USAN DAILY PRODUCTION REPORT

USAN ~

02 October 2013

PRODUCTION LOG:
- Production impacted by PSHH in south right riser due to closure of both manifold valves (instnument cause)

PRODUCTION (OOhOO .24hOO)


Dallv Production
Gas
Crude
(MMScf)
lbarrels)

Water
(barrels)

131,254

114.52

2,623.70

Time Open
(hrs)

Chk

SSW

(%)

(%)

GOR
(Scflbbl)

Producers
- Estimated well f10wrate allocation
Well name

DPR

DCD/GSR

FOPS

Reservoir

Crude

Water

(bbls)

(bbls)

Gas
(MMScO

BHFP
(bar)

BHFT

'M-lP

('C)

(bar)

'M-lT
('C)

Usan-21

US N-2 11

PN1A

R630

9.446.07

0.00

19_62

24.00

100.00

0.0

2077 40

107.67

79.69

5416

64.89

Usan-13

USN-214

PN1D

R630

8.259.19

0.00

6,49

24.00

44.20

0.0

786.04

14554

92.76

64.88

77.92

Usan-17

USN-231

PN3A

R500

7.3196

0.00

12.33

24.00

100.00

0.0

1.684

86.06

7 0 50

46_35

58.84

Usan-16

USN -232

PN3B

R500

10.920.1

1.631.74

12.26

24.00

99.67

13.0

1,123

11 0.50

79 63

48_85

68.56
62.81

Usan-32

USN-234

PN3D

R500

19.629.7

000

29.76

2400

99.85

0.0

1,516

14314

7417

64_91

Usan-31

USN-41 2

PS1B

R670

15.353.7

000

4.74

24.00

99.87

0.0

309

176.90

83,40

52.61

75.97

Usan-14

USN-414

PS1D

R60S

7,547.1

0.00

593

23.55

99.05

0.0

786

118.57

72 .03

5506

62.00

Usan-ll

USN-423

PS 2C

R630

9.887.1

0.00

3.61

23.52

98 _53

0.0

365

122.44

68.53

55.33

60,46

Usan-28

USN-424

PS2D

R605

20.202.0

0.00

964

24.00

100 00

00

477

128 02

68.37

548 3

60.67

Usan-l 0

USN-432

PS3B

R630

1.190,4

210.08

0.40

23.48

98.71

15.0

337

133.29

71.15

55.76

50.02

Usan-18

USN-441

PS4A

R605

7,905.7

781.89

4.88

23.4 7

98.42

9. 0

618

126.05

68.53

57.87

60.83

Usan-26

USN-452

PS5B

R630

10.064.8

0.00

3.96

23.42

86.00

0.0

393

145.80

67.30

61.7 5

61.15

~1.~ USN-454

PS5D

R630

3.5284

000

089

2400

3623

00

253

14021

66.85

6412

56.85

WHT

BHFP
(bar)

BHrT
(0G)

INJECTION
Gas Injectors
- Shut-in of Usan-24 (Reservoir Constraint)

Well name

DPR

DCD/GSR

FOPS

Reservoil

Gas
(MMScO

Time

Open
(hrs)

Chk
(%)

WHP
(bar)

('G)

Usan-24

USN-511

GS1A

R630

0.0000

0.00

0.00

0.00

0.00

Usan-23

USN-521

GS2A

R630

34.9177

24.00

51.45

178.74

17.90

205.19

26.65

Usan -22

USN-532

GS3 R

R605

14.0198

24.00

29. 7 1

181.20

14.34

206.01

23.18

Usan-30

USN-53 1

GS3A

R670

50429

24 .00

1660

175.60

12.00

20590

3740

Usan-15
Usan-27

USN-551

GS5A

R630

5.3960

24.00

1449 .

153.38

3.27

16990

11.19

GS7A
Toial Gas Injection

R635

3.5668

24.00

18.12

158.01

2.37

180.55

23.88

Chk
(%)

WHP
(bar)

WHT

BHFP
(bar)

BHFT

(0G)

USN-571

~ ~

62.94

Water Injectors
- Water injection impacted by SIMOPS on USN-131
We n name

DPR

DCD/GSR

Usan- 19

USN-132

Usan 29

USN-341
WS4A
Total Water Injection

FOPS

I
I

Water
(bbls)

R50Q

000

000

R605

22.252

24.00

40.67

145

14

279

16

I
I

VVN3B

Tllne

Reservoi r

Open
(hrs)

(0C)

22,252

CRUDE TERMINAL (OShOO. OShOO)


Crude Lifting
Exported Quantity (barrels)
Specification
Daily C rude Prod uction (bbls )
Stock balance barrels
DV'JProduction Perform.lnceManagerVlu:

,,\

\\

Gas Production
Gas Injection
Fuel Gas

BSW(%
API

Flared Gas

135.876
1 287275

"'-

OW DGM Production llIsa: iJ~-

'/

GAS UTILISATION

ExC'cutlve Gener,-! t.l,:m.lger

MMScf
114.52
62 94
9 65
4192

ow Field Operations lJ iSv . "

........

~
"" .y-

~U