG

4.62

Precio S/.

Parcial

14.85
14.85
14.85
total

0.05
0.48
0.95
1.47

3.78
2.69
total

0.23
2.88
3.11

1.47
total

0.04
0.04

C.U. por : M3

403.50

Precio S/.

Parcial

14.85
14.85
14.85
14.85
total

23.76
2.97
23.76
83.16
133.65

67.23
67.23
16.39
0.84
total

32.27
42.35
159.47
0.15
234.25

133.65
29.41
10.08

4.01
23.53
8.06

total

35.60

DE CIMENTACION
C.U. por : M2

43.32

Precio S/.

Parcial

14.85
14.85
14.85
total

0.59
5.94
17.82
24.35

3.78
3.78
3.78
3.36
total

0.79
0.64
0.26
16.53
18.23

24.35
total

0.73
0.73

C.U. por : KG

4.62

Precio S/.

Parcial

14.85
14.85
14.85
total

0.05
0.48
0.95
1.47

3.78
2.69
total

0.23
2.88
3.11

1.47
total

0.04
0.04

C.U. por : M3

415.73

Precio S/.

Parcial

14.85
14.85
14.85
14.85
total

23.76
2.97
23.76
95.04
145.53

67.23
67.23
16.39
0.84
total

32.27
42.35
159.47
0.15
234.25

145.53

4.37

29.41
10.08
total

23.53
8.06
35.96

RA CARAVISTA COLUMNAS
C.U. por : M2

52.01

Precio S/.

Parcial

14.85
14.85
14.85
total

1.19
11.88
23.76
36.83

3.78
3.78
3.78
3.36
total

1.13
0.45
0.19
12.30
14.07

36.83
total

1.10
1.10

C.U. por : KG

4.19

Precio S/.

Parcial

14.85
14.85
14.85
total

0.03
0.34
0.68
1.05

3.78
2.69
total

0.23
2.88
3.11

1.05
total

0.03
0.03

C.U. por : M3

391.26

Precio S/.

Parcial

14.85
14.85
14.85
14.85
total

23.76
2.97
23.76
71.28
121.77

67.23
67.23
16.39
0.84
total

32.27
42.35
159.47
0.15
234.25

121.77
29.41
10.08
total

3.65
23.53
8.06
35.25

A CARAVISTA VIGAS
C.U. por : M2

45.28

Precio S/.

Parcial

14.85
14.85
14.85
total

0.59
5.94
23.76
30.29

3.78
3.78
3.78
3.36
total

1.13
0.45
0.19
12.30
14.07

30.29
total

0.91
0.91

C.U. por : KG

5.00

Precio S/.

Parcial

14.85
14.85
14.85
total

0.06
0.59
1.19
1.84

3.78
2.69
total

0.23
2.88
3.11

1.84
total

0.06
0.06

C.U. por : M3

330.77

Precio S/.

Parcial

14.85
14.85
14.85
14.85
total

15.84
1.98
15.84
39.60
73.26

67.23
67.23
16.39

32.27
42.35
159.47

0.84
total

0.15
234.25

73.26
29.41
10.08
total

2.20
15.69
5.38
23.26

C.U. por : M2

55.68

Precio S/.

Parcial

14.85
14.85
14.85
total

0.79
7.92
31.68
40.39

3.78
3.78
3.78
3.36
total

1.13
0.45
0.19
12.30
14.07

40.39
total

1.21
1.21

C.U. por : KG

5.00

Precio S/.

Parcial

14.85
14.85
14.85
total

0.06
0.59
1.19
1.84

3.78
2.69
total

0.23
2.88
3.11

1.84
total

0.06
0.06

C.U. por : M3

330.77

Precio S/.

Parcial

14.85
14.85
14.85
14.85
total

15.84
1.98
15.84
39.60
73.26

67.23

32.27

67.23
16.39
0.84
total

42.35
159.47
0.15
234.25

73.26
29.41
10.08
total

2.20
15.69
5.38
23.26

C.U. por : M2

45.28

Precio S/.

Parcial

14.85
14.85
14.85
total

0.59
5.94
23.76
30.29

3.78
3.78
3.78
3.36
total

1.13
0.45
0.19
12.30
14.07

30.29
total

0.91
0.91

C.U. por : KG

5.00

Precio S/.

