Vous êtes sur la page 1sur 13

CIVIL PORTIC FIC - UNCP

DISEO A ESCALA DE PORTICO ARMADO


PARA EL CONCURSO DE CIVIL PORTIC
DE LA FIC UNCP 2015

INTEGRANTES:
1.
2.
3.
4.
5.
6.
7.
8.

BORJA TORRES MIJAIL


CASTAEDA INGA RICHARD
COLONIO ARROYO ERICK
FLORES FLORES EBER ROLY
FLORES PAUCAR DAVID
MARTINES AHUI JHONATAN
QUISPE BONIFACIO PIET
VILLALVA CONDOR ANIBAL

FECHA:

15/09/2015

HYO - 2015

Tabla de contenido
I.

METRADOS ........................................................................................................... 3

II. PRESUPUESTOS .................................................................................................... 5


III. DISEO ESTRUCTURAL ........................................................................................ 6
V.

DISEO DE MEZCLAS ......................................................................................... 10

VI. PROCESO CONSTRUCTIVO ................................................................................. 11


VII. PROGRAMACION (PARA LA EJECUCION) ........................................................... 12

DISEO A ESCALA DE PORTICO ARMADO PARA EL CONCURSO DE


CIVIL PORTIC DE LA FIC UNCP 2015

I. METRADOS
FIERROS

ESTRIBOS:
VIGA
COLUMNA

NUMERO
17
28

MEDIDA (m)
0.34
0.26

TOTAL (m)
5.78
7.28
13.06

LONG-TRANS:
VIGA PIEZA 1
VIGA PIEZA 2
COLUMNA

NUMERO
2
2
8

MEDIDA (m)
2
1.82
1.35

TOTAL (m)
4
3.64
10.8
18.44

TOTAL

31.5

MADERA
LISTONES
CANTIDAD
4
4
4
4
12

LARGO (m)
1.65
0.64
0.5
0.4
0.18

PARCIAL (m)
6.6
2.56
2
1.6
2.16

TOTAL

14.92

LARGO (m)
0.64
0.5
0.64
1.5
1.5

CANTIDAD
2
2
4
2
1

TOTAL

1.3864

TRIPLAY
ANCHO (m)
0.18
0.18
0.1
0.14
0.2

PARCIAL (m2)
0.2304
0.18
0.256
0.42
0.3

DISEO A ESCALA DE PORTICO ARMADO PARA EL CONCURSO DE


CIVIL PORTIC DE LA FIC UNCP 2015

DISEO A ESCALA DE PORTICO ARMADO PARA EL CONCURSO DE


CIVIL PORTIC DE LA FIC UNCP 2015

II. PRESUPUESTOS

ANLISIS DE COSTOS
MATERIAL
CEMENTO
PIEDRA CHANCADA 1/4
AGREGADO FINO
ACERO CORRUGADO 1/4
ALAMBRE
LISTONES
TRIPLAY
CLAVOS

UND.
Kg
m3
m3
m
Kg
m
m2
Kg

CANTIDAD
18.61
0.014
0.020
26.4
1.5
14.92
1.3864
0.5

P.U
0.47
23.53
40
0.66
4
1.03
0.14
0.14
TOTAL

PARCIAL
8.7467
0.32942
0.8
17.424
6
15.3676
0.194096
0.07
S/. 48.93

Fuente: Catalogo de SODIMAC, ACEROS AREQUIPA

DISEO A ESCALA DE PORTICO ARMADO PARA EL CONCURSO DE


CIVIL PORTIC DE LA FIC UNCP 2015

III. DISEO ESTRUCTURAL


3.1 PREDIMENSIONAMIENTO Y DATOS:
LUZ LIBRE = 1.50m
W servicio = 1 ton
DATOS DE LA PROBETA:

PESO UNITARIO DE LAS PROBETAS


(pulg)
6
12

(cm)
15.24
30.48

V (m3)

0.00556

P(Kg)

12.78800

(m)
0.1524
0.3048

30

Repartida de la siguiente manera:

DISEO A ESCALA DE PORTICO ARMADO PARA EL CONCURSO DE


CIVIL PORTIC DE LA FIC UNCP 2015

VIGA:
Viga: b*d = 10*14 cm2
Columna: b*d = 10*10 cm2
fc = 210 kg/cm2

COLUMNA:
Para el predimensionamiento de la columna se considerara el ancho de la base de la viga para
cada lado o sea columna de C- (0.1*0.1)

3.2 DISEO POR FALLA DUCTIL:


ANLISIS EN EL PROGRAMA SAP-2000 FUERZA CORTANTE Y MOMENTO FLECTOR

DISEO A ESCALA DE PORTICO ARMADO PARA EL CONCURSO DE


CIVIL PORTIC DE LA FIC UNCP 2015

= 21/4" = 0.64 cm2 .ok!

