This document provides installation and configuration guidelines for ZTE microwave hardware, including the NR8250 and NR8950 models. It details the installation process for indoor and outdoor units, including adjusting polarization modes, installing cables like power and fiber, and grounding intermediate frequency cables according to length. Installation steps are presented for integrated and separate configurations.
Description originale:
Introduction of ZTE MW Hardware Installation Guide
This document provides installation and configuration guidelines for ZTE microwave hardware, including the NR8250 and NR8950 models. It details the installation process for indoor and outdoor units, including adjusting polarization modes, installing cables like power and fiber, and grounding intermediate frequency cables according to length. Installation steps are presented for integrated and separate configurations.
This document provides installation and configuration guidelines for ZTE microwave hardware, including the NR8250 and NR8950 models. It details the installation process for indoor and outdoor units, including adjusting polarization modes, installing cables like power and fiber, and grounding intermediate frequency cables according to length. Installation steps are presented for integrated and separate configurations.
Installing the ODU protective Grounding Cable a. Cut the protective grounding cable and crimp the terminals. b. Fix one terminal of the grounding cable on the grounding screw of the ODU c. Connect the other end of the protective grounding cable to the grounding busbar of the metal tower.
Grounding the IF Cable a. If the antenna is installed on the metal tower , the IF cable should be grounded at a point about 1-2m below the ODU ,and then be grounded at a point 1.5m before the bent part where the cable is routed downwards along the tower . b. If the IF cable is shorten than 20m, it must be grounded at the first two grounding points c. If the IF cable is longer than 20m but shorter than 60m,it must be grounded at the three grounding points d. If the IF cable is longer than 60m, an additional grounding point must be made for every additional 20m IF cable.
ZTE Microwave NR8950 Installation Flow
ZTE Microwave NR8950 Installation Detail
Adjusting the Polarization Mode of an ODU Removing the guide pin
Rotate the guide pin 90deg clockwise
place the guide pin on the hole
ZTE Microwave NR8950 Installation Detail
Integrated Installation(1+0) Remove the waveguide diaphragm
Put the lubricant
ZTE Microwave NR8950 Installation Detail
Integrated Installation(1+0) Install AOU
Fasten screws
ZTE Microwave NR8950 Installation Detail
Separate Installation(1+0) Step 1: Install the ODU installation bracket Step 2: Install the NR8950 on the ODU install bracket
ZTE Microwave NR8950 Installation Detail
Separate Installation(1+0) Step 3: Installing the Flexible Waveguide
Step 4: Fix the Flexible Waveguide and result
ZTE Microwave NR8950 Installation Detail
Separate Installation(2+0) Step 1: Install the ODU installation bracket Step 2: Install the NR8950 on the ODU install bracket
ZTE Microwave NR8950 Installation Detail
Separate Installation(2+0) Step 3: Install the Flexible Waveguide