Here is the project report of a civil engineering student who has spent 6 months on a training
site.Due to security reasons,the project details, estimation, some portion of design and quantity
calculations have been omitted.But to help the civil engineering students we had shown all the
necessary works..
After the process of excavation, laying of plain cement concrete that is PCC is done. A layer of 4
inches was made in such a manner that it was not mixed with the soil. It provides a solid bas for
the raft foundation and a mix of 1:5:10 that is, 1 part of cement to 5 parts of fine aggregates and
10 parts of coarse aggregates by volume were used in it. Plain concrete is vibrated to achieve full
compaction. Concrete placed below ground should be protected from falling earth during and
after placing. Concrete placed in ground containing deleterious substances should be kept free
from contact with such a ground and with water draining there from during placing and for a
period of seven days. When joint in a layer of concrete are unavoidable, and end is sloped at an
angle of 30 and junctions of different layers break joint in laying upper layer of concrete. The
lower surface is made rough and clean watered before upper layer is laid.
LAYING OF FOUNDATION
At our site, Raft foundations are used to spread the load from a structure over a large area,
normally the entire area of the structure. Normally raft foundation is used when large load is to
be distributed and it is not possible to provide individual footings due to space constraints that is
they would overlap on each other. Raft foundations have the advantage of reducing differential
settlements as the concrete slab resists differential movements between loading positions. They
are often needed on soft or loose soils with low bearing capacity as they can spread the loads
over a larger area.
In laying of raft foundation, special care is taken in the reinforcement and construction of plinth
beams and columns. It is the main portion on which ultimately whole of the structure load is to
come. So a slightest error can cause huge problems and therefore all this is checked and passed
by the engineer in charge of the site.
Apart from raft foundation, individual footings were used in the mess area which was extended
beyond the C and D blocks.
CEMENT
Portland cement is composed of calcium silicates and aluminate and aluminoferrite It is obtained
by blending predetermined proportions limestone clay and other minerals in small quantities
which is pulverized and heated at high temperature around 1500 deg centigrade to produce
clinker. The clinker is then ground with small quantities of gypsum to produce a fine powder
called Ordinary Portland Cement (OPC). When mixed with water, sand and stone, it combines
slowly with the water to form a hard mass called concrete. Cement is a hygroscopic material
meaning that it absorbs moisture In presence of moisture it undergoes chemical reaction termed
as hydration. Therefore cement remains in good condition as long as it does not come in contact
with moisture. If cement is more than three months old then it should be tested for its strength
before being taken into use.
The Bureau of Indian Standards (BIS) has classified OPC in three different grades The
classification is mainly based on the compressive strength of cement-sand mortar cubes of face
area 50 cm2 composed of 1 part of cement to 3 parts of standard sand by weight with a watercement ratio arrived at by a specified procedure. The grades are
(i) 33 grade
(ii) 43 grade
(iii) 53 grade
The grade number indicates the minimum compressive strength of cement sand mortar in
N/mm2 at 28 days, as tested by above mentioned procedure.
Portland Pozzolana Cement (PPC) is obtained by either intergrinding a pozzolanic material with
clinker and gypsum, or by blending ground pozzolana with Portland cement. Nowadays good
quality fly ash is available from Thermal Power Plants, which are processed and used in
manufacturing of PPC.
SETTLING OF CEMENT
When water is mixed with cement, the paste so formed remains pliable and plastic for a short
time. During this period it is possible to disturb the paste and remit it without any deleterious
effects. As the reaction between water and cement continues, the paste loses its plasticity. This
early period in the hardening of cement is referred to as setting of cement.
INITIAL AND FINAL SETTING TIME OF CEMENT
Initial set is when the cement paste loses its plasticity and stiffens considerably. Final set is the
point when the paste hardens and can sustain some minor load. Both are arbitrary points and
these are determined by Vicat needle penetration resistance
Slow or fast setting normally depends on the nature of cement. It could also be due to extraneous
factors not related to the cement. The ambient conditions play an important role. In hot weather,
the setting is faster, in cold weather, setting is delayed Some types of salts, chemicals, clay, etc if
inadvertently get mixed with the sand, aggregate and water could accelerate or delay the setting
of concrete.
STORAGE OF CEMENT
It needs extra care or else can lead to loss not only in terms of financial loss but also in terms of
loss in the quality. Following are the dont that should be followed (i) Do not store bags in a building or a godown in which the walls, roof and floor are not
completely weatherproof.
(ii) Do not store bags in a new warehouse until the interior has thoroughly dried out.
(iii) Do not be content with badly fitting windows and doors, make sure they fit properly and
ensure that they are kept shut.
(iv) Do not stack bags against the wall. Similarly, dont pile them on the floor unless it is a dry
concrete floor. If not, bags should be stacked on wooden planks or sleepers.
(v) Do not forget to pile the bags close together
(vi) Do not pile more than 15 bags high and arrange the bags in a header-and-stretcher fashion.
(vii) Do not disturb the stored cement until it is to be taken out for use.
(viii) Do not take out bags from one tier only. Step back two or three tiers.
(ix) Do not keep dead storage. The principle of first-in first-out should be followed in removing
bags.
(x) Do not stack bags on the ground for temporary storage at work site. Pile them on a raised, dry
platform and cover with tarpaulin or polythene sheet.