DISEO A ESCALA DE PORTICO ARMADO PARA EL CONCURSO DE


CIVIL PORTIC DE LA FIC UNCP 2015

DISEO DE REFUERZO POR CORTE:

Calculo de la cortante actuante en la cara de la columna


658 kg= fuerza cortante en la cara de la columna
Cortante ultima de diseo
= 658
Corte que toma el concreto
= 0.53 210 10 11
= 845
= 718.25
Requiere o no acero en los estribos?
<
658 < 718.25
No requiere acero pero por proceso constructivo se colocara acero mnimo que
recomienda la norma 14 "
Usar estribos:
1 14 @3, 3 14 @5,

14 @10

2 14"

: 1 14 @3, 3 14 @5, 14 @10

2 14"

DISEO A ESCALA DE PORTICO ARMADO PARA EL CONCURSO DE


CIVIL PORTIC DE LA FIC UNCP 2015

V. DISEO DE MEZCLAS

DISEO A ESCALA DE PORTICO ARMADO PARA EL CONCURSO DE


CIVIL PORTIC DE LA FIC UNCP 2015

10

VI. PROCESO CONSTRUCTIVO


1. Medidas de seguridad de obra
2. Zonificacin y limpieza del terreno
3. Replanteo de las zapatas
4. Excavacin para zapatas
5. Habilitacin y armado del fierro estructural para vigas y
columnas
6. Habilitacin y armado del encofrado para vigas y columnas
7. Nivelacin y aplomado de las columnas y viga
8. Dosificacin de Mezcla para el concreto
9. Hormigonado de las zapatas, columnas y viga
10. Limpieza de terreno pos vaciado
11. Curado de prtico
12. Desencofrado del prtico

DISEO A ESCALA DE PORTICO ARMADO PARA EL CONCURSO DE


CIVIL PORTIC DE LA FIC UNCP 2015

11

DISEO A ESCALA DE PORTICO ARMADO PARA EL CONCURSO DE


CIVIL PORTIC DE LA FIC UNCP 2015

18
19
20
21

8
12
13
14
15
16
17

ITEM

5
6
6.1
6.2
6.3
7
7.1
7.2
7.3

ITEM

1
2
3
4

ITEM

1
09:00 a.m.

T.E (min)
20
10
15
20
30
30
20
10
4
9
15
10

FABRICACION DE ARMADURA

PROCESO
ARMADO DE LA MESA PARA LA TRAMPA
MEDIDA Y MARCA EN LAS BARRAS DE COLUMNAS
CORTE DE PIEZAS PARA SOLO LA COLUMNAS
CORTE DE FIERROS PARA ESTRIBOS DE COLUMNAS
DOBLADO DE ESTRIBOS DE COLUMNAS
ARMADADO DE LAS COLUMNAS
PUESTA EN OBRA
MEDIDA Y MARCA EN LAS BARRAS PARA LA VIGA
CORTE DE FIERROS PARA ESTRIBOS DE LA VIGA
DOBLADO DE ESTRIBOS DE LA VIGA
ARMADADO DE LA VIGA
PUESTA EN OBRA

INICIO:

3
09:00 a.m.

16

12

24

T.E (acum) CUADRILLA PERSONAL HORA


9 0
2
3
20
9 20
2
3
30
9 30
2
3
45
9 45
2
3
65
10 5
2
3
95
10 35
2
3
125
11 5
2
3
145
11 25
2
3
155
11 35
2
3
159
11 45
2
3
168
11 49
2
3
183
11 58
2
3
193

VIGA

COLUMNAS:

HORA
9 20
9 30
9 45
10 5
10 35
11 5
11 25
11 35
11 45
11 49
11 58
12 13

11 45 PITER-JHONATAN-RICHARD
11 50 PITER-JHONATAN-RICHARD
12 0 PITER-JHONATAN-RICHARD

0
45
50

11
11
11

2
2
2

2
2
2

125
130
140

45
5
10

CUADRILLA:

LO REALIZARAN AMBOS Y SI ES NECESARIO PODRAN REQUERIR UNO MAS, SE PRIORIZA LA CONFECCION DEL ENCOFRADO DE COLUMNAS
10 45 PITER-JHONATAN-RICHARD
LO REALIZARAN AMBAS PERSONAS ASIGNADAS
10 55 PITER-JHONATAN-RICHARD
LO REALIZARAN CUADRILLLA 2 Y 4 DESPUES DE 1 HORA DEL BASEADO DE ZAPATAS
11 5 PITER-JHONATAN-RICHARD

