Vous êtes sur la page 1sur 1

IKEA Cheras Main Building Works

STAFF OFFICE

MCD notes following inspection

03.11.15

Itemno.

Datesnaged

Raised

AREAS

Particular

1
2

03-Nov-15
03-Nov-15

IKEA
IKEA

Com-in & Office


Com-in & Office

AC Ducting
Speakers

03-Nov-15

MCD

Learning centre

Floor

02-Nov-15

MCD

Corridor

Floor

02-Nov-15

MCD

IT Training room

Floor

02-Nov-15

MCD

IT Training room

Ceiling

03-Nov-15

MCD

IT Training room

Alum window

8
9

03-Nov-15
02-Nov-15

MCD
MCD

IT Training room
Sales HQ

Alum door
Vinyl skirting

10

03-Nov-15

MCD

Sales HQ

Alum window

Itemdescription

11

03-Nov-15

MCD

Sales HQ

Alum door

AC diffuser with ties.


Speaker not level
Patch on floor holes with protuding
rebar.
Remove residue and polish floor
Floor at bottom door (closing
position) to even and smooth.
Ceiling tiles surrounding AC to be
replaced due to wet marks.
Aluminum edge to wall make nice
with acrylic or other medium.
Door stopper to install
Straighten wavy vinyl skirting
Aluminum edge to wall make nice
with acrylic or other medium.
Door stopper to install

12

03-Nov-15

MCD

Cash office

Ceiling

Defects ceiling tiles to be replaced.

13

03-Nov-15

IKEA

Cash office

Smoke detector Cover missing

14

03-Nov-15

MCD

Cash office

15

03-Nov-15

MCD

Cash office

16

03-Nov-15

MCD

Office storage

17

03-Nov-15

IKEA

18

03-Nov-15

IKEA

Type

Resp

Accounted

Dateplannedto
complete

STATUS

Defect
Defect

Progress
KEMJ

Mick
Mick

6-Nov-15
6-Nov-15

Done
Done

Defect

Zachlim

Bayne

6-Nov-15

Done

Defect

MCD

Bayne

8-Nov-15

Done

Defect

Zachlim

Bayne

6-Nov-15

Done

Defect

Hatori

Bayne

8-Nov-15

Done

Defect

Masterskill

Bayne

7-Nov-15

Done

Defect

Hatori

Bayne

8-Nov-15

Open

Incomplete

KEMJ

Mick

8-Nov-15

Done

Bayne

9-Nov-15

Open

Defect

MCD

Bayne

7-Nov-15

Done

Defect
Defect

Masterskill
MCD

Bayne
Bayne

7-Nov-15
7-Nov-15

Done
Done

Defect

MCD

Bayne

7-Nov-15

Done

Metal door
frame
Wall socket
Metal door
frame

Edging to make to nice.

Defect

DuoDex

Wall socket cover loose

Defect

KEMJ

Mick

7-Nov-15

Done

Edging to make to nice.