COARSE AGGREGATE
Coarse aggregate for the works should be river gravel or crushed stone .It should be hard, strong,
dense, durable, clean, and free from clay or loamy admixtures or quarry refuse or vegetable
matter. The pieces of aggregates should be cubical, or rounded shaped and should have granular
or crystalline or smooth (but not glossy) non-powdery surfaces.Aggregates should be properly
screened and if necessary washed clean before use.
Coarse aggregates containing flat, elongated or flaky pieces or mica should be rejected. The
grading of coarse aggregates should be as per specifications of IS-383.
After 24-hrs immersion in water, a previously dried sample of the coarse aggregate should not gain in
FINE AGGREGATE
Aggregate which is passed through 4.75 IS Sieve is termed as fine aggregate. Fine aggregate is
added to concrete to assist workability and to bring uniformity in mixture. Usually, the natural
river sand is used as fine aggregate. Important thing to be considered is that fine aggregates
should be free from coagulated lumps.
Grading of natural sand or crushed stone i.e. fine aggregates shall be such that not more than 5
percent shall exceed 5 mm in size, not more than 10% shall IS sieve No. 150 not less than 45%
or more than 85% shall pass IS sieve No. 1.18 mm and not less than 25% or more than 60% shall
pass IS sieve No. 600 micron.
BRICKWORK
Brickwork is masonry done with bricks and mortar and is generally used to build partition walls.
In our site, all the external walls were of concrete and most of the internal walls were made of
bricks. English bond was used and a ration of 1:4 (1 cement: 4 coarse sand) and 1:6 were used
depending upon whether the wall is 4.5 inches or 9 inches. The reinforcement shall be 2 nos.
M.S. round bars or as indicated. The diameter of bars was 8mm. The first layer of reinforcement
was used at second course and then at every fourth course of brick work. The bars were properly
anchored at their ends where the portions and or where these walls join with other walls. The in
laid steel reinforcement was completely embedded in mortar.
Bricks can be of two types. These are:
1) Traditional Bricks-The dimension if traditional bricks vary from 21 cm to 25cm in length,10
to 13 cm in width and 7.5 cm in height in different parts of country .The commonly adopted
normal size of traditional brick is 23 * 11.5*7.5 cm with a view to achieve uniformity in size of
bricks all over country.
2) Modular Bricks- Indian standard institution has established a standard size of bricks such a
brick is known as a modular brick. The normal size of brick is taken as 20*10*10 cm whereas its
actual dimensions are 19*9*9 cm masonry with modular bricks workout to be cheaper there is
saving in the consumption of bricks, mortar and labour as compared with masonry with
traditional bricks.
2. Mix of motor.
3. Size and shape of masonry construction.
The strength of brick masonry depends upon the strength of bricks used in the masonry
construction. The strength of bricks depends upon the nature of soil used for making and the
method adopted for molding and burning of bricks .since the nature of soil varies from region to
region ,the average strength of bricks varies from as low as 30kg/sq cm to 150 kg /sq cm the
basic compressive stress are different crushing strength.
There are many checks that can be applied to see the quality of bricks used on the site.Normally
the bricks are tested for Compressive strength, water absorption, dimensional tolerances and
efflorescence. However at small construction sites the quality of bricks can be assessed based on
following, which is prevalent in many sites.
Visual check Bricks should be well burnt and of uniform size and color.
Striking of two bricks together should produce a metallic ringing sound.
It should have surface so hard that cant be scratched by the fingernails.
A good brick should not break if dropped in standing position from one metre above ground
level.
A good brick shouldnt absorb moisture of more than 15-20% by weight, when soaked in water
For example; a good brick of 2 kg shouldnt weigh more than 2.3 to 2.4 kg if immersed in
water for 24 hours.
PRECAUTIONS TO BE TAKEN IN BRICK MASONRY WORK
Bricks should be soaked in water for adequate period so that the water penetrates
to its full thickness. Normally 6 to 8 hours of wetting is sufficient.
A systematic bond must be maintained throughout the brickwork. Vertical joints
shouldnt be continuous but staggered.
The joint thickness shouldnt exceed 1 cm. It should be thoroughly filled with the
cement mortar 1:4 to 1:6 (Cement: Sand by volume)
All bricks should be placed on their bed with frogs on top (depression on top of the
brick for providing bond with mortar).
Thread, plumb bob and spirit level should be used for alignment, verticality and
horizontality of construction.
Joints should be raked and properly finished with trowel or float, to provide good bond.
A maximum of one metre wall height should be constructed in a day.
Brickwork should be properly cured for at least 10 days
REINFORCEMENT
Steel reinforcements are used, generally, in the form of bars of circular cross section in concrete
structure. They are like a skeleton in human body. Plain concrete without steel or any other
reinforcement is strong in compression but weak in tension. Steel is one of the best forms of
reinforcements, to take care of those stresses and to strengthen concrete to bear all kinds of loads
Mild steel bars conforming to IS: 432 (Part I) and Cold-worked steel high strength deformed bars
conforming to IS: 1786 (grade Fe 415 and grade Fe 500, where 415 and 500 indicate yield
stresses 415 N/mm2 and 500 N/mm2 respectively) are commonly used. Grade Fe 415 is being
used most commonly nowadays. This has limited the use of plain mild steel bars because of
higher yield stress and bond strength resulting in saving of steel quantity. Some companies have
brought thermo mechanically treated (TMT) and corrosion resistant steel (CRS) bars with added
features.