15
45
55

9
10
10

2
2
2

2
2
2

60
70
80

ROLY - ANIBAL
ROLY - ANIBAL
ROLY - ANIBAL- ERICK
ROLY - ANIBAL- ERICK
ROLY - ANIBAL- ERICK
ROLY - ANIBAL- ERICK
ROLY - ANIBAL- ERICK
ROLY - ANIBAL- ERICK
ROLY - ANIBAL- ERICK
ROLY - ANIBAL- ERICK
ROLY - ANIBAL- ERICK

RESPONSABLES

LO REALIZARA LOS ENCARGADOS AL INICIO, LUEGO PODRA RECIBIR AYUDA


LO REALIZARAN AMBOS C/U REALIZARA UNA BARRA, RECIBIRAN AYUDA
LO REALIZARAN AMBOS C/U REALIZARA UNA BARRA, RECIBIRAN AYUDA
LO REALIZARAN 4 PERSONAS , SI ES NECESARIO SE PODRA REQUERIR MAS

LO REALIZARAN AMBOS C/U REALIZARA UNA BARRA


LO REALIZARAN AMBOS C/U REALIZARA UNA BARRA
LO REALIZARAN AMBOS C/U REALIZARA UNA BARRA
LO REALIZARAN AMBAS PERSONAS ASIGNADAS
PARA ESTE ITEM LOS DESIGNADO A LA EXCAVACION CONTRIBUIRAN A LOS YA DESIGNADOS
LO REALIZARAN LAS 4 PERSONAS

OBSERVACION

LO REALIZARA LOS ENCARGADOS AL INICIO, LUEGO PODRA RECIBIR AYUDA

LO REALIZARAN AMBOS

60
10
10

PITER-JHONATAN

9 20

OBSERVACION

RESPONSABLES

20

HORA

20

TRAZO GUIA EN TRIPLAY PARA VIGA Y COLUMNAS


CORTE DE PIEZAS COLUMNAS
ARMADO DE ENCOFRADO DE COLUMNAS
ACONDICIONAMINETO DE PIEZAS DE COLUMNAS
PUESTA EN OBRA COLUMNAS
CORTE DE PIEZAS PARA VIGA
ARMADO DE ENCOFRADO DE VIGA
ACONDICIONAMINETO DE PIEZAS
PUESTA EN OBRA VIGA

T.E (acum) CUADRILLA PERSONAL HORA

SOLO 2 m2
TRATAR DE REALIZAR JUNTO CON EL ITEM 1
LO REALIZARAN AMBOS
CADA PERSONA REALIZARA UNA ZAPATA

ERICK - RICHARD
ERICK - RICHARD
ERICK - RICHARD
ERICK - RICHARD

T.E (min)

HABILITACION DE ENCOFRADO

OBSERVACION

RESPONSABLES

INICIO

2
09:00 a.m.

T.E (acum) CUADRILLA PERSONAL H.INICIO H. FINAL


1
0
9 0 9 5
2
1
5
9 5 9 10
2
1
10
9 10 9 15
2
1
15
9 15 9 20
2
1
20

PROCESO

INICIO:

CUADRILLA:

T.E (min)
0
5
5
5
5

MOVIMIENTO DE TIERRAS

PROCESO
INICIO
LIMPIEZA DE TERRENO Y REMOCION DE ESCOMBROS
NIVELACION Y COMPACTACION DE TERRENO
TRAZO Y REPLANTEO
EXCAVACION DE ZAPATAS

INICIO:

CUADRILLA:

VII. PROGRAMACION (PARA LA EJECUCION)

12

DISEO A ESCALA DE PORTICO ARMADO PARA EL CONCURSO DE


CIVIL PORTIC DE LA FIC UNCP 2015

13

22
23
24
25

ITEM

18
19
20
21

8
12
13
14
15
16
17

ITEM

5
6
6.1
6.2
6.3
7
7.1
7.2
7.3

ITEM

3
09:00 a.m.

4
11:15 a.m.

149

T.E (min)
149
10
7
7
7

PREPARADO DE MEZCLA

PROCESO
INICIO
VERIFICACION DE MATERIALES
METRADOS DE REQUERIMIENTO PARA TANDA 1
PREPARACION DE LA 1 TANDA
COLOCADO DE LA PRIMERA TANDA

INICIO:

CUADRILLA:

T.E (min)
20
10
15
20
30
30
20
10
4
9
15
10

FABRICACION DE ARMADURA

PROCESO
ARMADO DE LA MESA PARA LA TRAMPA
MEDIDA Y MARCA EN LAS BARRAS DE COLUMNAS
CORTE DE PIEZAS PARA SOLO LA COLUMNAS
CORTE DE FIERROS PARA ESTRIBOS DE COLUMNAS
DOBLADO DE ESTRIBOS DE COLUMNAS
ARMADADO DE LAS COLUMNAS
PUESTA EN OBRA
MEDIDA Y MARCA EN LAS BARRAS PARA LA VIGA
CORTE DE FIERROS PARA ESTRIBOS DE LA VIGA
DOBLADO DE ESTRIBOS DE LA VIGA
ARMADADO DE LA VIGA
PUESTA EN OBRA