Parcial

14.85
14.85
14.85
total

0.06
0.59
1.19
1.84

3.78
2.69
total

0.23
2.88
3.11

1.84
total

0.06
0.06

C.U. por : M3

330.77

Precio S/.

Parcial

14.85
14.85
14.85
14.85
total

15.84
1.98
15.84
39.60
73.26

67.23
67.23
16.39
0.84
total

32.27
42.35
159.47
0.15
234.25

73.26
29.41
10.08
total

2.20
15.69
5.38
23.26

C.U. por : M2

39.04

Precio S/.

Parcial

14.85
14.85
14.85
total

0.48
4.75
19.01
24.24

3.78
3.78
3.78
3.36
total

1.13
0.45
0.19
12.30
14.07

24.24
total

0.73
0.73

C.U. por : KG

4.37

Precio S/.

Parcial

14.85
14.85
14.85
total

0.04
0.40
0.79
1.23

3.78
2.69
total

0.23
2.88
3.11

1.23
total

0.04
0.04

C.U. por : M3

354.90

Precio S/.

Parcial

14.85
14.85
14.85

19.80
2.48
19.80

14.85
total

49.50
91.58

67.23
67.23
16.39
0.84
total

32.27
42.35
159.47
0.15
234.25

91.58
29.41
10.08
total

2.75
19.61
6.72
29.07

C.U. por : M2

55.68

Precio S/.

Parcial

14.85
14.85
14.85
total

0.79
7.92
31.68
40.39

3.78
3.78
3.78
3.36
total

1.13
0.45
0.19
12.30
14.07

40.39
total

1.21
1.21

C.U. por : KG

5.00

Precio S/.

Parcial

14.85
14.85
14.85
total

0.06
0.59
1.19
1.84

3.78
2.69
total

0.23
2.88
3.11

1.84
total

0.06
0.06

C.U. por : M3

379.03

Precio S/.

Parcial

14.85

23.76

14.85
14.85
14.85
total

2.97
23.76
59.40
109.89

67.23
67.23
16.39
0.84
total

32.27
42.35
159.47
0.15
234.25

109.89
29.41
10.08
total

3.30
23.53
8.06
34.89

C.U. por : M2

55.68

Precio S/.

Parcial

14.85
14.85
14.85
total

0.79
7.92
31.68
40.39

3.78
3.78
3.78
3.36
total

1.13
0.45
0.19
12.30
14.07

40.39
total

1.21
1.21

C.U. por : KG

4.62

Precio S/.

Parcial

14.85
14.85
14.85
total

0.05
0.48
0.95
1.47

3.78
2.69
total

0.23
2.88
3.11

1.47
total

0.04
0.04

C.U. por : M3

354.90

Precio S/.

Parcial

14.85
14.85
14.85
14.85
total

19.80
2.48
19.80
49.50
91.58

67.23
67.23
16.39
0.84
total

32.27
42.35
159.47
0.15
234.25

91.58
29.41
10.08
total

2.75
19.61
6.72
29.07

1.000
1.120
0.893

800
99.2

Item

Descripcin

01
01.01
01.01.01

ESTRUCTURAS
OBRAS PROVISIONALES
CARTEL DE OBRA

01.01.02

LIMPIEZA PERMANENTE Y FINAL DE OBRA

Und.

METRADO

0.00

GLB

0.00

INDICE DE PROD.CANT. HH
0
0.00
0.00

RESUMEN HOJA DE METRADOS ESTRUCTURAS


OBRA

: CREACION DEL CENTRO DE SERVICIOS - TAMBO EN LA COMUNIDAD NATIVA KIRIGUETI, DISTRITO DE ECHARATE,
PROVINCIA LA CONVENCION, DEPARTAMENTO DE CUSCO

PART.
01.01

DESCRIPCION

UND

TRABAJOS PRELIMINARES

01.01.01

CARTEL DE OBRA 3.60X2.40M

und

01.01.02

TRAZO, NIVELES Y REPLANTEO PRELIMINAR

m2

01.01.03

REPLANTEO DURANTE EL PROCESO

m2

01.02

MOVIMIENTO DE TIERRAS

01.02.01

CORTE, NIVELACION MANUAL HASTA ALCANZAR TERRENO COMPETENTE

m3

01.02.02

EXCAVACION MANUAL PARA ESTRUCTURAS

m3

01.02.03

REFINE Y COMPACTACION DE NIVELES DE FONDO

m2

01.02.04

RELLENO COMPACTADO CON MATERIAL PROPIO Y EQUIPO MENOR

m3

01.02.05

BASE GRANULAR COMPACTADO DESDE NIVELES DE FONDO HASTA FALSO PISO

m2

01.02.06

ELIMINACION DE MATERIAL EXCEDENTE D=50M

m3

01.03
01.03.01
01.03.01.01
01.03.02

CONCRETO SIMPLE
SOLADOS
SOLADO C/MEZCLA 1:8 C:H E=4"