Bars range in diameter from 6 to 50 mm. Cold-worked steel high strength deformed bars start
from 8 mm diameter. For general house constructions, bars of diameter 6 to 20 mm are used
Transverse reinforcements are very important. They not only take care of structural requirements
but also help main reinforcements to remain in desired position. They play a very significant role
while abrupt changes or reversal of stresses like earthquake etc.
They should be closely spaced as per the drawing and properly tied to the main/longitudinal
reinforcement
COVER BLOCK
Cover blocks are placed to prevent the steel rods from touching the shuttering plates and there by
providing a minimum cover and fix the reinforcements as per the design drawings. Sometimes it
is commonly seen that the cover gets misplaced during the concreting activity. To prevent this,
tying of cover with steel bars using thin steel wires called binding wires (projected from cover
surface and placed during making or casting of cover blocks) is recommended. Covers should be
made of cement sand mortar (1:3). Ideally, cover should have strength similar to the surrounding
concrete, with the least perimeter so that chances of water to penetrate through periphery will be
minimized. Provision of minimum covers as per the Indian standards for durability of the whole
structure should be ensured.
Shape of the cover blocks could be cubical or cylindrical. However, cover indicates thickness of
the cover block. Normally, cubical cover blocks are used. As a thumb rule, minimum cover of 2
in footings, 1.5 in columns and 1 for other structures may be ensured.
Structural element
Footings
40
Columns
40
Slabs
15
Beams
25
Retaining wall
THINGS TO NOTE
Reinforcement should be free from loose rust, oil paints, mud etc. it should be cut, bent and fixed
properly. The reinforcement shall be placed and maintained in position by providing proper
cover blocks, spacers, supporting bars, laps etc. Reinforcements shall be placed and tied such
that concrete placement is possible without segregation, and compaction possible by an
immersion vibrator.
For any steel reinforcement bar, weight per running meter is equal to d*d/162 Kg, where d is
diameter of the bar in mm. For example, 10 mm diameter bar will weigh 1010/162 = 0.617
Kg/m
Three types of bars were used in reinforcement of a slab. These include straight bars, crank bar
and an extra bar. The main steel is placed in which the straight steel is binded first, then the crank
steel is placed and extra steel is placed in the end. The extra steel comes over the support while
crank is encountered at distance of (1-distance between the supports) from the surroundings
supports.
For providing nominal cover to the steel in beam, cover blocks were used which were made of
concrete and were casted with a thin steel wire in the center which projects outward. These keep
the reinforcement at a distance from bottom of shuttering. For maintaining the gap between the
main steel and the distribution steel, steel chairs are placed between them
DEFINITION
The term SHUTTERING or FORMWORK includes all forms, moulds, sheeting, shuttering
planks, walrus, poles, posts, standards, leizers, V-Heads, struts, and structure, ties, prights,
walling steel rods, bolts, wedges, and all other temporary supports to the concrete during the
process of sheeting.
FORM WORK
Forms or moulds or shutters are the receptacles in which concrete is placed, so that it will have
the desired shape or outline when hardened. Once the concrete develops adequate strength, the
forms are removed. Forms are generally made of the materials like timber, plywood, steel, etc.
Generally camber is provided in the formwork for horizontal members to counteract the effect of
deflection caused due to the weight of reinforcement and concrete placed over that. A proper
lubrication of shuttering plates is also done before the placement of reinforcement. The oil film
sandwiched between concrete and formwork surface not only helps in easy removal of shuttering
but also prevents loss of moisture from the concrete through absorption and evaporation.
The steel form work was designed and constructed to the shapes, lines and dimensions shown on
the drawings. All forms were sufficiently water tight to prevent leakage of mortar. Forms were so
constructed as to be removable in sections. One side of the column forms were left open and the
open side filled in board by board successively as the concrete is placed and compacted except
when vibrators are used. A key was made at the end of each casting in concrete columns of
appropriate size to give proper bondings to columns and walls as per relevant IS.
concrete.
c) If formwork is held together by bolts or wires, these should be so fixed that no iron is
exposed on surface against which concrete is to be laid.
d) Provision is made in the shuttering for beams, columns and walls for a port hole of
convenient size so that all extraneous materials that may be collected could be
removed just prior to concreting.
e) Formwork is so arranged as to permit removal of forms without jarring the concrete.
Wedges, clamps, and bolts should be used where practicable instead of nails.
f) Surfaces of forms in contact with concrete are oiled with a mould oil of approved
quality. The use of oil, which darkens the surface of the concrete, is not allowed. Oiling
is done before reinforcement is placed and care taken that no oil comes in contact with
the reinforcement while it is placed in position. The formwork is kept thoroughly wet
during concreting and the whole time that it is left in place.
Immediately before concreting is commenced, the formwork is carefully examined to
ensure the following:
a) Removal of all dirt, shavings, sawdust and other refuse by brushing and washing.
b) The tightness of joint between panels of sheathing and between these and any hardened core.
c) The correct location of tie bars bracing and spacers, and especially connections of
bracing.
d) That all wedges are secured and firm in position.
e) That provision is made for traffic on formwork not to bear directly on reinforcement
steel.
