and function modules can be used for the implementation. Some sources recommend a delay of up to a few minutes after a trip of the network protection during a fault on the network before reclosing. Therefore, a release signal according to Figure 6 for reclosing, is necessary and specified for power plants connected to the medium voltage network The reclosure is enabled if:
A specified time has passed after the trip
The network frequency is within a given range The three line to line voltages of the network are above 95% of their nominal value