m2

CIMIENTOS CORRIDOS

01.03.02.01

CONCRETO P/CIMIENTO CORRIDO 1:8 C:H + 30% P.G MAX. 6"

m3

01.03.02.02

ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 PARA DOWELLS

kg

01.03.03

SOBRECIMIENTOS

01.03.03.01

ENCOFRADO Y DESENCOFRADO P/CIMIENTO

m2

01.03.03.02

CONCRETO P/SOBRECIMIENTO 1:8 C:H + 25% P.M MAX. 3"

m3

01.03.04
01.03.04.01
01.03.05

FALSO PISO
CONCRETO P/FALSO PISO e=4" 1:6 C:H

m2

SARDINELES EN SS.HH

01.03.05.01

ENCOFRADO Y DESENCOFRADO P/SARDINEL

m2

01.03.05.02

CONCRETO f'c=210kg/cm2

m3

01.03.06

VEREDAS Y RAMPAS

01.03.06.01

ENCOFRADO Y DESENCOFRADO P/VEREDAS

m2

01.03.06.02

CONCRETO f'c=175kg/cm2

m3

01.03.06.03

JUNTA ASFALTICA DE DILATACION Y CONTRACCION 1/2" P/VEREDAS

01.03.06.04

BRUAS DE 1CM x 1 CM

01.04
01.04.01

OBRAS DE CONCRETO ARMADO


ZAPATAS

01.04.01.01

ENTIBADO DE ZAPATAS

m2

01.04.01.02

ACERO CORRUGADO Fy=4,200kg/cm2 GRADO 60

kg

01.04.01.03

CONCRETO f'c=210kg/cm2

m3

01.04.02

VIGAS DE CIMENTACION

01.04.02.01

ENCOFRADO Y DESENCOFRADO NORMAL VIGAS DE CIMENTACION

m2

01.04.02.02

ACERO CORRUGADO Fy=4,200kg/cm2 GRADO 60

kg

01.04.02.03

CONCRETO f'c=210kg/cm2

m3

01.04.03

COLUMNAS

01.04.03.01

ENCOFRADO Y DESENCOFRADO DE ESTRUCTURA CARAVISTA COLUMNAS

m2

01.04.03.02

ACERO CORRUGADO Fy=4,200kg/cm2 GRADO 60

kg

01.04.03.03

CONCRETO f'c=210kg/cm2

m3

01.04.04

VIGAS

01.04.04.01

ENCOFRADO Y DESENCOFRADO DE ESTRUCTURA CARAVISTA VIGAS

m2

01.04.04.02

ACERO CORRUGADO Fy=4,200kg/cm2 GRADO 60

kg

01.04.04.03

CONCRETO f'c=210kg/cm2

m3

01.04.05

COLUMNETAS DE CONFINAMIENTO

01.04.05.01

ENCOFRADO Y DESENCOFRADO NORMAL

m2

01.04.05.02

ACERO CORRUGADO Fy=4,200kg/cm2 GRADO 60

kg

01.04.05.03
01.04.06

CONCRETO f'c=210kg/cm2

m3

VIGUETAS DE CONFINAMIENTO

01.04.06.01

ENCOFRADO Y DESENCOFRADO NORMAL

m2

01.04.06.02

ACERO CORRUGADO Fy=4,200kg/cm2 GRADO 60

kg

01.04.06.03

CONCRETO f'c=210kg/cm2

m3

01.04.07

MUROS DE CONCRETO PARA DIVISIONES

01.04.07.01

ENCOFRADO Y DESENCOFRADO NORMAL

m2

01.04.07.02

ACERO CORRUGADO Fy=4,200kg/cm2 GRADO 60

kg

01.04.07.03

CONCRETO f'c=210kg/cm2

m3

01.04.08

COLUMNAS CIRCULARES CON ENCOFRADO PERDIDO

01.04.08.01

ENCOFRADO Y DESENCOFRADO PERDIDO

m2

01.04.08.02

ACERO CORRUGADO Fy=4,200kg/cm2 GRADO 60

kg

01.04.08.03

CONCRETO f'c=210kg/cm2

m3

01.04.09

MESAS DE CONCRETO PARA SS.HH Y COCINA

01.04.09.01

ENCOFRADO Y DESENCOFRADO NORMAL

