Sr. E.
Tech.
Plumbing:
Sanitary Pumps (8)
Domestic Water Heaters and recirculation pumps
2
2
2
2
3
2
2
2
8
24
12
10
1.5
5
8
8
3
2
2
2
8
24
12
10
1.5
5
8
8
89.5
89.5
12
12
101.5
101.5
Mechanical
Chilled Water and Hot Water Building Entrance
Med Temp HW to Hot Water Heat Exchangers HX-1, 2
Heating Hot Water Pumps and Controls, P-1, 2
Steam System
Dehumidification Units DU-1-1, DU-2-1 and DU-A-1
Air Handling Units (AHU 1-1, 1-2, 2-1, 2-2, 2-3, A-1)
Zone Constant Volume and Variable Volume Terminals (11 VAV and 13 Constant Volume)
Zone Humidifiers (H1-1, 1-2, 1-3, 2-1 ,2-2 ,2-3 ,2-4 ,2-5 ,2-6 ,2-7)
Fans (GX2-1, TX2-1, EF 2-1, TXA-1)
Miscellaneous Terminal Equipment (unit heaters, radiation, etc. - 15 units)
Digital Building Automation System Front End
Contingency
Subtotal
Misc. and TAB Validation
Total
Page 1
Commissioning
Date :
All
3/20/2001
Estimated by :
TMS
SENIOR
SENIOR
SENIOR
ENGR 1
ENGR 2
Techn.
TECH.
DES.
DRAFTS.
TOTAL
Trips
CLERK
Total Days
Nights
on site
Lodging
0
Initial meeting (Kickoff, and review comments)
10
16
10
16
16
10
10
2
1
24
24
24
24
16
16
32
6
16
16
32
90
90
180
12
16
12
12
12
12
12
16
32
16
16
16
32
Warranty Visit
12
20
16
16
39
37
0
0
TOTAL MANHOURS
RATE
SALARY COST
299936507.xls 01/06/2016 16:15:01
0
$130.00
$0
336
$117.50
$39,480
0
$117.50
$0
170
$110.00
$18,700
$0
$0
$0
458
$127.03
$58180
page 2 of 3
Commissioning
EXPENSE SUMMARY
1 TRAVEL - Mileage
TRAVEL - Air
TRAVEL - Rental Car
2 LODGING
3 MEALS
4 TELEPHONE
5 REPRODUCTION - XEROX
6 REPRODUCTION - PRINTS
7 POSTAGE
8
9 MISCELLANEOUS
10 subcontractor
Expense Total
Labor Total
TOTAL FEE
39
39
37
0
37
TRIPS@
TRIPS@
Days@
Nights@
Days@
40
0
0
150
10
=1560 mi at .31
=$484
=$0
=$0
=$0
=$370
$200
$75
$100
$50
$1,279
$58,180
$59,459