The MiCOM ALSTOM P70 numerical busbar protection scheme provides complete protection for all
voltage levels - up to extra / ultra high voltage - for all busbar configurations.
Innovative techniques, including CT ‘The MICOM ALSTOM P740 busbar
supervision, saturation detection and Aifferental protection scheme can be
dynamic topology processing algorithms engineered to provide a centralised or
offer a unique combination of security, istributed architecture It also
speed and sensitivity. The substation replica supports easy maintenance, operations and
processing algorithms ensure that the P7409 future expansion ofthe busbar.
‘adapts tothe dynamically changing topology The optional redundant ethernet board
af te busbar, which can be displayed on reduces the cost of ownership since the
any PC using the substation realtime relay is natively embedded in the switch
mnamic monitoring too, board. This reduces the amount of stand
alone switches needed, reducing the witing,
power supply and maintenance cost,
Furthermore, increasing the availabilty rate
decreases the risk of electrical outages.
Customer benefits
+ Fast fault trip (typically 11-25 ms and
‘8 ms with high speed contacts option)
- Adaptable to any busbar configuration
IEC 61050-8.1 and IEC 60870-5-103
compliant
+ Can operate with different types of CT
«Programmable function keys & hotkeys
«Flexible tr-colour LEDs
+ Fibre optic connections:
+ Ensure high communication speeds
+ Eliminate insulation problemsApplication units associated with the protected busbars
‘The MiCOM ALSTOM P40 numerical ‘and acting on thes signals. The CU then
busbar protection scheme is designed to initiates a buszone protection trip when
protect a wide range of busbar necessary. A single CU can accommodate
configurations. The modular scheme uses up:
three relay types: + 8Zones
= Central Unit (CU) - P42 + 28 Peripheral Units
+ Peripheral Units (PU) -Pr42 / P43 (ne PU is associated with each CT
‘These units interconnect using fie optic location: usually one per incomerffeeder
cables and together with the topology ‘and one or two for each bus coupler/ous
configurator software, allow applications to section, depending on the number of CTs.
alltypes of busbar configuration, ‘The PUs acquire the analogue signals from
‘The Central Unit co-ordinates the scheme, the associated CT and the binary signals
receiving signals fom all the peripheral from the auxiliary contacts ofthe circuit
PROTECTION
breakers and isolators The PUs also
incorporate the main circuit breaker failure
logic together with additional protection
functions (dead zone, overcurrent, etc.) The
743 allows for increased opto inputs,
function keys and optional ethernet board
and is particularly useful in double busbar
applications.
Where single ple breakers and transfer
bbusbars are employed, the 1/0
equirements are high in comparison to
those required fora single busbar
application, soa P742 may be more
suitable,
ES
‘ANSI IEC 61850 Prat praz=PTAS
‘378B/P __PhaPDIF Phase segregated biased curent differential high speed busbar - - -
protection.
B7CZIP __CaPPDIF Check zone segregated biased phase curent ailferental high speed 7
busbar protection
‘7BB7N _NeUPDIF Sensitive earth ful bias curent controled busbar protection zi zi zi
B7CZIN_ C2NPDIF___ Check zone segregated biased earth curent differential high speed .
busbar protection busbar protection
SO/S1TP _OcpPTOG Phase overcurrent protection (2 stages) i zi 5
'50/61/NElmPTOC Earth overcurrent protection (2 stages) i zi zi
SOST/P __DzpPhsPTO Dead zone earth protecton (short zane Belwean CTs and open GBs) .
a
SOSTIN _D2EMPTOO Dead zone earth protection (shor zone between OTs and open GBS) z o o
CTs, Current transformer supervision 7 .