INICIO:

CUADRILLA:
16

12

24

T.E (acum)C UADRILLA PERSONAL HORA


4
149
11 50
2
4
159
11 60
2
4
166
12 7
2
4
173
12 14
2
4
180

T.E (acum) CUADRILLA PERSONAL HORA


9 0
2
3
20
9 20
2
3
30
9 30
2
3
45
9 45
2
3
65
10 5
2
3
95
10 35
2
3
125
11 5
2
3
145
11 25
2
3
155
11 35
2
3
159
11 45
2
3
168
11 49
2
3
183
11 58
2
3
193

VIGA

COLUMNAS:

OBSERVACION
LO REALIZARAN AMBOS
LO REALIZARAN LOS DESIGNADOS A ESTA LABOR
LO REALIZARAN AMBOS Y SI ES NECESARIO PODRAN REQUERIR UNO MAS
LO REALIZARAN LAS CUADRILLAS DESIGNADAS
BORJA - DAVID
BORJA - DAVID
BORJA - DAVID
BORJA - DAVID
11 60
12 7
12 14
12 21

LO REALIZARA LOS ENCARGADOS AL INICIO, LUEGO PODRA RECIBIR AYUDA


LO REALIZARAN AMBOS C/U REALIZARA UNA BARRA, RECIBIRAN AYUDA
LO REALIZARAN AMBOS C/U REALIZARA UNA BARRA, RECIBIRAN AYUDA
LO REALIZARAN 4 PERSONAS , SI ES NECESARIO SE PODRA REQUERIR MAS

LO REALIZARAN AMBOS C/U REALIZARA UNA BARRA


LO REALIZARAN AMBOS C/U REALIZARA UNA BARRA
LO REALIZARAN AMBOS C/U REALIZARA UNA BARRA
LO REALIZARAN AMBAS PERSONAS ASIGNADAS
PARA ESTE ITEM LOS DESIGNADO A LA EXCAVACION CONTRIBUIRAN A LOS YA DESIGNADOS
LO REALIZARAN LAS 4 PERSONAS

OBSERVACION

RESPONSABLES

ROLY - ANIBAL
ROLY - ANIBAL
ROLY - ANIBAL- ERICK
ROLY - ANIBAL- ERICK
ROLY - ANIBAL- ERICK
ROLY - ANIBAL- ERICK
ROLY - ANIBAL- ERICK
ROLY - ANIBAL- ERICK
ROLY - ANIBAL- ERICK
ROLY - ANIBAL- ERICK
ROLY - ANIBAL- ERICK

RESPONSABLES

HORA

HORA
9 20
9 30
9 45
10 5
10 35
11 5
11 25
11 35
11 45
11 49
11 58
12 13

LO REALIZARA LOS ENCARGADOS AL INICIO, LUEGO PODRA RECIBIR AYUDA

11 45 PITER-JHONATAN-RICHARD
11 50 PITER-JHONATAN-RICHARD
12 0 PITER-JHONATAN-RICHARD

0
45
50

11
11
11

2
2
2

LO REALIZARAN AMBOS

2
2
2

PITER-JHONATAN

125
130
140

9 20

45
5
10

LO REALIZARAN AMBOS Y SI ES NECESARIO PODRAN REQUERIR UNO MAS, SE PRIORIZA LA CONFECCION DEL ENCOFRADO DE COLUMNAS
10 45 PITER-JHONATAN-RICHARD
LO REALIZARAN AMBAS PERSONAS ASIGNADAS
10 55 PITER-JHONATAN-RICHARD
LO REALIZARAN CUADRILLLA 2 Y 4 DESPUES DE 1 HORA DEL BASEADO DE ZAPATAS
11 5 PITER-JHONATAN-RICHARD

OBSERVACION

15
45
55

RESPONSABLES

9
10
10

HORA

2
2
2

20

2
2
2

20

TRAZO GUIA EN TRIPLAY PARA VIGA Y COLUMNAS


CORTE DE PIEZAS COLUMNAS
ARMADO DE ENCOFRADO DE COLUMNAS
ACONDICIONAMINETO DE PIEZAS DE COLUMNAS
PUESTA EN OBRA COLUMNAS
CORTE DE PIEZAS PARA VIGA
ARMADO DE ENCOFRADO DE VIGA
ACONDICIONAMINETO DE PIEZAS
PUESTA EN OBRA VIGA

T.E (acum) CUADRILLA PERSONAL HORA

60
70
80

60
10
10

T.E (min)

HABILITACION DE ENCOFRADO

INICIO

2
09:00 a.m.

PROCESO

INICIO:

CUADRILLA: