Vous êtes sur la page 1sur 6

PROJECT

TAKREER NON PROCESS BUILDINGS ( EPC-6)

DATE

BULDG

EXTERNAL WORKS(SUMP PIT)

DEGN BY

DERBY DESIGN

TITLE

CHECK FOR CRACK WIDTH

REV NO

Abu Dhabi

BEAMS

17-Nov

PAGE

RG

CHKD BY

APPR BY

REV DT

CHECK FOR CRACK WIDTH IN SLAB

R CRACK WIDTH IN SLAB

VU
SAK

DERBY DESIGN
Abu Dhabi

PROJECT

TAKREER NON PROCESS BUILDINGS ( EPC-6)

BULDG

EXTERNAL WORKS (SUMP PIT)

TITLE

CRACK WIDTH CHECK

MEMBER

BOTTOM SLAB

Maximum Moment in the Member(SERVICE)

30.00

kNm

Breadth of Member(B)

1000.00

mm

Depth of Member(D)

300.00

mm

Clear Cover (dc)

75.00

mm

Effective Cover (y)

112.50

mm

Effective depth (d)

187.50

mm

Strength of Concrete, fc'

30.00

N/mm

Yield Strength of Steel, fy

460.00

N/mm

Modulus of Elasticity of Concrete(Ec)

4700

fc '

Modular Ratio(n=Es/Ec)

25743

N/mm

2.00E+05

N/mm

7.77

Diameter of Bar Used

25

mm

Provided Spacing

100

mm

10

Area of Steel Provied(As)

4906

(reinforcement Ratio)

(4906/1000/187.5)

0.0262

n 2

0.466

No.of Bars(ns)

=
Stress in Steel (fs)

A(effective tension area of concrete for one bar)

mm

2 n n

k
3

0.8446666667

h2
h1
2.12

M
As jd

5.49

b 2y
ns

34.88

Ksi

in

h2

Crack Width(w)

0.076 f s 3 d c A 10 3

0.004

0.1

in
mm

Not Ok

<

0.1

DATE

17-Nov

DEGN BY
REV NO

PAGE

RG

CHKD BY

VU

APPR BY

SAK

REV DT

Neutral
Axis

kd

h1

d
jd

dc
B

Steel
C.G

mm

Vous aimerez peut-être aussi