SOBF RERF Breaker falure protection (LBS) oi a zi
TSI isolator discrepancy alarm : - -
Fibre opti signaling channel 7
OpIGGIO_Digial inputs @ 6 =
RyGGIO__Oulpulroays é 6 6
‘Vial digital aputs (va fore communication) 6 6 6
Virtual output relays (via fibre commanicaton) 6 16 6
Front cormmunications port (RS232) : : :
Rear communications port (Kbus/EIAIRS)485) 7 5 7
‘Second rear communications por (KOusTEIARS}485)~ Option : Option
TnierviCOM teloprotocion (wih second rear communication pow)” Option : Option
Rear communications por (Ethernet) " Option : Option
Time synchronisation po (IRIGB)* Option : 7
FrkGGIO__ Function keys 10 : 70
TedSGIO__Progranmable vrcolour LEDs @ zi 8
7 Refer to data sheat for model selection
Complete flexibility to suit any busbar configurationDall)
Management functions
Inaddton tothe protection & conta
element, the P740 provides a wide range of
measurement, maritorng, post faut
anaiyss and sl-iagnostic Features:
+ Circuit breaker contol
“Tip circuit supervision (using PSL)
= On-line measurement
+ Plan status moritaring
“Four alternative setting grours
+ Programmable scheme logic (PS)
+ Sequence of event recording (508)
~ Comprehensive fault record (including
topology)
+ Comprehensive disturbance recording =“ — eel “
(ovavetorm capture)
+ User configurable function keys & hotkeys
+ User configurable t-colour LEDs
+ Local and remote communications ports
~Time synchronisation
= Full customisable menu twats
+ Muit-evel password protection
+ Test facies
+ Power-up diagnostics and continuous se
monitoring of relay
+ User-friendly setting, analysis and
monitoring software
P40 scheme applied to protecting @ dauble busbar with transfer bus
Functional overview
oe
bk
Fast, sensitive & secure - P740 - the ultimate in busbar protectionPROTECTION
Busbar differential protection
‘The primary protection element ofthe P740
isthe phase segregated biased current
differential protection. The technique
isbased onthe numerical application of
Kirchof’s law for the selective detection and
lta high-speed isolation ofa faulty
section ofthe busbar.
‘The analysis is carried aut inthe Central,
Unit (CU) which communicates withthe
Peripheral Unit (PU) to gather current
information from individual circuits
‘and to implement the tripping of circuits as
required. This reliable, high speed
‘communication is achieved vie a direct
‘optical connection at 2.5 Mbps.
To ensure the adaptability ofthe relay to any
typeof busbar configuration, the P740 is
but witha universal topology processing
algorithm. This algorithm determines the |
‘optimum tripping zone based on the current
status ofthe plant isolators and circuit
breakers. =a i"
‘The P740 employs biased differential
algorithms, in which the differential current
is compared with a bias current, This
characteristic ensures stability of the
protection for external faults, even with
differing CT tolerance and etrors, which
ould lead to spurious operation.
CT saturation dete:
To increase the security of te differential
protection the biased differential elements
supervised by a biased global check zone
clement. This ensures stability, even under
an erroneous status ofthe auxiliary contact
of plant isolators and circuit breakers.
‘The MICOM ALSTOM P740 also employs CT
supervision and an innovative, ura high
speed, secure CT saturation detection
algorithm. This ensures stability when CTs
‘become saturated, particularly under
external fault conditions. This algorithm
combines a simulation of the fx built up in
the core of the CTs with a recursive
consistence variation control. This technique
can detect CT saturation in less than 2 ms.
ew at aml oh + ye
pentane bath Porm OF BE
bh bh thd
2s ciferent
crisisDual characteristics
To provide stability for severe through faults
‘and a the same time detect low current
internal faults, the Pr40 is equipped with
‘dual characteristics: one phase segregated
ifferential protection and another sensitive
earth curent differential protection.
Multiple tripping criteria
‘The P740 maintains the highest level of
stability under al conditions, including
hardware failure and incoherent signals
applied from an external plant or generated
by the power sytem. Any tripping order
must be made conditional tothe
simultaneous occurrence of 7 to 9 criteria:
Magnitude criteria requires confirmation of
‘two simultaneous thresholds per zone:
+ Exceeding the bas slope characteristic (k2)
«Exceeding the differential operating current
threshold (1D>2)
Check zone supervision
‘The zone element(s) are only permited to
tp ifthe order is confirmed by the check
zone element:
«Exceeding the bias slope characteristic
cz)
+ Exceeding differential operating current
threshold (IDCZ>2)
. =
oo
mi
at)
Signal quality criteria Continuous supervision of current
No CT saturation detected
+ Curtent variation detected on at least two
PUs (except for dead bus)
circuits
The P40 detects any abnormality in the
current circuit by continuously monitoring it
Under normal operating conditions the
Time or angular citer ifereial current wil be negligible, An
The measurement elements on samples analy is detected at a theshold,1D>3,
are taken at 1200 He, where the first Which can beset to alarm from 20 A
‘sample is taken forthe initial measurement
{and a second sample fr trip confirmation.
primary,
Differential current settings
When switching operations are carried out
in the substation, incorrect topology replicas
‘may occur. Inthis case, adiferential current
appears. The differential elements of the
Pao are allowed to operate only ifthe
differential current reaches a threshold 1D>2
which is normally set above the highest load
current.
Local riteria (optional):
‘The PUs can be set to only authorise tripping
if there is confirmation by local overcurrent
criteria or undervltage or zero sequence
‘overvaltage.
Dead zone or blind spot protection
‘The curent wansformers or the open
breakers surrounding the busbars define the
limits of the main zones, When a feeder