VERTICALITY OF THE STUCTURE
All the outer columns of the frame were checked for plumb by plumb-bob as the work proceeds
to upper floors. Internal columns were checked by taking measurements from outer row of
columns for their exact position. Jack were used to lift the supporting rods called props
STRIPPING TIME OR REMOVAL OF FORMWORK
Forms were not struck until the concrete has attained a strength at least twice the stress to which
the concrete may be subjected at the time of removal of form work. The strength referred is that
of concrete using the same cement and aggregates with the same proportions and cured under
conditions of temperature and moisture similar to those existing on the work. Where so required,
form work was left longer in normal circumstances
Form work was removed in such a manner as would not cause any shock or vibration that would
damage the concrete. Before removal of props, concrete surface was exposed to ascertain that the
concrete has sufficiently hardened. Where the shape of element is such that form work has reentrant angles, the form work was removed as soon as possible after the concrete has set, to
avoid shrinkage cracking occurring due to the restraint imposed. As a guideline, with
temperature above 20 degree following time limits should be followed:
Structural Component
Age
Footings
1 day
2 days
14 days
21 days
7 days
14 days
21 days
SEGREGATION
The stability of a concrete mix requires that it should not segregate and bleed during the
transportation and placing. Segregation can be defined as separating out of the ingredients of a
concrete mix, so that the mix is no longer in a homogeneous condition. Only the stable
homogeneous mix can be fully compacted
The segregation depends upon the handling and placing operations. The tendency to segregate,
amount of coarse aggregate, and with the increased slump. The tendency to segregate can be
minimized by:
a. Reducing the height of drop by concrete.
b. Not using the vibration as a means of spreading a heap of of concrete into a level mass over a large
area.
c. Reducing the continued vibration over a longer time, as the coarse aggregate tends to settle to the
bottom and the scum would rise to the surface.
d. Adding small quantity of water which improves cohesion of the mix.
BLEEDING
Bleeding is due to the rise of water in the mix to the surface because of the inability of the solid
particles in the mix to hold all the mixing water during settling of particles under the effect of
compaction. The bleeding causes formation of a porous, weak and non durable concrete layer at
the top of placed concrete. In case of lean mixes bleeding may create capillary channels
increasing the permeability of the concrete. When the concrete is placed in different layers and
each layer is compacted after allowing certain time to lapse before the next layer is laid, the
bleeding may cause a plane of weakness between two layers. Any laitance formed should be
removed by brushing and washing before a new layer is added. Over compacting the surface
should be avoided.
HARDENED CONCRETE
One of the most important properties of the hardened concrete is its strength which represents the
ability if concrete to resist forces. If the nature of the force is to produce compression, the
strength is termed compressive strength. The compressive strength of hardened concrete is
generally considered to be the most important property and is often taken as the index of the
overall quality of concrete. The strength can indirectly give an idea of the most of the other
properties of concrete which are related directly to the structure of hardened cement paste. A
stronger concrete is dense, compact, impermeable and resistant to weathering and to some
chemicals. However, a stronger concrete may exhibit higher drying shrinkage with consequent
cracking, due to the presence of higher cement content.
Some of the other desirable properties like shear and tensile strengths, modulus of elasticity,
bond, impact and durability etc. are generally related to compressive strength. As the
compressive strength can be measured easily on standard sized cube or cylindrical specimens, it
can be specified as a criterion for studying the effect of any variable on the quality of concrete.
However, the concrete gives different values of any property under different testing conditions.
Hence method of testing, size of specimen and the rate of loading etc. are stipulated while testing
the concrete to minimize the variations in test results. The statistical methods are commonly used
for specifying the quantitative value of any particular property of hardened concrete.
COMPRESSIVE STRENGTH
The compressive strength of concrete is defined as the load which causes the failure of specimen,
per unit area of cross-section in uniaxial compression under given rate of loading. The strength
of concrete is expressed as N/mm2. The compressive strength at 28 days after casting is taken as
a criterion for specifying the quality of concrete. This is termed as grade of concrete. IS 456
2000 stipulates the use of 150 mm cubes.
TENSILE STRENGTH
The concrete has low tensile strength; it ranges from 8-12 per cent of its compressive strength.
An average value of 10 per cent is generally adopted.
SHEAR STRENGTH
The concrete subjected to bending and shear stress is accompanied by tensile and compressive
stresses. The shear failures are due to resulting diagonal tension. The shear strength is generally
12-13 per cent of its compressive strength.
BOND STRENGTH
The resistance of concrete to the slipping of reinforcing bars embedded in concrete is called bond
strength. The bond strength is provided by adhesion of hardened cement paste, and by the
friction of concrete and steel. It is also affected by shrinkage of concrete relative to steel. On an
average bond strength is taken as 10 per cent of its compressive strength.
FACTS ABOUT CEMENT AND CONCRETE
Use of minimum quantity of mixing water, consistent with the degree of workability required
to enable easy placing and compaction of concrete, is advisable.
Ensure that water is measured and added.
Low water to cement ratio is essential for good performance of the structure in the long run.
COMMON REASONS FOR LACK OF QUALITY IN CONCRETE WORK
Use of too much or too little water for mixing, or water carelessly added during mixing
Incomplete mixing of aggregate with cement
Improper grading of aggregates resulting in segregation or bleeding of concrete.
Inadequate compaction of concrete
Using concrete which has already begun to set.
Placing of concrete on a dry foundation without properly wetting it with water.
Use of dirty aggregate or water containing earthy matter, clay or lime.
Too much troweling of the concrete surface.
Leaving the finished concrete surface exposed to sun and wind during the first ten days after
placing without protecting it and keeping it damp by proper methods of curing.
Construction joints are the joints provided between successive pours of concrete that have been
carried out after a time lag. As far as possible the construction joints should be avoided and every
care should be taken to keep their numbers minimal. Since, presence of these joints creates a
plane of weakness within the concrete body, these joints should be preplanned and their location
should be such that they are at places where they are subjected to minimum bending moment and
minimum shear force.
POURING AND CONSOLIDATION
Concrete (M20) was used for all works in column, beams and slabs. It was well consolidated by
vibrating using portable mechanical vibrators. Care was taken to ensure that concrete is not over
vibrated so as to cause segregation. The layers of concrete are so placed that the bottom layer
does not finally set before the top layer is placed. The vibrators maintain the whole of concrete
under treatment in an adequate state of agitation, such that deaeration and effective compaction is
attained at a state commensurate with the supply of concrete from the mixers. The vibrator
continue during the whole period occupied by placing of concrete, the vibrators being adjusted
so that the centre vibrations approximate to the centre of the mass being compacted at the time of
placing. Shaking of reinforcement for the purpose of compaction should be avoided. Compaction
shall be completed before initial setting starts i.e. within thirty minute of addition of water to the
dry mixture.
The concrete was deposited in its final position in a manner to preclude segregation of ingredients.
In case of column and walls, the shuttering was so adjusted that the vertical drop of concrete is
not more than 1.5 m at a time. In case of concreting of slabs and beams, the pipe from the
batching plant was directly taken to the closest point.
COMPACTION
Green concrete has all the three phases solids, water & air. In order to make the concrete
impervious & attain its maximum strength it is required to remove the entrapped air from the
concrete mass when it is still in plastic state. If the air is not removed completely, the concrete
loses strength considerably. It has been observed that 5% voids reduce the strength by about 30%
and 10% voids reduce the strength by over 50%. Compaction eliminates air bubbles and brings
enough fine material both to the surface and against the forms to produce the desired finish. One
can use such hand tools as steel rods, paddling sticks, or tampers, but mechanical vibrators are
best. Any compacting device must reach the bottom of the form and be small enough to pass
between reinforcing bars. Since the strength of the concrete member depends on proper
reinforcement location, be careful not to displace the reinforcing steel.
C Compacting reinforced concrete work is very important and is done using iron rods. In case the
thickness of concrete layers should be more than 15 cm. the most satisfactory method for
compacting concrete properly is to consolidate each layer separately so that its top surface
become level and fairy smooth before the next layer is placed. While tamping is carried out, care
should be taken that the rod should penetrate the full layer of the last layer placed and to some
extent into lying to ensure proper bond between bond between them. Secondly the reinforcement
and formwork should not be disturbed from their positions.
MECHANICAL COMPACTION
M Mechanical compaction is done by the use of vibrators. Compaction of concrete by vibration is
considered essential for all important works especially in situations where reinforcements are
congested or the member is required is to have exposed to concrete surface finish. When
vibraters are used leaner but stiff, concrete mix should be used to obtain greater durability and
highest strength, mixes which are to stiff to consolidate by hand compaction can be easily
compacted by mechanical compaction, in case the concrete is compacted by vibrations ,during
which the vibrator communicates rapid vibrations to the particles, increases the fluidity of
concrete. Due to vibrations the particles occupy a more stable position and concrete fills all the
space and present is force out to the surface, resulting in dense and durable concrete.
TYPES OF VIBRATORS
Following are the type of vibrates usually used to compact concrete:
1. Internal vibrators
2. External vibrators
3. Surface vibrators
4. Vibrating table
Internal vibrator consists of metal road like vibrating head which is immersed in the full depth of
concrete layer. It is also known as poker or needle vibrator and is consider to be most effective
type of vibrator as it comes into intimate contact with concrete. External vibrators are placed
against the concrete form-work and vibrating force for compaction is conveyed to the concrete
through the form work. These vibrators are also called form vibrators. The vibrator is rigidly
clamped to form work resting on a elastic spot, so that both the form and concrete are vibrated.
Incase considerable proportion of work done is consumed in vibrating resulting in low efficiency
of the system. Surface vibrators are mounted on platform and are generally used to compact and
finish bridge, road slab etc. These are also external vibrators and are suitable for precast concrete
work. It provides a reliable means of compaction of pre-cast concrete and has the adv of offering
uniform vibration. Vibrating table is used for consolidation of pre-cast units. Surface vibrators is
used there a wide horizontal surface occurs such as dams and very thick walls .large type of
surface vibrators is there but pen type vibrator are used most. When concrete is placed on such
tables, mechanical compaction takes place which has many advantages. Each vibrator have its
own advantages and disadvantages, hence the choice between different types should be made
correctly. Concrete to be compacted by vibration, should be designed properly. The consistency
of concrete depends of conditions of placing, type of mix, and the efficiency of vibrator. The
slum of such concrete should not be more than 5 cm in any case; otherwise segregation of
concrete will take place, which should never be allowed to occur.
FINISH TO CONCRETE WORK:
a) All concrete while being poured against form work was worked with vibrator
rods & trowels as required so that good quality concrete is obtained.
b) All exposed surface of RCC lintels, beams, columns etc. were plastered to match
with adjoining plastered face of walls after suitably hacking the concrete surface.
CONCRETE MIXERS AND BATCHING PLANT
Concrete Plant, also known as a Batch Plant, is a device that combines various ingredients to
form concrete. Some of these inputs include sand, water, aggregate (rocks, gravel, etc.), fly ash,
potash, cement, and other ingredients to create concrete. There are two types of concrete plants,
ready mix plants and central mix plant. A concrete plant can have a variety of parts and
accessories, including but not limited to: mixers (either tilt-up or horizontal (or in some cases,
both), cement batchers, aggregate batchers, conveyors, radial stackers, aggregate bins, cement
bins, heaters, chillers, cement silos, batch plant controls, and dust collectors (to minimize
environmental pollution).
The front view of the plant from where it hauls coarse aggregate is shown below:-
CURING
The term curing is used to include maintenance of a favorable environment for the continuation
of chemical reactions, i.e. retention of moisture within, or supplying moisture to the concrete
from an external source and protection against extremes of temperature
Following are the methods for curing different building parts:Walls Water should be sprinkled from the top such that it covers the whole area of the wall and
it should be remain wet.
Leakages occur because of variety of reasons; some of which are mentioned below
a) Accumulation of water, which start penetrating the surface.
b) Poor quality and improper proportioning of concrete constituents that make concrete
permeable.
PLASTERING
Plaster protects structure from temperature variations; external attacks of sulphates, chlorides,
etc. Plaster also provides smooth & aesthetic surface on RCC & Brickwork surface. The
proportion of mortar used at site for ceiling coat is 1:4 and wall coat is 1:3. A plaster of 10 mm is
done at ceiling and a plaster of 12.5mm is done at wall. Various precautions to be taken while the
work of plastering is going on are:Preferably use cements which releases low heat of hydration.
Use optimum water at the time of mixing.
Do not use dry cement on the plaster surface.
At the junction of Brickwork & RCC, chicken mesh or fiber mesh may be used.
Wet the surface before plastering and cure the surface for at least 10 to 12 days.
FLOORING
The purpose of a floor is to provide a horizontal sanitary surface to support the occupants of a
building, furniture and equipment. A good floor should have strength and stability, resistance to
dampness, good appearance, and freedom from maintenance etc.
Following are the common floor finishes
Cement concrete flooring- It consists of 1:1.5:3 cement concrete laid to a thickness of 3 to 4,
over a strong sub base. Top surface is smoothened with cement punning. It has got good wearing
properties and can be easily cleaned and maintained. If thickness is less, the size of stone
aggregates is limited to .
Tile flooring- It consists of ceramic, vitrified, terrazzo and cement tiles. Tiles give very pleasant
appearance to floors. Also, it can be executed fast. Vitrified and Ceramic tiles have gained
popularity over mosaic tiles because it doesnt require grinding and polishing and the appearance
is good and the tiles are quite strong.
In ground floor the cement concrete floor is to be on 7.5 cm base of lime concrete or weak
cement concrete as per standard specifications. If the bases consist of cement concrete it shall be
allowed to set for about 7 days. In case the base is of weak cement concrete the flooring shall
commence within 48 hours of laying the base. In first floor or upper floor if c.c. floor is to be laid
on R.C.C. slab, the surface shall be made rough with brushes while concrete is green. Before
laying the c.c. floor the surface shall be cleaned, wetted and a neat cement wash shall be applied
to get a good bond.A layer of brick brats ie broken bricks are laid before the laying of mortar and
there by the tiles
ELECTRICAL CONDUITS
Separate conduits are laid for following systems:
Types of Mixes
1. Nominal Mixes
In the past the specifications for concrete prescribed the proportions of cement, fine and
coarse aggregates. These mixes of fixed cement-aggregate ratio which ensures adequate
strength are termed nominal mixes. These offer simplicity and under normal
circumstances, have a margin of strength above that specified. However, due to the
variability of mix ingredients the nominal concrete for a given workability varies widely
in strength.
2. Standard mixes
The nominal mixes of fixed cement-aggregate ratio (by volume) vary widely in strength and may
result in under- or over-rich mixes. For this reason, the minimum compressive strength has been
included in many specifications. These mixes are termed standard mixes.
IS 456-2000 has designated the concrete mixes into a number of grades as M10, M15, M20,
M25, M30, M35 and M40. In this designation the letter M refers to the mix and the number to
the specified 28 day cube strength of mix in N/mm 2. The mixes of grades M10, M15, M20 and
M25 correspond approximately to the mix proportions (1:3:6), (1:2:4), (1:1.5:3) and (1:1:2)
respectively.
3. Designed Mixes
In these mixes the performance of the concrete is specified by the designer but the mix
proportions are determined by the producer of concrete, except that the minimum cement content
can be laid down. This is most rational approach to the selection of mix proportions with specific
materials in mind possessing more or less unique characteristics. The approach results in the
production of concrete with the appropriate properties most economically. However, the
designed mix does not serve as a guide since this does not guarantee the correct mix proportions
for the prescribed performance.
For the concrete with undemanding performance nominal or standard mixes (prescribed in the
codes by quantities of dry ingredients per cubic meter and by slump) may be used only for very
small jobs, when the 28-day strength of concrete does not exceed 30 N/mm 2. No control testing
is necessary reliance being placed on the masses of the ingredients.
Factors affecting the choice of mix proportions
The various factors affecting the mix design are:
1. Compressive strength
It is one of the most important properties of concrete and influences many other describable
properties of the hardened concrete. The mean compressive strength required at a specific age,
usually 28 days, determines the nominal water-cement ratio of the mix. The other factor affecting
the strength of concrete at a given age and cured at a prescribed temperature is the degree of
compaction. According to Abrahams law the strength of fully compacted concrete is inversely
proportional to the water-cement ratio.
2. Workability
The degree of workability required depends on three factors. These are the size of the section to
be concreted, the amount of reinforcement, and the method of compaction to be used. For the
narrow and complicated section with numerous corners or inaccessible parts, the concrete must
have a high workability so that full compaction can be achieved with a reasonable amount of
effort. This also applies to the embedded steel sections. The desired workability depends on the
compacting equipment available at the site.
3. Durability
The durability of concrete is its resistance to the aggressive environmental conditions. High
strength concrete is generally more durable than low strength concrete. In the situations when the
high strength is not necessary but the conditions of exposure are such that high durability is vital,
the durability requirement will determine the water-cement ratio to be used.
4. Maximum nominal size of aggregate
In general, larger the maximum size of aggregate, smaller is the cement requirement for a
particular water-cement ratio, because the workability of concrete increases with increase in
maximum size of the aggregate. However, the compressive strength tends to increase with the
decrease in size of aggregate.
IS 456:2000 and IS 1343:1980 recommend that the nominal size of the aggregate should be as
large as possible.
5. Grading and type of aggregate
The grading of aggregate influences the mix proportions for a specified workability and watercement ratio. Coarser the grading leaner will be mix which can be used. Very lean mix is not
desirable since it does not contain enough finer material to make the concrete cohesive.
The type of aggregate influences strongly the aggregate-cement ratio for the desired workability
and stipulated water cement ratio. An important feature of a satisfactory aggregate is the
uniformity of the grading which can be achieved by mixing different size fractions.
6. Quality Control
The degree of control can be estimated statistically by the variations in test results. The variation
in strength results from the variations in the properties of the mix ingredients and lack of control
of accuracy in batching, mixing, placing, curing and testing. The lower the difference between
the mean and minimum strengths of the mix lower will be the cement-content required. The
factor controlling this difference is termed as quality control.
Procedure
1. Determine the mean target strength ft from the specified characteristic compressive strength at 28day fck and the level of quality control.
ft = fck + 1.65 S
where S is the standard deviation obtained from the Table of approximate contents given after the
design mix.
2. Obtain the water cement ratio for the desired mean target using the emperical relationship between
compressive strength and water cement ratio so chosen is checked against the limiting water
cement ratio. The water cement ratio so chosen is checked against the limiting water cement ratio
for the requirements of durability given in table and adopts the lower of the two values.
3. Estimate the amount of entrapped air for maximum nominal size of the aggregate from the table.
4. Select the water content, for the required workability and maximum size of aggregates (for
aggregates in saturated surface dry condition) from table.
5. Determine the percentage of fine aggregate in total aggregate by absolute volume from table for
the concrete using crushed coarse aggregate.
6. Adjust the values of water content and percentage of sand as provided in the table for any
difference in workability, water cement ratio, grading of fine aggregate and for rounded
aggregate the values are given in table.
7. Calculate the cement content form the water-cement ratio and the final water content as arrived
after adjustment. Check the cement against the minimum cement content from the requirements
of the durability, and greater of the two values is adopted.
8. From the quantities of water and cement per unit volume of concrete and the percentage of sand
already determined in steps 6 and 7 above, calculate the content of coarse and fine aggregates per
unit volume of concrete from the following relations:
fa, Ca = total masses of fine and coarse aggregates, per cubic metre of concrete,
respectively, kg, and
Sfa, Sca = specific gravities of saturated surface dry fine and coarse aggregates,
respectively
9. Determine the concrete mix proportions for the first trial mix.
10. Prepare the concrete using the calculated proportions and cast three cubes of 150 mm size and
test them wet after 28-days moist curing and check for the strength.
11. Prepare trial mixes with suitable adjustments till the final mix proportions are arrived at.
posted in Project Reports | 298 Comments
12. Lay the Slump Rod across the inverted cone such that it passes above the slumped concrete at
its
highest
point.
13. Measure the distance between the underside of rod and the highest point of concrete to the
nearest
5mm.
14. This reading is the amount that the sampled concrete has slumped.
15. If the concrete does not show an acceptable slump, repeat the test with another sample.
16. If the repeated test still does not show an acceptable slump, record this fact in the report, or
reject that load of concrete.
COMPRESSION TEST
The Compression Test is a laboratory test to determine the characteristic strength of the concrete
but the making of test cubes is sometimes carried out by the supervisor on site. This cube test
result is very important to the acceptance of insitu concrete work since it demonstrates the
strength
of
the
design
mix.
The procedure of making the test cubes is as follows: 1. 150 mm standard cube mold is to be used for concrete mix and 100 mm standard cube mold is
to
be
used
for
grout
mix.