Defect

DuoDex

Bayne

6-Nov-15

Done

Office storage

Ceiling

Close all gaps on ceiling tile system

Defect

Hatori

Bayne

8-Nov-15

Open

Storage

Ceiling

Close all gaps on ceiling tile system

Defect

Hatori

Bayne

7-Nov-15

Done

Defect

MCD

Bayne

7-Nov-15

Done

Defect

Masterskill

Bayne

7-Nov-15

Done

Defect

Hatori

Bayne

7-Nov-15

Done

Defect

MCD

Bayne

7-Nov-15

Done

Defect
Defect

Masterskill
Edlamb

Bayne
Amirul

7-Nov-15
6-Nov-15

Done
Done

Defect

DuoDex

Bayne

6-Nov-15

Done

Incomplete

Edlamb

Amirul

6-Nov-15

Done

Defect

DuoDex

Bayne

9-Nov-15

Open

Incomplete
Variation

MCD
MCD

Bayne
Amirul

9-Nov-15
9-Nov-15

Open
Open

Defect

Hatori

Bayne

8-Nov-15

Open

19

03-Nov-15

MCD

Storage

Alum window

20

03-Nov-15

MCD

Storage

Alum door

21

03-Nov-15

MCD

P-Tag

Ceiling

22

03-Nov-15

MCD

P-Tag

Alum window

23
24

03-Nov-15
03-Nov-15

MCD
MCD

P-Tag
Medical room

25

03-Nov-15

MCD

26

03-Nov-15

MCD

27

03-Nov-15

MCD

28
29

03-Nov-15
03-Nov-15

IKEA
IKEA

Alum door
Wash basin
Metal door
Medical room
frame
Medical room
Floor drain
Metal door
Storage & Archive
frame
Storage & Archive Wall
Staff Prayer room Tiling

30

03-Nov-15

MCD

Staff Prayer room Ceiling

Aluminum edge to wall make nice


with acrylic or other medium.
Door stopper to install
Damaged ceiling tiles to be
replaced.
Aluminum edge to wall make nice
with acrylic or other medium.
Door stopper to install
Sensor wirings
Edging to make to nice.
floor drain grille cover

Close all gaps on ceiling tile system

Edging to make to nice.


Painting
floor tilings

31

03-Nov-15

MCD

Training room

Door

32

03-Nov-15

MCD

Training room

Ceiling

Door gaps with vinyl floor. Grind off


bottom door.
Replace damaged ceiling tiles

33

03-Nov-15

MCD

Training room

Ceiling

Close all gaps on ceiling tile system

34

03-Nov-15

MCD

Training room

Floor

35

03-Nov-15

IKEA

Training room

Cable tray

36

03-Nov-15

MCD

Training room

Wall paper

37

03-Nov-15

IKEA

Training room

Door

38

03-Nov-15

IKEA

Training room

Wall

39

03-Nov-15

IKEA

Training room

40

03-Nov-15

IKEA

Steel staircase

41

03-Nov-15

IKEA

Corridor

42
43

03-Nov-15
03-Nov-15

IKEA
IKEA

Office open area


Corridor

44

03-Nov-15

MCD

Steel staircase

45

03-Nov-15

MCD

Steel staircase

46

03-Nov-15

MCD

Corridor

Concrete residue to remove at


column corner. - Drywall
constructed to mask this
Cable tray exposed to server room,
mask on walls. - Drywall constructed
to mask this
Wall paper still wet. Check curing
Knob closer to be switch inside
room rather than outside
Wall uneven surface bottom to floor

Drywall and Concrete wall not


flushed
Wall
Wall touch-up painting
Protuding PVC pipe to cut flush with
Wall
wall
Faay wall
Electrical provision to be installed
Wall protection Bolt heads are bulky
Cover gaps on concrete floor to first
Stair
thread step
Walls going to AS-IS require reStair
painting on cosmetic damage;
Wall bottom corner damaged. Need
Wall
to rectify;
Wall

Defect

DuoDex

Bayne

9-Nov-15

Open

Defect

Hatori

Bayne

9-Nov-15

Open

Defect

Hatori

Bayne

6-Nov-15

Open

Defect

MCD

Bayne

9-Nov-15

Done

Defect

MCD

Stuart

7-Nov-15

Done

Defect

MCD

Bayne

6-Nov-15

Done

Defect

DuoDex

Bayne

10-Nov-15

Open

Defect

MCD

Bayne

9-Nov-15

Open

Defect

Hatori

Bayne

9-Nov-15

Open

Defect

MCD

Bayne

9-Nov-15

Open

Defect

MCD

Bayne

7-Nov-15

Done

Incomplete
Design

KEMJ
KEMJ

Bayne
Bayne

9-Nov-15
9-Nov-15

Open
Open

Defect

MCD

Bayne

9-Nov-15

Open

Defect

MCD

Bayne

9-Nov-15

Open

Defect

MCD

Bayne

7-Nov-15

Done

Vous aimerez peut-être aussi