Vous êtes sur la page 1sur 2

Stuck Pipe Manual

Section 2 - Real Time Analysis - How to Monitor the Plan?

TABLE OF CONTENTS
2.

REAL TIME ANALYSIS HOW TO MONITOR THE PLAN?

2.1.
2.2.
2.2.1.
2.2.2.
2.3.
2.3.1.
2.3.2.
2.4.
2.4.1.
2.4.2.

Introduction ................................................................................................... 1
Surface Measurements - Rig Floor measurements .................................... 2
Drilling Parameters................................................................................... 2
Torque & Drag Analysis ........................................................................... 5
Downhole Measurements Indicators and Signals.......................................12
Downhole Weight on Bit...........................................................................12
Annular Pressure While Drilling (APWD)...................................................12
Real Time Software Packages......................................................................16
PERFORM...............................................................................................16
Stuck Pipe Indicator SPIN .....................................................................19

Author : Phil Church

Revision 0 : January 2006

Well Engineering & Ops Manager ECA

Section 2 : Real Time Analysis

Approved By : Graham Ritchie

2
IPM Well Engineering & Operations Manager

Copyright c 2006 Schlumberger, Unpublished Work. All rights reserved

Stuck Pipe Manual


Section 2 - Real Time Analysis - How to Monitor the Plan?

( This page is intentionally blank )

Author : Phil Church

Revision 0 : January 2006

Well Engineering & Ops Manager ECA

Section 2 : Real Time Analysis

Approved By : Graham Ritchie

2
IPM Well Engineering & Operations Manager

Copyright c 2006 Schlumberger, Unpublished Work. All rights reserved

Vous aimerez peut-être aussi