Tender reference: Doha Oasis Main Works Tender Package
Tenderer /
PMO
Question
Response
Question
Response
‘Question
Response
Question
Response
Question
Response
Description
Please confirm Garbage Chute Systems is covered under the
Provisional Sums. If not, please provide us Provisional Sum
‘amount to include in the BoQ.
Confirmed. Garbage chute system is covered under MEP section
in the Provisional sums.
Please provide an Item for car park wall and column protection to
include in the BoQ.
Please refer attached revised Bill page No. 02A/10 (Rev 2)
Please provide the quantity and details for water tank
waterproofing
‘The estimated quantity of the watertanks waterproofing is 11,000
m2, reference to related drawings for confirmation of quantities.
All waterproofing related works to be supplied from an approved
‘supplier and applied by approved applicator ( SIKA, BASF MAPEI
), and to follow approved supplier / applicator applicable
specifications accordingly
Please confirm Sub Station works are covered under the
Provisional Sums for MEP. If not, please provide us Provisional
‘Sum amount to include in the BoQ.
Confirmed
Kindly refer to Drawing no. SD 1011 — typical pile waterproofing
detail and specification section S14 Clause 6.2.3 ~ the drawing
mentioned PVC membrane sandwiched in tow layers of epoxy
hile the specification mentioned PVC waterstop img, Please
clarify and confirm which is to follow.
‘All waterproofing related works to be supplied from an approved
supplier and applied by approved applicator ( SIKA, BASF MAPEI
), and to follow approved supplier / applicator applicable
requirements accordingly. The Contractor to ensure that the pile
head treatment item under piling works Bilis priced inclusive of
the Contractors associated works accordingly to accept the
approved supplier / applicator water proofing works.
Refer to BoQ item no: B2A/1 ~ tem H —shotorete: We understand
from the Bo item description that “reinforced shotcrete wall need