2. Arrange adequate numbers of required cube molds to site in respect with the sampling
sequence
for
the
proposed
pour.
3. Make sure the apparatus and associated equipment ( see Fig 7 6 ) are clean before test and
free
from
hardened
concrete
and
superfluous
water
.
4. Assemble the cube mold correctly and ensure all nuts are tightened.
5. Apply a light coat of proprietary mold oil on the internal faces of the mold.
6. Place the mold on level firm ground and fill with sampled concrete to a layer of about 50 mm
thick.
7. Compact the layer of concrete thoroughly by tamping the whole surface area with the Standard
Tamping Bar. (Note that no less than 35 tamps / layer for 150 mm mold and no less than 25
tamps
/
layer
for
100
mm
mold).
8. Repeat Steps 5 & 6 until the mold is all filled. (Note that 3 layers to be proceeded for 150 mm
mold
and
2
layers
for
100
mm
mold).
9. Remove the surplus concrete after the mold is fully filled and trowel the top surface flush with
the
mold.
10. Mark the cube surface with an identification number (say simply 1, 2, 3, etc) with a nail or
match stick and record these numbers in respect with the concrete truck and location of pour
where
the
sampled
concrete
is
obtained.
11. Cover the cube surface with a piece of damp cloth or polythene sheeting and keep the cube in
a place free from vibration for about 24 hours to allow initial set .
12. Strip off the mold pieces in about 24 hours after the respective pour is cast. Press the concrete
surface with the thumb to see any denting to ensure the concrete is sufficiently hardened, or
otherwise de-molding has to be delayed for one more day and this occurrence should be stated
clearly
in
the
Test
Report.
13. Mark the test cube a reference number with waterproof felt pen on the molded side, in
respect
with
the
previous
identification
number.
14. Place the cube and submerge in a clean water bath or preferably a thermostatically controlled
curing tank until it is delivered to the accredited laboratory for testing.
Checking Quality of Fine Aggregates and Bricks
For checking the quality of fine aggregates, a field test was conducted in which the sand was
placed in a flask containing water. The sand was allowed to settle for some time and then after
few hours the reading of the silt or other impurity layer is takenIf that reading is less than 5% of
the total sand that is put in the flask, then we accept the sand but if it is more than 5% the sand is
rejected. Bricks were sent to the college laboratory for testing and thereby checking the quality
of the bricks used at site.
posted in Project Reports | 14 Comments
1 line about your family [ this depends on what kind of interview you are going through]
and lastly why are you the best suited person for this job. Tell about your achievements
but never sound too proud of your achievements, highlight yourself but with decency.
Remember the golden rule
First Impression is the last impression.
8. Question 2: What are your greatest strengths?
This question is to judge how you present yourself, are you the person who talks too
much, are you arrogant or are you the one who just do what others say and thus never
realized your strengths.
The answer to this question should be linked with facts and figures if possible. If you had
any previous achievements say you lead a team which did wonderful and thus you are a
team leader and all. Highlight yourself, tell your strengths but be sure it is well supported
and you just dont start sayings just to impress. Remember the HR person will grill you if
he even finds an iota of doubt in what you are saying. Some points on which you could
support your answer could be honesty, leadership, tech savvy, confident, good
communication skills, positive attitude, motivational and inspirational leader etc.
9. So just prepare yourself for this question, make a mental note of all your achievements.
10. Question 3: What are your greatest weaknesses?
Now this is the question which could either end your interview or could just get you the
job. Dont mince with words, at the same time just dont be too blunt. Tell your weakness
but also tell what you are doing to over come it. Never say I can not do this. Instead say, I
have never done this but I am eager to learn and am sure if our company needs it I will do
it.
11. Note Never say your company or what would be my position in your company, use our
company. Some HR people might ask you why you are saying our before selection then
do say its because I am confident that I am the best person for this vacancy.
12. Question 4: Tell me about something you did or failed to do that you now feel a
little ashamed of.
This question is just to see how you react to embarrassing situations. Of course you just
can not say SKIP THIS PLEASE. So better prepare yourself. Take your time to reply to
this one, at first say I am really finding it very hard to find any such situation as I believe
the best way to avoid shame is never do such things.
13. Most of the interviewers just will proceed to another question but if he or she insists to
elaborate then give any appropriate reply but be sure it should not sound that you are so
21. During an interview I said I want to see me at your post and you in top management
and believe me, the interviewer had a very good laugh and said that was really clever. I
dont suggest you to say this every time but yes if you feel the person has a jolly nature
you can say so
22. Question 8: Why do you want to work at our company?
23. This question is asked to check whether you know about the company and work profile
or it was just that you got a call from your friend and you walked in the interview.
So do your homework and check annual reports of company, browse website or any
relevant data. See the areas where company is growing and match your skills with it.
Show the interviewer how you could add to the overall profit of company.
24. Question 9: What are your hobbies?
This question is asked to judge your personality. I have seen hundreds of resume which
say
Hobbies reading books, listening songs, browsing internet , sleeping.
25. For god sake dont copy it from others resume and use it. Write what you actually do.
Dont write I have a hobby of reading books when you could not even name 1 book if
asked for. Never be fake, tell them truthfully what you do.
26. Mention some hobbies which are directly or indirectly linked with job. But make sure
you have that hobby. If not then say what you actually do. Different people have different
hobbies, so there is nothing to be ashamed off