Tests Time Estimate

Sr. E.

Tech.

Plumbing:
Sanitary Pumps (8)
Domestic Water Heaters and recirculation pumps

2
2

2
2

3
2
2
2
8
24
12
10
1.5
5
8
8

3
2
2
2
8
24
12
10
1.5
5
8
8

89.5

89.5

12

12

101.5

101.5

Mechanical
Chilled Water and Hot Water Building Entrance
Med Temp HW to Hot Water Heat Exchangers HX-1, 2
Heating Hot Water Pumps and Controls, P-1, 2
Steam System
Dehumidification Units DU-1-1, DU-2-1 and DU-A-1
Air Handling Units (AHU 1-1, 1-2, 2-1, 2-2, 2-3, A-1)
Zone Constant Volume and Variable Volume Terminals (11 VAV and 13 Constant Volume)
Zone Humidifiers (H1-1, 1-2, 1-3, 2-1 ,2-2 ,2-3 ,2-4 ,2-5 ,2-6 ,2-7)
Fans (GX2-1, TX2-1, EF 2-1, TXA-1)
Miscellaneous Terminal Equipment (unit heaters, radiation, etc. - 15 units)
Digital Building Automation System Front End
Contingency

Subtotal
Misc. and TAB Validation
Total

Page 1

Commissioning

MAN-HOUR ESTIMATING FORM


Proposal : UVA - Special Collections Library
Dept :

Date :

All

3/20/2001

Estimated by :

TMS

DEPT. MAN-HOURS BY EMPLOYEE CLASSIFICATION


WORK ACTIVITY
PM

SENIOR

SENIOR

SENIOR

ENGR 1

ENGR 2

Techn.

TECH.
DES.

DRAFTS.

TOTAL

Trips

CLERK

Total Days

Nights

on site

Lodging

0
Initial meeting (Kickoff, and review comments)

10

Prepare Draft Commissioning Plan

16

10

Review Contract Documents (100%CD's)

16

Prepare Commissioning Specifications

16

Attend Meeting to review commissioning plan


Answer Commissioning Related Questions

10

10

2
1

24

24

Attend early construction mtg to review commissioning plan

Review submittal data

24

24

Visit project site at selected times (2 progress trips)

16

Review equipment start-up checklists

16

32
6

Review BAS system test plans

Prepare Final FPT's

16

16

32

attend BAS demonstration and direct FPT

90

90

180

Review BAS system trend logs

12

Attend BAS system opposite season test

16

Review opposite season trend logs

12

12

Prepare final commissioning report

12

12

12
16

32

Attend selected operator training sessions

16

Spot Check TAB

16

16

32

Warranty Visit

12

20

Electrical Engineer Site Visit

16

16

39

37

0
0
TOTAL MANHOURS
RATE
SALARY COST
299936507.xls 01/06/2016 16:15:01

0
$130.00
$0

336
$117.50
$39,480

0
$117.50
$0

170
$110.00
$18,700

$0

$0

$0

458
$127.03
$58180

page 2 of 3

Commissioning

EXPENSE SUMMARY
1 TRAVEL - Mileage
TRAVEL - Air
TRAVEL - Rental Car
2 LODGING
3 MEALS
4 TELEPHONE
5 REPRODUCTION - XEROX
6 REPRODUCTION - PRINTS
7 POSTAGE
8
9 MISCELLANEOUS
10 subcontractor

Expense Total
Labor Total

TOTAL FEE

299936507.xls 01/06/2016 16:15:02

39
39
37
0
37

TRIPS@
TRIPS@
Days@
Nights@
Days@

40
0
0
150
10

MILES PER TRIP


Dollars Per Trip
Dollars per day
Dollars per nite
Dollars per day

=1560 mi at .31

=$484
=$0
=$0
=$0
=$370
$200
$75
$100
$50

$1,279
$58,180

$59,459

page 3 of 3