Vous êtes sur la page 1sur 1

NARASARAOPETA INSTITUTE OF TECHNOLOGY::NARASARAOPET

DEPARTMENT OF BUSINESS ADMINSTRATION

3rd YEAR B.TECH, 2ndSEMESTER, B. Tech., ME., BRANCH


SUB.NAME: IEM

UNIT NO
UNIT I

UNIT II

UNIT III

UNIT IV

UNIT V

UNIT - VI

FACULTY.NAME:R.RAVIKANTH
NO.OF.CLAS
SES
REQUIRED
INTRODUCTION:
1
DEFINITION OF INDUSTRIAL ENGINEERING (I.E),
1
DEVELOPMENT, APPLICATIONS,
1
ROLE OF AN INDUSTRIAL ENGINEER,
1
DIFFERENCES BETWEEN PRODUCTION MANAGEMENT AND INDUSTRIAL
2
ENGINEERING,
QUANTITATIVE TOOLS OF IE AND PRODUCTIVITY MEASUREMENT.
2
CONCEPTS OF MANAGEMENT,
1
IMPORTANCE, FUNCTIONS OF MANAGEMENT, SCIENTIFIC MANAGEMENT,
2
TAYLORS PRINCIPLES, THEORY X AND THEORY Y
2
FAYOLS PRINCIPLES OF MANAGEMENT.
1
PLANT LAYOUT:
2
FACTORS GOVERNING PLANT LOCATION, TYPES OF PRODUCTION LAYOUTS
1
ADVANTAGES AND DISADVANTAGES OF PROCESS LAYOUT AND PRODUCT
2
LAYOUT,
APPLICATIONS, QUANTITATIVE TECHNIQUES FOR OPTIMAL DESIGN OF LAYOUTS,
1
PLANT MAINTENANCE, PREVENTIVE AND BREAKDOWN MAINTENANCE.
2
OPERATIONS MANAGEMENT:
1
IMPORTANCE, TYPES OF PRODUCTION, APPLICATIONS,
2
WORK-STUDY, METHOD STUDY, TIME STUDY,
1
WORK SAMPLING, PMTS, MICRO-MOTION STUDY,
2
RATING TECHNIQUES, MTM,
1
WORK FACTOR SYSTEM, PRINCIPLES OF ERGONOMICS,
1
FLOW PROCESS CHARTS, STRING DIAGRAMS AND THERBLIGS.
2
STATISTICAL QUALITY CONTROL:
1
QUALITY CONTROL, ITS IMPORTANCE
2
SQC, ATTRIBUTE SAMPLING INSPECTION WITH SINGLE
1
DOUBLE SAMPLING, CONTROL CHARTS
2
X AND R CHARTS X AND S CHARTS
1
THEIR APPLICATIONS, NUMERICAL EXAMPLES.
2
TOTAL QUALITY MANAGEMENT:
1
ZERO DEFECT CONCEPT, QUALITY CIRCLES, IMPLEMENTATION,
2
APPLICATIONS, ISO QUALITY SYSTEMS.
1
SIX SIGMA DEFINITION, BASIC CONCEPTS
1
RESOURCE MANAGEMENT:
1
CONCEPT OF HUMAN RESOURCE MANAGEMENT
2
PERSONNEL MANAGEMENT AND INDUSTRIAL RELATIONS
1
FUNCTIONS OF PERSONNEL MANAGEMENT,
2
JOB-EVALUATION, ITS IMPORTANCE AND TYPES
1
MERIT RATING, QUANTITATIVE METHODS
2
WAGE INCENTIVE PLANS, TYPES.
1
VALUE ANALYSIS:
1
VALUE ENGINEERING, IMPLEMENTATION PROCEDURE
2
ENTERPRISE RESOURCE PLANNING, SUPPLY CHAIN MANAGEMENT.
1
PROJECT MANAGEMENT:
2
PERT, CPM DIFFERENCES & APPLICATIONS, CRITICAL PATH
1
DETERMINATION OF FLOATS, IMPORTANCE, PROJECT CRASHING, SMOOTHING
2
AND NUMERICAL EXAMPLES.
TOTAL
65
TOPIC

TEXT BOOKS:
1. INDUSTRIAL ENGINEERING AND MANAGEMENT BY O.P KHANNA, KHANNA PUBLISHERS.
2. INDUSTRIAL ENGINEERING AND PRODUCTION MANAGEMENT, MARTAND TELSANG, S.CHAND & COMPANY
LTD. NEW DELHI.
REFERENCE BOOKS:
1. INDUSTRIAL MANAGEMENT BY BHATTACHARYA DK, VIKAS PUBLISHERS.
2. OPERATIONS MANAGEMENT BY J.G MONKS, MCGRAWHILL PUBLISHERS.

SIGNATURE OF FACULTY

H.O.D

Vous aimerez peut-être aussi