m2

01.04.09.02

ACERO CORRUGADO Fy=4,200kg/cm2 GRADO 60

kg

01.04.09.03

CONCRETO f'c=210kg/cm2

m3

JORNADA

DISTRITO DE ECHARATE,

RENDIMIENTO
(DIA)

CANT

CUADRILLA
TOTAL

PRODUCCIN
(UND/HH)

PRODUCTIVIDAD
(HH/UND)

CANTIDAD HH

117.92
1.12
99.20
17.60
665.08
13.16
126.49
7.73
3.18
11.54
502.99
894.26

0.89
8.06
45.45

1.12
0.12
0.02

4.10

11.90
0.81
45.45
8.93
34.09
0.18

0.08
1.24
0.02
0.11
0.03
5.47

80.00

9.20

1.09

0.92

39.25

33.95

25.00

12.10

93.20

200.00

4.10

0.26
6.10

3.87
0.16

131.45
15.28

118.36

14.00

4.10

8.88

12.00

12.70

0.43
0.12

2.34
8.47

277.30
75.18

244.50

200.00

9.20

2.72

0.37

89.98

1.93

14.00

4.10

0.05

20.00

11.10

0.43
0.23

2.34
4.44

4.52
0.22

27.92

10.00

2.10

18.38

20.00

11.10

0.60
0.23
3.57
2.84

1.68
4.44
0.28
0.35

46.91
81.61
12.29
120.26
2643.19

0.81
10.08
0.11

1.24
0.10
9.00

209.11
37.54
150.48

0.61
10.08
0.10

1.64
0.10
9.80

404.56
74.79
126.81

0.40
14.11
0.12

2.48
0.07
8.20

372.55
123.90
86.18

0.49
8.06
0.20

2.04
0.12
4.93

231.99
176.97
65.22

0.37
8.06

2.72
0.12

197.58
38.59

1.00

15.00

2.10

800.00

200.00

3.10

800.00

400.00

1.10

156.66

200.00

2.10

102.01

20.00

3.10

351.27

400.00

1.10

28.40

150.00

2.10

393.25

300.00

1.10

92.01

6.00

42.66

43.90

60.00

2.10

341.66

25.00

1.10

168.64

20.00

3.10

378.42

250.00

3.10

16.72

10.00

11.25

246.68

20.00

4.10

753.95

250.00

3.10

12.94

10.00

12.25

150.22

10.00

3.10

1,748.65

350.00

3.10

10.51

10.00

10.25

113.72

20.00

5.10

1,427.14

200.00

3.10

13.22

15.00

9.25

72.64

15.00

5.10

311.18

200.00

3.10

4.42

15.00

9.25

0.20

4.93

21.81

0.49
8.06
0.20

2.04
0.12
4.93

78.62
62.39
15.89

0.61
12.10
0.16

1.63
0.08
6.17

19.40
2.70
3.64

0.37
8.06
0.14

2.72
0.12
7.40

51.79
42.80
8.81

0.37
10.08
0.16

2.72
0.10
6.17

30.46
4.05
4.56

38.54

20.00

5.10

503.17

200.00

3.10

3.22

15.00

9.25

11.89

25.00

5.10

32.68

300.00

3.10

0.59

12.00

9.25

19.04

15.00

5.10

345.16

200.00

3.10

1.19

10.00

9.25

11.20

15.00

5.10

40.85

250.00

3.10

0.74

12.00

9.25

CANTIDAD DE
DIAS

6.07
0.07
4.00
2.00
23.60
0.78
5.10
0.88
0.19
1.31
15.34
31.02
0.53
1.36
0.47
8.45
0.74
1.22
0.14
0.00
2.79
0.92
0.73
13.67
79.10
8.43
1.51
1.67
12.33
3.02
1.29
15.02
5.00
1.05
5.69
7.14
0.88
4.84
1.56

0.29
1.93
2.52
0.21
0.48
0.11
0.05
1.27
1.73
0.12
0.75
0.16
0.06