ARAR INFRASTRUCTURE PROJECT

CONSULTANT:DAR AL RIYADH

SUB:MECHANICAL SITE INSTRUCTION&NCR


CONTRACTOR:MASCO

S.NO

REF.NO

SUBJECT

1
2
3
4
5
6
7
8

M0
M1
M2
M3
M4
M5
M6
M7

HDPE Pipe Butt fusion welding


Un approved fiiting at store
Separate sleve providing crossing to other services
Separate sleve providing crossing to other services
Unproper joints under electrical services
Installation of pipe not as per the procedure
closing the water pipes without pressure test
Damage of pipe& welding of HDPE pipe during excavation

Date

30/07/2015

CLIENT:MOH
RELEASE CLOSED
DATE
DATE
17/03/2015
22/03/2015
14/04/2015
28/04/2015
29/04/2015
29/04/2015
29/04/2015
25/07/2015

N.C.R
S.NO

REF.NO

SUBJECT

RELEASE
DATE

M-NC1

Providing seprate sleve b/w Mechanical &other services @


crossing

19/04/2015

CLOSED
DATE

30/07/2015

ENT:MOH
STATUS
Open
Open
Open
Open
Open
Open
Open
Open

STATUS
Open