Activities during Aberdeen visit on 22 January to 5 February 2015.

1. 22 January 2015: Introduction to Oceaneering ACET phase 2 team member.


2. 23 January 2015: Weekly progress ACET meeting Unit 21
3. 26 - 27 January 2015: ACET Core Training
4. 29 January 2015: ACET Creating an Item Training (overview drawing, naming of line
item, creating new item, creating material page, creating features, changing material
page at feature level)
5. 30 January 2015: ACET Corrosion Circuits Training (corrosion under insulation, naming
conventions, identifying corrosion circuit, assigning items to corrosion circuit)
6. 30 January 2015: ACET Spring Hanger Training (register spring hanger, spring hanger
inspection)
7. 2 February 2015: ACET PMC Training (creating new PMC, relationship between material
page, editing PMC, validating PMC)
8. 3 February 2015: ACET Vendor Skid Training (building new equipment item, building
new item features)
9. 3 February 2015: ACET Deadlegs Training (deadleg definition, creating deadleg in
ACET, naming convention of deadleg)
10. 3 February 2015: ACET Workpack Training (creating workpack, validate workpack in
ACET, creating file)
11. 4 February 2015: ACET Inspection Report Training (Creating Inspection report in ACET,
download and upload inspection report in ACET)
12. 5 February 2015: Weekly Meeting ACET phase 2.
Between training, I also have discussion with Oceaneering ACET phase 2 regarding
building ACET for onshore Tangguh. Discussion is about inspection method/interval and
progress update of the RBA process.